visibility Similar

KENNEDY SPACE CENTER, FLA. - In the Orbiter Processing Facility at NASA's Kennedy Space Center, STS-115 crew members inspect equipment in Atlantis's payload bay. From left are Mission Specialists Joseph Tanner and Heidemarie Stefanyshyn-Piper. The crew is at KSC for Crew Equipment Interface Test activities, which involves equipment familiarization, a routine part of astronaut training and launch preparations. The STS-115 mission will deliver the second port truss segment, the P3/P4 truss, to the International Space Station. The crew will attach the P3 to the first port truss segment, the P1 truss, as well as deploy solar array set 2A and 4A. Launch on Space Shuttle Atlantis is scheduled for late August. Photo credit: NASA/Kim Shiflett KSC-06pd1206

KENNEDY SPACE CENTER, FLA. -- Inside the payload bay of Space Shuttle orbiter Endeavour, workers and STS-88 crew members on a movable work platform or bucket move closer to the rear of the orbiter's crew compartment. While Endeavour is being prepared for flight inside Orbiter Processing Facility Bay 1, the STS-88 crew members are participating in a Crew Equipment Interface Test (CEIT) to familiarize themselves with the orbiter's midbody and crew compartments. A KSC worker (left) maneuvers the platform to give Mission Specialists Jerry L. Ross and James H. Newman (right) a closer look. Looking on is Wayne Wedlake of United Space Alliance at Johnson Space Center. Targeted for liftoff on Dec. 3, 1998, STS-88 will be the first Space Shuttle launch for assembly of the International Space Station (ISS). The primary payload is the Unity connecting module which will be mated to the Russian-built Zarya control module, expected to be already on orbit after a November launch from Russia. After the mating, Ross and Newman are scheduled to perform three spacewalks to connect power, data and utility lines and install exterior equipment. The first major U.S.-built component of ISS, Unity will serve as a connecting passageway to living and working areas of the space station. Unity has two attached pressurized mating adapters (PMAs) and one stowage rack installed inside. PMA-1 provides the permanent connection point between Unity and Zarya; PMA-2 will serve as a Space Shuttle docking port. Zarya is a self-supporting active vehicle, providing propulsive control capability and power during the early assembly stages. It also has fuel storage capability KSC-98pc1216

Thermal Infrared Sensor (TIRS) INSTRUMENT

Boswell Bay White Alice Site, Radio Relay Building, Chugach National Forest, Cordova, Valdez-Cordova Census Area, AK

KENNEDY SPACE CENTER, Fla. -- From a vantage point below it, members of the STS-110 crew check out Integrated Truss Structure (ITS) S0, which is in the Operations and Checkout Building. From left are Mission Specialists Rex J. Walheim, Jerry L. Ross and Lee M. Morin. They and other crew members are taking part in a Crew Equipment Interface Test at KSC. Not shown are Commander Michael J. Bloomfield, Pilot Stephen N. Frick, and Mission Specialists Steven L. Smith and Ellen Ochoa. The ITS S0 is part of the payload on the mission. It is the center segment they will be installing on the International Space Station, part of the 300-foot (91-meter) truss attached to the U.S. Lab. By assembly completion, four more truss segments will attach to either side of the S0 truss. STS-110 is currently scheduled to launch in February 2002 KSC-01pp1567

U.S. Army Chief of Staff Gen. Mark A. Milley visits

HIGH BAY AREA, NASA Technology Images

US COAST GUARD AMT Competition U.S. Coast Guard photograph

TEST RIGS, NASA Technology Images

code Related

Diagnostic equipment is strapped down in a Rapid Assistance

description

Summary

Diagnostic equipment is strapped down in a Rapid Assistance Support for Calibration (RASCAL) Jan. 14, 2019, at Mountain Home Air Force Base, Idaho. The team restored and prepared this RASCAL, which is one of two of its kind in the Air Force, for its first deployment in 10 years to Joint Base Pearl Harbor - Hickam, Hawaii. (U.S. Air Force photo by Airman First Class Andrew Kobialka)

label_outline

Tags

acc pmel restoration readiness deployment mountain home afb muns innovation rascal airman 1st class andrew kobialka 366th fighter wing public affairs mountain home air force base operation restore paradise enhances readiness through adaptive basing dvids ultra high resolution high resolution idaho
date_range

Date

14/01/2019
place

Location

create

Source

Defense Visual Information Distribution Service
link

Link

https://www.dvidshub.net/
copyright

Copyright info

Public Domain Dedication. Public Use Notice of Limitations: https://www.dvidshub.net/about/copyright

label_outline Explore Rascal, Pmel, Airman 1st Class Andrew Kobialka

Topics

acc pmel restoration readiness deployment mountain home afb muns innovation rascal airman 1st class andrew kobialka 366th fighter wing public affairs mountain home air force base operation restore paradise enhances readiness through adaptive basing dvids ultra high resolution high resolution idaho