visibility Similar

Orion at Hydro Impact Basin Phase 1

description

Summary

Orion at Hydro Impact Basin Engineers conducted the first test as part of Phase 1 of the Orion boilerplate test article at NASA's Langley Research Center, on Oct. 18.

Nothing Found.

label_outline

Tags

orion crew module lrc sean smith langley research center hydro impact basin phase hydro impact basin phase high resolution nasa
date_range

Date

18/10/2011
create

Source

NASA
link

Link

https://images.nasa.gov/
copyright

Copyright info

Public Domain Dedication (CC0)

label_outline Explore Hydro Impact Basin Phase, Sean Smith, Hydro

Dams under construction. Watts Bar Dam, shown here under construction, has a semi-outdoors type powerhouse with an enormous gantry crane (to the right of the picture) for installation and removal of units. The project is further distinguished by a control building which is entirely removed from the hydro plant, being located some 120 feet higher on top of a steep cliff and with direct connection to the switchyard behind. The windowless left wing of the control building houses the control room; the tower-like structure in the back accomodates air conditioning, restrooms, etc. The glass wall, upper level, contains the reception room with a broad semi-circular overlook terrace, the story below the terrace devoted to offices

NASA's Lunar Reconnaissance Orbiter (LRO) spacecraft LCROSS IMPACT EVENT at Goddard Space Flight Center

Cross Cut Hydro Plant, North Side of Salt River, Tempe, Maricopa County, AZ

U.S. Army Capt. Lisa Harris, an 82nd Combat Aviation

The United States Air Force Honor Guard ceremonial

[Assignment: 48-DPA-07-25-08_SOI_K_Boston] Visit of Secretary Dirk Kempthorne to the Old State House in Boston, Massachusetts, [where he joined National Park Service Director Mary Bomar, Boston National Historical Park Superintendent Terry Savage, Bostonian Society Executive Director Brian LeMay, Boston Environmental and Energy Services Chief James Hunt III, and other officials at event marking the completion of the initial phase of the Old State House restoration, including restoration of the building's famous tower [48-DPA-07-25-08_SOI_K_Boston_IOD_1128.JPG]

U.S. Airmen from the 31st Maintenance Squadron hydraulic

[Assignment: 48-DPA-10-16-08_SOI_K_WBR_Dam] Visit of Secretary Dirk Kempthorne to Durango, Colorado, [for participation in ceremonies marking the near completion of the main features of the] Bureau of Reclamation's [Animas-La Plata Project, including construction of the] Ridges Basin Dam [and Basin Creek drop structures, the Durango Pumping Plant, and Ridges Basin Inlet Conduit [48-DPA-10-16-08_SOI_K_WBR_Dam_DOI_1509.JPG]

ISS Phase One Activities and Manufacturing in Russia, France and Italy

Severe Storm ^ Tornado - Moore, Okla. , May 25, 2010 -- The impact of a baseball-sized hail stone is evident on the windshield of a city service vehicle. City and county municipalities in the eastern half of the state experienced damages and losses to their buildings and other property caused by 22 confirmed tornadoes on May 10. FEMA Photo by Win Henderson

Warren Kealoha, Hawaiian olympic swimmer at Tidal Basin, [Washington, D.C.], 8/7/24

U.S. Air Force Staff Sgt. Kristopher Voak, 31st Maintenance

Topics

orion crew module lrc sean smith langley research center hydro impact basin phase hydro impact basin phase high resolution nasa