visibility Similar

STS090-326-018 - STS-090 - Hire performs maintenance on the RAHF

KENNEDY SPACE CENTER, FLA. -- In the Orbiter Processing Facility, STS-111 Mission Specialists Philippe Perrin, with the French Space Agency, and Franklin Chang-Diaz pause during their checkout of the payload installed in Endeavour's payload bay. The crew is at KSC for Terminal Countdown Demonstration Test activities, which include payload familiarization and a simulated launch countdown. The crew also comprises Commander Kenneth Cockrell and Pilot Paul Lockhart. The payload on the mission to the International Space Station includes the Mobile Base System, an Orbital Replacement Unit and Multi-Purpose Logistics Module Leonardo. Traveling on Endeavour is also the Expedition 5 crew - Commander Valeri Korzun, Peggy Whitson and Sergei Treschev -- who will replace the Expedition 4 crew on the Station. Korzun and Treschev are with the Russian Space Agency. Launch of Endeavour is scheduled for May 30, 2002. KSC-02pd0707

Members of the Kentucky Air National Guard 123rd Contingency

DISCOVERY CHALLENGE - U.S. National Archives Public Domain photograph

INSTRUMENT PANELS IN CONTROL ROOM

Cape Canaveral Air Force Station, Launch Complex 39, Mobile Launcher Platforms, Launcher Road, East of Kennedy Parkway North, Cape Canaveral, Brevard County, FL

NASA's Lunar Reconnaissance Orbiter (LRO) spacecraft

ASDAR PROJECT, NASA Technology Images

KENNEDY SPACE CENTER, FLA. - In the Space Station Processing Facility, members of several Space Shuttle mission crews get a close look at the Video Stanchion Support Assembly (VSSA) that will fly on STS-114 (Logistics Flight 1). Holding one piece at left are STS-116 Mission Specialist Christer Fuglesang (European Space Agency) and STS-121 Mission Specialist Carlos Noriega. Looking at the VSSA on the table is STS-114 Mission Specialist Andrew Thomas. The crews are at KSC for equipment familiarization. KSC-04pd0884

code Related

KENNEDY SPACE CENTER, FLA. -- Working near the top of a solid rocket booster, NASA and United Space Alliance SRB technicians hook up SRB cables to a Cirris Signature Touch 1 cable tester. From left are Steve Swichkow, with NASA, and Jim Silviano (back to camera) and Jeff Suter, with USA. The SRB is part of Space Shuttle Atlantis, rolled back from Launch Pad 39A in order to conduct tests on the cables. A prior extensive evaluation of NASA’s SRB cable inventory on the shelf revealed conductor damage in four (of about 200) cables. Shuttle managers decided to prove the integrity of the system tunnel cables already on Atlantis before launching. Workers are conducting inspections, making continuity checks and conducting X-ray analysis on the cables. The launch has been rescheduled no earlier than Feb. 6. <br KSC01pp0155

KENNEDY SPACE CENTER, FLA. -- NASA and United Space Alliance SRB technicians hook up solid rocket booster cables to a Cirris Signature Touch 1 cable tester. From left are Loren Atkinson and Steve Swichkow, with NASA, and Jeff Suter, with USA. The SRB is part of Space Shuttle Atlantis, rolled back from Launch Pad 39A in order to conduct tests on the cables. A prior extensive evaluation of NASA’s SRB cable inventory on the shelf revealed conductor damage in four (of about 200) cables. Shuttle managers decided to prove the integrity of the system tunnel cables already on Atlantis before launching. Workers are conducting inspections, making continuity checks and conducting X-ray analysis on the cables. The launch has been rescheduled no earlier than Feb. 6. <br KSC01pp0154

KENNEDY SPACE CENTER, FLA. -- Near the bottom of the solid rocket booster, a United Space Alliance SRB technician in the Vehicle Assembly Building detaches the SRB system tunnel cover of the 36 cables inside. Above and to the left is the bottom of the external tank. The SRB is part of Space Shuttle Atlantis, rolled back from Launch Pad 39A in order to conduct tests on the cables. A prior extensive evaluation of NASA’s SRB cable inventory on the shelf revealed conductor damage in four (of about 200) cables. Shuttle managers decided to prove the integrity of the system tunnel cables already on Atlantis before launching. Workers are conducting inspections, making continuity checks and conducting X-ray analysis on the cables. The launch has been rescheduled no earlier than Feb. 6. <br KSC01pp0148

KENNEDY SPACE CENTER, FLA. -- In the Vehicle Assembly Building, near the top of the solid rocket booster, Henry Jones and Richard Bruns begin to detach the SRB system tunnel cover on the 36 cables inside. Jones and Bruns are United Space Alliance SRB technicians. The SRB is part of Space Shuttle Atlantis, rolled back from Launch Pad 39A in order to conduct tests on the cables. A prior extensive evaluation of NASA’s SRB cable inventory on the shelf revealed conductor damage in four (of about 200) cables. Shuttle managers decided to prove the integrity of the system tunnel cables already on Atlantis before launching. Workers are conducting inspections, making continuity checks and conducting X-ray analysis on the cables. The launch has been rescheduled no earlier than Feb. 6.<br KSC01pp0145

KENNEDY SPACE CENTER, FLA. -- Near the bottom of the solid rocket booster in the Vehicle Assembly Building, a United Space Alliance SRB technician detaches the SRB system tunnel cover on the 36 cables inside. The SRB is part of Space Shuttle Atlantis, rolled back from Launch Pad 39A in order to conduct tests on the cables. A prior extensive evaluation of NASA’s SRB cable inventory on the shelf revealed conductor damage in four (of about 200) cables. Shuttle managers decided to prove the integrity of the system tunnel cables already on Atlantis before launching. Workers are conducting inspections, making continuity checks and conducting X-ray analysis on the cables. The launch has been rescheduled no earlier than Feb. 6 KSC01pp0147

KENNEDY SPACE CENTER, FLA. -- United Space Alliance SRB technician Jim Glass conducts a Flex test on a cable on the solid rocket booster at left. The SRB is part of Space Shuttle Atlantis, rolled back from Launch Pad 39A in order to conduct tests on the cables. A prior extensive evaluation of NASA’s SRB cable inventory on the shelf revealed conductor damage in four (of about 200) cables. Shuttle managers decided to prove the integrity of the system tunnel cables already on Atlantis before launching. Workers are conducting inspections, making continuity checks and conducting X-ray analysis on the cables. The launch has been rescheduled no earlier than Feb. 6. <br KSC01pp0157

KENNEDY SPACE CENTER, FLA. -- In the Vehicle Assembly Building, United Space Alliance SRB technician Frank Meyer pulls cables out of the solid rocket booster system tunnel. Cable end covers are in a box near his feet. The SRB is part of Space Shuttle Atlantis, rolled back from Launch Pad 39A in order to conduct tests on the cables. A prior extensive evaluation of NASA’s SRB cable inventory on the shelf revealed conductor damage in four (of about 200) cables. Shuttle managers decided to prove the integrity of the system tunnel cables already on Atlantis before launching. Workers are conducting inspections, making continuity checks and conducting X-ray analysis on the cables. The launch has been rescheduled no earlier than Feb. 6. <br KSC01pp0152

KENNEDY SPACE CENTER, FLA. -- In the Vehicle Assembly Building, Richard Bruns, a United Space Alliance SRB technician, begins to detach the SRB system tunnel cover on the 36 cables inside. The SRB is part of Space Shuttle Atlantis, rolled back from Launch Pad 39A in order to conduct tests on the cables. A prior extensive evaluation of NASA’s SRB cable inventory on the shelf revealed conductor damage in four (of about 200) cables. Shuttle managers decided to prove the integrity of the system tunnel cables already on Atlantis before launching. Workers are conducting inspections, making continuity checks and conducting X-ray analysis on the cables. The launch has been rescheduled no earlier than Feb. 6. <br KSC01pp0143

KENNEDY SPACE CENTER, FLA. -- In the Vehicle Assembly Building, Richard Bruns, a United Space Alliance SRB technician, pulls cables out of the solid rocket booster system tunnel. The SRB is part of Space Shuttle Atlantis, rolled back from Launch Pad 39A in order to conduct tests on the cables. A prior extensive evaluation of NASA’s SRB cable inventory on the shelf revealed conductor damage in four (of about 200) cables. Shuttle managers decided to prove the integrity of the system tunnel cables already on Atlantis before launching. Workers are conducting inspections, making continuity checks and conducting X-ray analysis on the cables. The launch has been rescheduled no earlier than Feb. 6. <br KSC01pp0151

KENNEDY SPACE CENTER, FLA. -- Working near the top of a solid rocket booster, NASA and United Space Alliance SRB technicians hook up SRB cables to a CIRRUS computer for testing. From left are Jim Glass, with USA, performing a Flex test on the cable; Steve Swichkow, with NASA, and Jim Silviano, with USA, check the results on a computer. The SRB is part of Space Shuttle Atlantis, rolled back from Launch Pad 39A in order to conduct tests on the cables. A prior extensive evaluation of NASA’s SRB cable inventory on the shelf revealed conductor damage in four (of about 200) cables. Shuttle managers decided to prove the integrity of the system tunnel cables already on Atlantis before launching. Workers are conducting inspections, making continuity checks and conducting X-ray analysis on the cables. The launch has been rescheduled no earlier than Feb. 6. <br KSC01pp0156

description

Summary

KENNEDY SPACE CENTER, FLA. -- Working near the top of a solid rocket booster, NASA and United Space Alliance SRB technicians hook up SRB cables to a CIRRUS computer for testing. From left are Jim Glass, with USA, performing a Flex test on the cable; Steve Swichkow, with NASA, and Jim Silviano, with USA, check the results on a computer. The SRB is part of Space Shuttle Atlantis, rolled back from Launch Pad 39A in order to conduct tests on the cables. A prior extensive evaluation of NASA’s SRB cable inventory on the shelf revealed conductor damage in four (of about 200) cables. Shuttle managers decided to prove the integrity of the system tunnel cables already on Atlantis before launching. Workers are conducting inspections, making continuity checks and conducting X-ray analysis on the cables. The launch has been rescheduled no earlier than Feb. 6. <br

The Space Shuttle program was the United States government's manned launch vehicle program from 1981 to 2011, administered by NASA and officially beginning in 1972. The Space Shuttle system—composed of an orbiter launched with two reusable solid rocket boosters and a disposable external fuel tank— carried up to eight astronauts and up to 50,000 lb (23,000 kg) of payload into low Earth orbit (LEO). When its mission was complete, the orbiter would re-enter the Earth's atmosphere and lands as a glider. Although the concept had been explored since the late 1960s, the program formally commenced in 1972 and was the focus of NASA's manned operations after the final Apollo and Skylab flights in the mid-1970s. It started with the launch of the first shuttle Columbia on April 12, 1981, on STS-1. and finished with its last mission, STS-135 flown by Atlantis, in July 2011.

Space Shuttle Atlantis was a space shuttle that was operated by NASA as part of the Space Shuttle program. It was the fourth operational shuttle built, and the last one to be built before the program was retired in 2011. Atlantis was named after the first research vessel operated by the Woods Hole Oceanographic Institution, and it made its first flight in October 1985. Over the course of its career, Atlantis completed 33 missions and spent a total of 307 days in space. Its last mission was STS-135, which was the final mission of the Space Shuttle program. Atlantis is now on display at the Kennedy Space Center Visitor Complex in Florida. Space Shuttle Atlantis (Orbiter Vehicle Designation: OV-104) was one of the four first operational orbiters in the Space Shuttle fleet of NASA, the space agency of the United States. (The other two are Discovery and Endeavour.) Atlantis was the fourth operational shuttle built. Atlantis is named after a two-masted sailing ship that operated from 1930 to 1966 for the Woods Hole Oceanographic Institute. Atlantis performed well in 25 years of service, flying 33 missions.

Nothing Found.

label_outline

Tags

kennedy space center rocket booster rocket booster srb technicians hook space alliance srb technicians hook cables srb cables cirrus computer cirrus computer jim glass jim glass flex test flex test steve swichkow steve swichkow silviano jim silviano check results atlantis space shuttle atlantis launch pad order conduct tests nasa srb cable inventory conductor damage conductor damage shuttle managers integrity system tunnel system tunnel cables workers inspections continuity continuity checks x ray analysis x ray analysis space shuttle nasa
date_range

Date

20/01/2001
collections

in collections

Space Shuttle Program

Space Shuttle Atlantis

The Fourth Pperational Shuttle Built
place

Location

create

Source

NASA
link

Link

https://images.nasa.gov/
copyright

Copyright info

Public Domain Dedication (CC0)

label_outline Explore X Ray Analysis, Continuity Checks, Conduct Tests

STS085-316-013 - STS-085 - FLEX GORP and BUB fluid disks for RME 1328, MIM

STS055-45-012 - STS-055 - Sunrise and Earth Limb, high cirrus clouds silhouetted in the sun glow.

A plane flying through a blue sky with white clouds. Cirrus cirrus intortus clouds, backgrounds textures.

U.S. Marine Corps Cpl. Alex Wallace, logistics technician

At launch pad 36-A, Cape Canaveral Air Force Station, workers check over the second stage of an Atlas II/Centaur rocket before it is lifted up the gantry (behind it) for mating with the first stage. Atlas II is designed to launch payloads into low earth orbit, geosynchronous transfer orbit or geosynchronous orbit. The rocket is the launch vehicle for the GOES-L satellite, part of the NOAA National Weather Service system in weather imagery and atmospheric sounding information. The primary objective of the GOES-L is to provide a full capability satellite in an on-orbit storage condition, to assure NOAA continuity in services from a two-satellite constellation. Launch services are being provided by the 45th Space Wing KSC00pp0424

STS085-312-010 - STS-085 - RME 1328, MIM - PS Tryggvason works with FLEX experiment

STS085-356-025 - STS-085 - RME 1328, MIM - Tryggvason works with the FLEX experiment

Newly designed large mobile air traffic control tower (LMATCT) are staged at Weapons Station Charleston on Joint Base Charleston in preparation for final inspections and electronics testing.

Production. Pratt and Whitney airplane engines. Careful inspections between honings assure compliance with rigid standards in making the master piston rods for Pratt and Whitney airplane engines. The superior performance of the engines, in which rods like this are used, depends upon faithful adherence to specifications. Pratt and Whitney Aircraft

CAPE CANAVERAL, Fla. -- Freedom Star, one of NASA's solid rocket booster retrieval ships, pulls the Space Shuttle Program's last external fuel tank, ET-122, toward NASA's Kennedy Space Center in Florida. The tank traveled 900 miles by sea from NASA's Michoud Assembly Facility in New Orleans aboard the Pegasus Barge. After reaching the Turn Basin at Kennedy, the tank will be offloaded and moved to the Vehicle Assembly Building where it eventually will be attached to space shuttle Endeavour for the STS-134 mission to the International Space Station. STS-134, targeted to launch in Feb. 2011, currently is scheduled to be the last mission in the Space Shuttle Program. The tank, which is the largest element of the space shuttle stack, was damaged during Hurricane Katrina in August 2005 and restored to flight configuration by Lockheed Martin Space Systems Company employees. Photo credit: NASA/Kim Shiflett KSC-2010-4850

A plane flying through a blue sky with white clouds. Sky clouds blue, backgrounds textures.

A group of birds sitting on top of a tree. Tree poplar white poplar.

Topics

kennedy space center rocket booster rocket booster srb technicians hook space alliance srb technicians hook cables srb cables cirrus computer cirrus computer jim glass jim glass flex test flex test steve swichkow steve swichkow silviano jim silviano check results atlantis space shuttle atlantis launch pad order conduct tests nasa srb cable inventory conductor damage conductor damage shuttle managers integrity system tunnel system tunnel cables workers inspections continuity continuity checks x ray analysis x ray analysis space shuttle nasa