visibility Similar

KENNEDY SPACE CENTER, FLA. - Security is on hand as Space Shuttle Atlantis arrives on Launch Pad 39B via the crawler-transporter. Tracks of the crawler can be seen on the crawlerway. At left of the shuttle are the rotating service structure and fixed service structure. The latter holds the 80-foot lightning mast on top, with its catenary wire extending downward to the left, providing lightning protection. The slow speed of the crawler results in a 6- to 8-hour trek to the pad approximately 4 miles away. Atlantis' launch window begins Aug. 27 for an 11-day mission to the International Space Station. The STS-115 crew of six astronauts will continue construction of the station and install their cargo, the Port 3/4 truss segment with its two large solar arrays. Photo credit: NASA/Tony Gray KSC-06pd1720

KENNEDY SPACE CENTER, FLA. - In the early morning light, photographers maneuver for the best position to capture Space Shuttle Atlantis as it rolls toward Launch Pad 39B. First motion out of the Vehicle Assembly Building was 1:05 a.m. The shuttle sits on top of the mobile launcher platform, which in turn rests on the crawler-transporter. The slow speed of the crawler results in a 6-hour trek to the pad approximately 4 miles away. Atlantis' launch window begins Aug. 27 for an 11-day mission to the International Space Station. The STS-115 crew of six astronauts will continue construction of the station and install their cargo, the Port 3/4 truss segment with its two large solar arrays. Photo credit: NASA/Troy Cryder KSC-06pd1707

STS-127 - EOM - Public domain NASA photogrpaph

CAPE CANAVERAL, Fla. – Space shuttle Endeavour is seen inside the Mate-Demate Device, or MDD, at the Shuttle Landing Facility at NASA's Kennedy Space Center in Florida. The Shuttle Carrier Aircraft, or SCA, is at the lower edge of the ramp. The SCA will carry Endeavour to Los Angeles where it will be placed on public display. Photo credit: NASA/Kim Shiflett KSC-2012-5141

KENNEDY SPACE CENTER, FLA. -- Space Shuttle Endeavour, atop the mobile launcher platform, is hard down on Launch Pad 39A after rolling out overnight. First motion out of the Vehicle Assembly Building was at 8:10 p.m. July 10. The components of the shuttle are, first, the orbiter and then the solid rocket boosters flanking the external tank behind it. To the left of the shuttle is the rotating service structure, which can be rolled around to enclose the vehicle for access during processing. Behind it is the fixed service structure, topped by an 80-foot-tall lightning mast. Extending from it to Endeavour is the orbiter access arm, which provides access into the vehicle. Endeavour is scheduled to launch on mission STS-118 on Aug. 7. During the mission, Endeavour will carry into orbit the S5 truss, SPACEHAB module and external stowage platform 3. The mission is the 22nd flight to the International Space Station and will mark the first flight of Mission Specialist Barbara Morgan, the teacher-turned-astronaut whose association with NASA began more than 20 years ago. STS-118 will be the first flight since 2002 for Endeavour, which has undergone extensive modifications, including the addition of safety upgrades already added to orbiters Discovery and Atlantis. Photo credit: NASA/Ken Thornsley KSC-07pd1852

STS-135 Launch Day (201107080037HQ)

STS-129 - EOM - Public domain NASA photogrpaph

KENNEDY SPACE CENTER, FLA. -- The Space Shuttle Atlantis, atop the mobile launcher platform and crawler-transporter, begins the climb up the ramp to Launch Pad 39A. The crawler-transporter carries its cargo at 1 mph, taking about five hours to cover the 3.4 miles from the Vehicle Assembly Building to the launch pad. A leveling system on the crawler-transporter keeps the top of the Space Shuttle vertical, especially negotiating the ramp leading to the launch pads and when it is raised and lowered on pedestals at the pad. Liftoff of Atlantis on mission STS-101 is scheduled for April 17 at 7:03 p.m. EDT. STS-101 is a logistics and resupply mission for the International Space Station, to restore full redundancy to the International Space Station power system in preparation for the arrival of the next pressurized module, the Russian-built Zvezda KSC00pp0408

STS-114 - LAUNCH - Public domain NASA photogrpaph

code Related

KENNEDY SPACE CENTER, Fla. -- Under gray skies, the Rotating Service Structure rolls back into its protective position around Space Shuttle Endeavour on Launch Pad 39A. The launch of Endeavour on mission STS-99 was delayed when NASA managers decided to replace the Enhanced Master Events Controller that became suspect during the Jan. 31 launch countdown. The next scheduled launch is NET Feb. 9 KSC-00pp0144

KENNEDY SPACE CENTER, Fla. -- Space Shuttle Endeavour sits on Launch Pad 39A waiting for the Rotating Service Structure to be rolled back into its protective position. The launch of Space Shuttle Endeavour on mission STS-99 was delayed when NASA managers decided to replace the Enhanced Master Events Controller that became suspect during the Jan. 31 launch countdown. The next scheduled launch is NET Feb. 9 KSC00pp0142

KENNEDY SPACE CENTER, Fla. -- Cloud cover rolls in behind Space Shuttle Endeavour as the Rotating Service Structure begins rolling back into its protective position on Launch Pad 39A. The launch of Space Shuttle Endeavour on mission STS-99 was delayed when NASA managers decided to replace the Enhanced Master Events Controller that became suspect during the Jan. 31 launch countdown. The next scheduled launch is NET Feb. 9 KSC00pp0143

KENNEDY SPACE CENTER, Fla. -- At Launch Pad 39A, STS-105 Commander Scott Horowitz puts on a gas mask as part of Terminal Countdown Demonstration Test activities, which also include emergency egress, a simulated launch countdown and familiarization with the payload. Mission STS-105 will be transporting the Expedition Three crew, several payloads and scientific experiments to the International Space Station aboard Space Shuttle Discovery. The current Expedition Two crew members on the Station will return to Earth on Discovery. Launch is scheduled no earlier than Aug. 9, 2001 KSC-01pp1330

KENNEDY SPACE CENTER, Fla. -- The Space Shuttle Endeavour rolls out to Launch Pad 39A, the destination of its journey from the Vehicle Assembly Building, for final preparations for liftoff of the STS-89 mission. Endeavour and its crew of seven are targeted for a Jan. 22 launch. STS-89 will be the eighth Shuttle docking with the Russian Space Station Mir as part of Phase 1 of the International Space Station program. Mission Specialist Andy Thomas, Ph.D., will succeed Mission Specialist David Wolf, M.D., as the last NASA astronaut scheduled for a long-duration stay aboard Mir KSC-97PC1823

KENNEDY SPACE CENTER, Fla. -- The Space Shuttle Endeavour rolls out to Launch Pad 39A, the destination of its journey from the Vehicle Assembly Building, for final preparations for liftoff of the STS-89 mission. Endeavour and its crew of seven are targeted for a Jan. 22 launch. STS-89 will be the eighth Shuttle docking with the Russian Space Station Mir as part of Phase 1 of the International Space Station program. Mission Specialist Andy Thomas, Ph.D., will succeed Mission Specialist David Wolf, M.D., as the last NASA astronaut scheduled for a long-duration stay aboard Mir KSC-97PC1817

KENNEDY SPACE CENTER, FLA. -- As the sign on Launch Pad 39A implies, Space Shuttle Columbia is ready for launch. The Rotating Service Structure at left was rolled back late afternoon on Jan. 15. Columbia is scheduled for launch Jan. 16 at 10:39 a.m. EST on mission STS-107, a research mission. There is a 2.5-hour launch window. KSC-03pd0080

KENNEDY SPACE CENTER, Fla. -- The Space Shuttle Endeavour rolls out to Launch Pad 39A, the destination of its journey from the Vehicle Assembly Building, for final preparations for liftoff of the STS-89 mission. Endeavour and its crew of seven are targeted for a Jan. 22 launch. STS-89 will be the eighth Shuttle docking with the Russian Space Station Mir as part of Phase 1 of the International Space Station program. Mission Specialist Andy Thomas, Ph.D., will succeed Mission Specialist David Wolf, M.D., as the last NASA astronaut scheduled for a long-duration stay aboard Mir KSC-97PC1825

KENNEDY SPACE CENTER, FLA. -- Space Shuttle Endeavour blazes into the night sky on mission STS-113. Liftoff from Launch Pad 39A occurred ontime at 7:49:47 p.m. EST. The launch is the 19th for Endeavour, and the 112th flight in the Shuttle program. Mission STS-113 is the 16th assembly flight to the International Space Station, carrying another structure for the Station, the P1 integrated truss. Also onboard are the Expedition 6 crew, who will replace Expedition 5. Endeavour is scheduled to land at KSC after an 11-day journey. KSC-02pp1816

KENNEDY SPACE CENTER, Fla. -- Under gray skies, the Rotating Service Structure rolls back into its protective position around Space Shuttle Endeavour on Launch Pad 39A. The launch of Endeavour on mission STS-99 was delayed when NASA managers decided to replace the Enhanced Master Events Controller that became suspect during the Jan. 31 launch countdown. The next scheduled launch is NET Feb. 9 KSC00pp0144

description

Summary

KENNEDY SPACE CENTER, Fla. -- Under gray skies, the Rotating Service Structure rolls back into its protective position around Space Shuttle Endeavour on Launch Pad 39A. The launch of Endeavour on mission STS-99 was delayed when NASA managers decided to replace the Enhanced Master Events Controller that became suspect during the Jan. 31 launch countdown. The next scheduled launch is NET Feb. 9

The Space Shuttle program was the United States government's manned launch vehicle program from 1981 to 2011, administered by NASA and officially beginning in 1972. The Space Shuttle system—composed of an orbiter launched with two reusable solid rocket boosters and a disposable external fuel tank— carried up to eight astronauts and up to 50,000 lb (23,000 kg) of payload into low Earth orbit (LEO). When its mission was complete, the orbiter would re-enter the Earth's atmosphere and lands as a glider. Although the concept had been explored since the late 1960s, the program formally commenced in 1972 and was the focus of NASA's manned operations after the final Apollo and Skylab flights in the mid-1970s. It started with the launch of the first shuttle Columbia on April 12, 1981, on STS-1. and finished with its last mission, STS-135 flown by Atlantis, in July 2011.

Nothing Found.

label_outline

Tags

kennedy space center skies rolls service structure rolls endeavour space shuttle endeavour launch pad sts mission sts nasa managers master controller master events controller countdown net net feb space shuttle space shuttle on launch pad spacecraft rocket launch nasa
date_range

Date

1960 - 1969
collections

in collections

Space Shuttle Program

place

Location

create

Source

NASA
link

Link

https://images.nasa.gov/
copyright

Copyright info

Public Domain Dedication (CC0)

label_outline Explore Master Events Controller, Nasa Managers, Controller

STS-132 ATLANTIS ROLLOUT FROM VAB TO PAD 39A 2010-2919

A detailed view of the weapons load of an F-16C Falcon from the 52nd Fighter Wing based at Spandahlem AB Germany as it takes on fuel from a 100th Air Expeditionary Wing KC-135R Stratotanker (not shown) from RAF Mildenhall United Kingdom on 31 Mar 99. While patroling the skies over Kosovo during Operation Allied Force, it is armed with AIM-120C missiles on the two outboard stations for self protection and Highspeed Anti Radiation Missiles on the inboard station to suppress anti-aircraft radar sites

A group of men standing next to a barrel of beer. Office of War Information Photograph

US Navy Lieutenant Junior Grade Tara "Judy" Golden monitors a surveillance system inside an E-2C Hawkeye aircraft from Carrier Airborne Early Warning Squadron One two Six (VAW-126) while patrolling the skies of the Persian Gulf on the last day of Operation SOUTHERN WATCH. The Seahawks are embarked on board USS HARRY S. TRUMAN (CVN 75)

A Danish F-35 Draken aircraft rolls down the runway during the NATO exercise Tactical Fighter Weaponry '89

Photo of Purse, 18th century - Public domain dedication

CAPE CANAVERAL, Fla. – The STS-128 crew members gather on the 225-foot level of NASA Kennedy Space Center's fixed service structure. From left are Commander Rick Sturckow, Mission Specialists Danny Olivas and Christer Fuglesang, Pilot Kevin Ford and Mission Specialists Nicole Stott, Patrick Forrester and Jose Hernandez. Mission crew members are at Kennedy to take part in the terminal countdown demonstration test, or TCDT, which includes emergency exit training and culminates in the simulated countdown. On the STS-128 mission, Discovery will deliver 33,000 pounds of equipment to the station, including science and storage racks, a freezer to store research samples, a new sleeping compartment and the COLBERT treadmill. Launch is targeted for late August. Photo credit: NASA/Kim Shiflett KSC-2009-4554

KENNEDY SPACE CENTER, FLA. -- After leaving the Orbiter Processing Facility bay 2, the orbiter Endeavour, atop its transporter, rolls toward the Vehicle Assembly Building. In the VAB, it will be stacked with the external tank and solid rocket boosters atop the mobile launcher platform for its launch on mission STS-118. The mission will be Endeavour's first flight in more than four years. The shuttle has undergone extensive modifications, including the addition of safety upgrades already added to shuttles Discovery and Atlantis. Endeavour also features new hardware, such as the Station-to-Shuttle Power Transfer System that will allow the docked shuttle to draw electrical power from the station and extend its visits to the orbiting lab. Endeavour is targeted for launch on Aug. 7. Photo credit: NASA/Kim Shiflett KSC-07pd1709

CAPE CANAVERAL, Fla. -- Space shuttle Discovery is attached to Launch Pad 39A as the sun rises over NASA's Kennedy Space Center in Florida. It took the spacecraft about six hours to make the journey, known as "rollout," from the Vehicle Assembly Building to the pad. Rollout sets the stage for Discovery's STS-133 crew to practice countdown and launch procedures during the Terminal Countdown Demonstration Test in mid-October. Targeted to liftoff Nov. 1, Discovery will take the Permanent Multipurpose Module (PMM) packed with supplies and critical spare parts, as well as Robonaut 2 (R2) to the International Space Station. Photo credit: NASA/Jack Pfaller KSC-2010-4736

Detroit, Michigan. Assembly of Rolls Royce engines at the Packard motor car company. Dropping engine on a horse before weighing it

The Marine Corps continues to upgrade the turret system

CAPE CANAVERAL, Fla. -- Space shuttle Endeavour rolls to a stop on the Shuttle Landing Facility's Runway 15 at NASA's Kennedy Space Center in Florida for the final time. Main gear touchdown was at 2:34:51 a.m. EDT, followed by nose gear touchdown at 2:35:04 a.m., and wheelstop at 2:35:36 a.m. On board are STS-134 Commander Mark Kelly, Pilot Greg H. Johnson, and Mission Specialists Mike Fincke, Drew Feustel, Greg Chamitoff and the European Space Agency's Roberto Vittori. STS-134 delivered the Alpha Magnetic Spectrometer-2 (AMS) and the Express Logistics Carrier-3 (ELC-3) to the International Space Station. AMS will help researchers understand the origin of the universe and search for evidence of dark matter, strange matter and antimatter from the station. ELC-3 carried spare parts that will sustain station operations once the shuttles are retired from service. STS-134 was the 25th and final flight for Endeavour, which has spent 299 days in space, orbited Earth 4,671 times and traveled 122,883,151 miles. Photo credit: NASA/Kevin O'Connell KSC-2011-4192

Topics

kennedy space center skies rolls service structure rolls endeavour space shuttle endeavour launch pad sts mission sts nasa managers master controller master events controller countdown net net feb space shuttle space shuttle on launch pad spacecraft rocket launch nasa