visibility Similar

STS-135 Launch Day (201107080037HQ)

Space Shuttle Projects, Marshall Space Flight Center

KENNEDY SPACE CENTER, FLA. - In the early morning light, photographers maneuver for the best position to capture Space Shuttle Atlantis as it rolls toward Launch Pad 39B. First motion out of the Vehicle Assembly Building was 1:05 a.m. The shuttle sits on top of the mobile launcher platform, which in turn rests on the crawler-transporter. The slow speed of the crawler results in a 6-hour trek to the pad approximately 4 miles away. Atlantis' launch window begins Aug. 27 for an 11-day mission to the International Space Station. The STS-115 crew of six astronauts will continue construction of the station and install their cargo, the Port 3/4 truss segment with its two large solar arrays. Photo credit: NASA/Troy Cryder KSC-06pd1707

KENNEDY SPACE CENTER, FLA. -- Space Shuttle Endeavour, atop the mobile launcher platform, is hard down on Launch Pad 39A after rolling out overnight. First motion out of the Vehicle Assembly Building was at 8:10 p.m. July 10. The components of the shuttle are, first, the orbiter and then the solid rocket boosters flanking the external tank behind it. To the left of the shuttle is the rotating service structure, which can be rolled around to enclose the vehicle for access during processing. Behind it is the fixed service structure, topped by an 80-foot-tall lightning mast. Extending from it to Endeavour is the orbiter access arm, which provides access into the vehicle. Endeavour is scheduled to launch on mission STS-118 on Aug. 7. During the mission, Endeavour will carry into orbit the S5 truss, SPACEHAB module and external stowage platform 3. The mission is the 22nd flight to the International Space Station and will mark the first flight of Mission Specialist Barbara Morgan, the teacher-turned-astronaut whose association with NASA began more than 20 years ago. STS-118 will be the first flight since 2002 for Endeavour, which has undergone extensive modifications, including the addition of safety upgrades already added to orbiters Discovery and Atlantis. Photo credit: NASA/Ken Thornsley KSC-07pd1852

KENNEDY SPACE CENTER, Fla. -- The Space Shuttle Endeavour rolls out to Launch Pad 39A, the destination of its journey from the Vehicle Assembly Building, for final preparations for liftoff of the STS-89 mission. Endeavour and its crew of seven are targeted for a Jan. 22 launch. STS-89 will be the eighth Shuttle docking with the Russian Space Station Mir as part of Phase 1 of the International Space Station program. Mission Specialist Andy Thomas, Ph.D., will succeed Mission Specialist David Wolf, M.D., as the last NASA astronaut scheduled for a long-duration stay aboard Mir KSC-97PC1817

KENNEDY SPACE CENTER, Fla. -- Sitting atop the mobile launcher platform, Space Shuttle Atlantis wends its way to Launch Pad 39B. The Shuttle is targeted for launch no earlier than July 12 on mission STS-104, the 10th flight to the International Space Station. The payload on the 11-day mission is the Joint Airlock Module, which will allow astronauts and cosmonauts in residence on the Station to perform future spacewalks without the presence of a Space Shuttle. The module, which comprises a crew lock and an equipment lock, will be connected to the starboard (right) side of Node 1 Unity. Atlantis will also carry oxygen and nitrogen storage tanks, vital to operation of the Joint Airlock, on a Spacelab Logistics Double Pallet in the payload bay. The tanks, to be installed on the perimeter of the Joint Module during the mission’s spacewalks, will support future spacewalk operations and experiments plus augment the resupply system for the Station’s Service Module KSC01padig232

CAPE CANAVERAL, Fla. – Space shuttle Atlantis slowly makes its way to the top of Launch Pad 39A at NASA's Kennedy Space Center in Florida after rollout from the Vehicle Assembly Building. The shuttle sits atop the mobile launcher platform, which is carried by the crawler-transporter beneath. First motion was at 3:54 a.m. EDT and Atlantis was secured on the pad at 11:17 a.m. The 3.4-mile trip took about seven-and-a-half hours. Atlantis is targeted to lift off May 12 to service NASA's Hubble Space Telescope. During Atlantis' 11-day mission, the crew of seven astronauts will make the final shuttle flight to Hubble. During five spacewalks, they will install two new instruments, repair two inactive ones and replace components. The result will be six working, complementary science instruments with capabilities beyond what is now available, and an extended operational lifespan for the telescope through at least 2014. Photo credit: NASA/Jack Pfaller KSC-2009-2449

KENNEDY SPACE CENTER, Fla. -- Under gray skies, the Rotating Service Structure rolls back into its protective position around Space Shuttle Endeavour on Launch Pad 39A. The launch of Endeavour on mission STS-99 was delayed when NASA managers decided to replace the Enhanced Master Events Controller that became suspect during the Jan. 31 launch countdown. The next scheduled launch is NET Feb. 9 KSC-00pp0144

KENNEDY SPACE CENTER, Fla. -- Under gray skies, the Rotating Service Structure rolls back into its protective position around Space Shuttle Endeavour on Launch Pad 39A. The launch of Endeavour on mission STS-99 was delayed when NASA managers decided to replace the Enhanced Master Events Controller that became suspect during the Jan. 31 launch countdown. The next scheduled launch is NET Feb. 9 KSC00pp0144

code Related

STS-135 - LAUNCH - Public domain NASA photogrpaph

description

Summary

Description: SEQUENTIAL STILL COVERAGE OF LIFTOFF. FRAME VEHICLE AND LAUNCHER PLUS ONE VEHICLE LENGTH.

* FOCUS ON VEHICLE USING CAMERA FINDER. ** AS SELECTED BY PHOTOGRAPHER.

Item: DD079-39A

Date Taken: 7/8/2011

Image Type: DIGITAL STILLS

STS135 LAUNCH AND LANDING

Nothing Found.

label_outline

Tags

final shuttle mission sts 135 atlantis nasa launch and landing high resolution ultra high resolution one vehicle length frame vehicle vehicle digital stills sts 135 camera finder space shuttle spacecraft launch pad rocket launch space program
date_range

Date

25/07/2005 - 21/07/2011
create

Source

The U.S. National Archives
link

Link

https://catalog.archives.gov/
copyright

Copyright info

No known copyright restrictions

label_outline Explore Digital Stills Sts 135, Final Shuttle Mission, Sts 135 Atlantis

Topics

final shuttle mission sts 135 atlantis nasa launch and landing high resolution ultra high resolution one vehicle length frame vehicle vehicle digital stills sts 135 camera finder space shuttle spacecraft launch pad rocket launch space program