visibility Similar

code Related

Orion at Hydro Impact Basin Phase 1

description

Summary

Orion at Hydro Impact Basin Engineers conducted the first test as part of Phase 1 of the Orion boilerplate test article at NASA's Langley Research Center, on Oct. 18.

label_outline

Tags

orion crew module lrc sean smith langley research center hydro impact basin phase hydro impact basin phase high resolution fountain park nasa
date_range

Date

12/09/2012
create

Source

NASA
link

Link

https://images.nasa.gov/
copyright

Copyright info

Public Domain Dedication (CC0)

label_outline Explore Hydro Impact Basin Phase, Sean Smith, Hydro

Dams under construction. Watts Bar Dam, shown here under construction, has a semi-outdoors type powerhouse with an enormous gantry crane (to the right of the picture) for installation and removal of units. The project is further distinguished by a control building which is entirely removed from the hydro plant, being located some 120 feet higher on top of a steep cliff and with direct connection to the switchyard behind. The windowless left wing of the control building houses the control room; the tower-like structure in the back accomodates air conditioning, restrooms, etc. The glass wall, upper level, contains the reception room with a broad semi-circular overlook terrace, the story below the terrace devoted to offices

Grand Basin and Plaza of St. Louis from Festival Hall, Louisiana Purchase Exposition, St. Louis, Mo., U. S. A.

An ophthalmologist and medical technicians prepare to remove a cataract from a patient in an operating room aboard the hospital ship USNS MERCY (T-AH-19). The ship is visiting various ports in the Philippines during the first phase of its five-month humanitarian medical service and training mission. While in the Philippines, U.S. Navy, Army and Air Force medical personnel embarked aboard the MERCY are providing treatment for indigent Filipinos, both ashore and aboard ship

[African American woman, seated on ground, fishing, at the Tidal Basin, Washington, D.C.]

ORION Project-(SPLASH) Structural Passive Landing Attenuation fo

[Assignment: 48-DPA-07-25-08_SOI_K_Boston] Visit of Secretary Dirk Kempthorne to the Old State House in Boston, Massachusetts, [where he joined National Park Service Director Mary Bomar, Boston National Historical Park Superintendent Terry Savage, Bostonian Society Executive Director Brian LeMay, Boston Environmental and Energy Services Chief James Hunt III, and other officials at event marking the completion of the initial phase of the Old State House restoration, including restoration of the building's famous tower [48-DPA-07-25-08_SOI_K_Boston_IOD_1131.JPG]

Water supply: an open settling basin from the irrigation ditch in a California squatter camp near Calipatria

Construction site of the Phase III housing project located at MacDill Air Force Base, Florida

Family members from the 2nd Battalion, 325th Airborne

The Basin, Franconia Notch, N.H. New Hampshire in 19th century. Stereoscope card.

[Highlight views:} Hurricane Katrina impact in Mississippi

Cross Cut Hydro Plant, North Side of Salt River, Tempe, Maricopa County, AZ

Topics

orion crew module lrc sean smith langley research center hydro impact basin phase hydro impact basin phase high resolution fountain park nasa