visibility Similar

STS-131 - EOM - Public domain NASA photogrpaph

CAPE CANAVERAL, Fla. -- In the early morning hours after landing, space shuttle Endeavour's "towback" vehicle slowly pulls it from the Shuttle Landing Facility to Orbiter Processing Facility-1 at NASA's Kennedy Space Center in Florida. A purge unit that pumps conditioned air into a shuttle after landing is connected to Endeavour's aft end. Once inside the processing facility, Endeavour will be prepared for future public display. Endeavour's final return from space completed the 16-day, 6.5-million-mile STS-134 mission. Main gear touchdown was at 2:34:51 a.m. EDT, followed by nose gear touchdown at 2:35:04 a.m., and wheelstop at 2:35:36 a.m. Endeavour and its crew delivered the Alpha Magnetic Spectrometer-2 (AMS) and the Express Logistics Carrier-3 (ELC-3) to the International Space Station. AMS will help researchers understand the origin of the universe and search for evidence of dark matter, strange matter and antimatter from the station. ELC-3 carried spare parts that will sustain station operations once the shuttles are retired from service. STS-134 was the 25th and final flight for Endeavour, which spent 299 days in space, orbited Earth 4,671 times and traveled 122,883,151 miles. Photo credit: NASA/Jack Pfaller KSC-2011-4266

KENNEDY SPACE CENTER, FLA. -- Space Shuttle Atlantis moves through the doors of the Vehicle Assembly Building on its rollout to Launch Pad 39A. Atlantis will fly on mission STS-98, the seventh construction flight to the International Space Station. The orbiter will carry in its payload bay the U.S. Laboratory, named Destiny, that will have five system racks already installed inside the module. After delivery of electronics in the lab, electrically powered attitude control for Control Moment Gyroscopes will be activated. Atlantis is scheduled for launch no earlier than Jan. 19, 2001, with a crew of five KSC01pp0004

KENNEDY SPACE CENTER, FLA. -- Atlantis rolls out to Pad 39B for mission STS-81 KSC-96pc1345

STS-124 - EOM - Public domain NASA photogrpaph

Shuttle and 747 in the Mate-Demate Device (MDD)

STS-133 - EOM - Public domain NASA photogrpaph

KENNEDY SPACE CENTER, FLA. -- On the shortest day of the year, Discovery touches down on Runway 15 at NASA Kennedy Space Center's Shuttle Landing Facility as the sun sets, concluding mission STS-116. Aboard are Commander Mark Polansky, Pilot William Oefelein, and Mission Specialists Robert Curbeam, Joan Higginbotham, Nicholas Patrick and Christer Fuglesang, who represents the European Space Agency, as well as Thomas Reiter, who is returning from a 6-month stay on the International Space Station. During the mission, three spacewalks attached the P5 integrated truss structure to the station, and completed the rewiring of the orbiting laboratory’s power system. A fourth spacewalk retracted a stubborn solar array. Main gear touchdown was at 5:32 p.m. EST. Nose gear touchdown was at 5:32:12 p.m. and wheel stop was at 5:32:52 p.m. At touchdown -- nominally about 2,500 ft. beyond the runway threshold -- the orbiter is traveling at a speed ranging from 213 to 226 mph. Discovery traveled 5,330,000 miles, landing on orbit 204. Mission elapsed time was 12 days, 20 hours, 44 minutes and 16 seconds. This is the 64th landing at KSC. Photo credit: NASA/Kim Shiflett KSC-06pd2852

STS-129 - EOM - Public domain NASA photogrpaph

code Related

KENNEDY SPACE CENTER, FLA. -- Space Shuttle <a href="../../subjects/atlantis.htm"> Atlantis</a> moves past palm trees on its way back to the <a href="../../subjects/vab.htm"> Vehicle Assembly Building</a> from <a href="../../subjects/lc39a.htm"> Launch Pad 39A</a>. Atlantis is rolling back to the VAB from Launch Pad 39A. In the VAB workers will conduct inspections, make continuity checks and conduct X-ray analysis on the 36 solid rocket booster cables located inside each booster’s external system tunnel. An extensive evaluation of NASA’s SRB cable inventory revealed conductor damage in four (of about 200) cables on the shelf. Shuttle managers decided to prove the integrity of the system tunnel cables already on Atlantis before launching. The launch has been rescheduled no earlier than Feb. 6 KSC01pp0137

KENNEDY SPACE CENTER, FLA. -- From across the turn basin can be seen Space Shuttle <a href="../../subjects/atlantis.htm"> Atlantis</a> approaching the <a href="../../subjects/vab.htm"> Vehicle Assembly Building</a> (at left). Atlantis is rolling back to the VAB from <a href="../../subjects/lc39a.htm"> Launch Pad 39A</a>. In the VAB workers will conduct inspections, make continuity checks and conduct X-ray analysis on the 36 solid rocket booster cables located inside each booster’s external system tunnel. An extensive evaluation of NASA’s SRB cable inventory revealed conductor damage in four (of about 200) cables on the shelf. Shuttle managers decided to prove the integrity of the system tunnel cables already on Atlantis before launching. The launch has been rescheduled no earlier than Feb. 6 KSC01pp0138

KENNEDY SPACE CENTER, FLA. -- Dwarfing the vehicles on the road alongside the crawlerway, Space Shuttle <a href="../../subjects/atlantis.htm"> Atlantis</a> rolls back to the <a href="../../subjects/vab.htm"> Vehicle Assembly Building</a> from <a href="../../subjects/lc39a.htm"> Launch Pad 39A</a> via the crawler-transporter underneath the Mobile Launcher Platform. In the VAB workers will conduct inspections, make continuity checks and conduct X-ray analysis on the 36 solid rocket booster cables located inside each booster’s external system tunnel. An extensive evaluation of NASA’s SRB cable inventory revealed conductor damage in four (of about 200) cables on the shelf. Shuttle managers decided to prove the integrity of the system tunnel cables already on Atlantis before launching. The launch has been rescheduled no earlier than Feb. 6 KSC01pp0135

KENNEDY SPACE CENTER, FLA. -- Space Shuttle <a href="../../subjects/atlantis.htm"> Atlantis</a> dwarfs the vehicles near it as it rolls back to the <a href="../../subjects/vab.htm"> Vehicle Assembly Building</a> from <a href="../../subjects/lc39a.htm"> Launch Pad 39A</a> atop the Mobile Launcher Platform and the crawler-transporter. In the VAB workers will conduct inspections, make continuity checks and conduct X-ray analysis on the 36 solid rocket booster cables located inside each booster’s external system tunnel. An extensive evaluation of NASA’s SRB cable inventory revealed conductor damage in four (of about 200) cables on the shelf. Shuttle managers decided to prove the integrity of the system tunnel cables already on Atlantis before launching. The launch has been rescheduled no earlier than Feb. 6 KSC01pp0141

KENNEDY SPACE CENTER, FLA. -- Dwarfing the vehicles on the road alongside the crawlerway, Space Shuttle <a href="../../subjects/atlantis.htm"> Atlantis</a> rolls back to the <a href="../../subjects/vab.htm"> Vehicle Assembly Building</a> from <a href="../../subjects/lc39a.htm"> Launch Pad 39A</a> via the crawler-transporter underneath the Mobile Launcher Platform. In the VAB workers will conduct inspections, make continuity checks and conduct X-ray analysis on the 36 solid rocket booster cables located inside each booster’s external system tunnel. An extensive evaluation of NASA’s SRB cable inventory revealed conductor damage in four (of about 200) cables on the shelf. Shuttle managers decided to prove the integrity of the system tunnel cables already on Atlantis before launching. The launch has been rescheduled no earlier than Feb. 6 KSC01pp0136

KENNEDY SPACE CENTER, FLA. -- Space Shuttle <a href="../../subjects/atlantis.htm"> Atlantis</a> (right) inches its way at 1 mph atop the crawler-transporter back to the <a href="../../subjects/vab.htm"> Vehicle Assembly Building</a> from <a href="../../subjects/lc39a.htm"> Launch Pad 39A</a> (upper left). A panorama view from the top of the VAB shows the proximity of the pad to the Atlantic Ocean (background) plus the 3.4-mile crawlerway leading from the pad to the VAB. The water areas on both sides of the crawlerway are part of the Banana River. In the VAB workers will conduct inspections, make continuity checks and conduct X-ray analysis on the 36 solid rocket booster cables located inside each booster’s external system tunnel. An extensive evaluation of NASA’s SRB cable inventory revealed conductor damage in four (of about 200) cables on the shelf. Shuttle managers decided to prove the integrity of the system tunnel cables already on Atlantis before launching. The launch has been rescheduled no earlier than Feb. 6 KSC01pp0140

KENNEDY SPACE CENTER, FLA. -- On its way back from <a href="http://www-pao.ksc.nasa.gov/kscpao/captions/subjects/lc39a.htm">Launch Pad 39A,</a> Space Shuttle <a href="http://www-pao.ksc.nasa.gov/kscpao/captions/subjects/atlantis.htm"> Atlantis</a>, towering above the vehicles on the adjacent road, makes the turn on the crawlerway leading to the <a href="http://www-pao.ksc.nasa.gov/kscpao/captions/subjects/vab.htm"> Vehicle Assembly Building. </a>In the VAB workers will conduct inspections, make continuity checks and conduct X-ray analysis on the 36 solid rocket booster cables located inside each booster’s external system tunnel. An extensive evaluation of NASA’s SRB cable inventory revealed conductor damage in four (of about 200) cables on the shelf. Shuttle managers decided to prove the integrity of the system tunnel cables already on Atlantis. The launch has been rescheduled no earlier than Feb. 6 KSC01pp0142

KENNEDY SPACE CENTER, FLA. -- Space Shuttle Atlantis (background, right) approaches the doors of the Vehicle Assembly Building (left) on its way back from Launch Pad 39A. Atlantis has rolled back to the VAB so that workers can conduct inspections, make continuity checks and conduct X-ray analysis on the 36 solid rocket booster cables located inside each booster’s system tunnel. An extensive evaluation of NASA’s SRB cable inventory revealed conductor damage in four (of about 200) cables on the shelf. Shuttle managers decided to prove the integrity of the system tunnel cables already on Atlantis before launching Jan. 19. The launch has been rescheduled no earlier than Feb. 6 KSC01padig026

KENNEDY SPACE CENTER, FLA. -- Space Shuttle Atlantis nears the Vehicle Assembly Building (left) and Launch Control Center on its way back from Launch Pad 39A. Atlantis is rolling back to the VAB so that workers can conduct inspections, make continuity checks and conduct X-ray analysis on the 36 solid rocket booster cables located inside each booster’s system tunnel. An extensive evaluation of NASA’s SRB cable inventory revealed conductor damage in four (of about 200) cables on the shelf. Shuttle managers decided to prove the integrity of the system tunnel cables already on Atlantis before launching Jan. 19. The launch has been rescheduled no earlier than Feb. 6 KSC01padig024

KENNEDY SPACE CENTER, FLA. -- Space Shuttle <a href="../../subjects/atlantis.htm"> Atlantis</a> nears the open doors of the <a href="../../subjects/vab.htm"> Vehicle Assembly Building</a> after rolling back from <a href="../../subjects/lc39a.htm"> Launch Pad 39A</a>. In the VAB workers will conduct inspections, make continuity checks and conduct X-ray analysis on the 36 solid rocket booster cables located inside each booster’s external system tunnel. An extensive evaluation of NASA’s SRB cable inventory revealed conductor damage in four (of about 200) cables on the shelf. Shuttle managers decided to prove the integrity of the system tunnel cables already on Atlantis before launching. The launch has been rescheduled no earlier than Feb. 6 KSC01pp0139

description

Summary

KENNEDY SPACE CENTER, FLA. -- Space Shuttle ../../subjects/atlantis.htm"> Atlantis</a> nears the open doors of the ../../subjects/vab.htm"> Vehicle Assembly Building</a> after rolling back from ../../subjects/lc39a.htm"> Launch Pad 39A</a>. In the VAB workers will conduct inspections, make continuity checks and conduct X-ray analysis on the 36 solid rocket booster cables located inside each booster’s external system tunnel. An extensive evaluation of NASA’s SRB cable inventory revealed conductor damage in four (of about 200) cables on the shelf. Shuttle managers decided to prove the integrity of the system tunnel cables already on Atlantis before launching. The launch has been rescheduled no earlier than Feb. 6

The Space Shuttle program was the United States government's manned launch vehicle program from 1981 to 2011, administered by NASA and officially beginning in 1972. The Space Shuttle system—composed of an orbiter launched with two reusable solid rocket boosters and a disposable external fuel tank— carried up to eight astronauts and up to 50,000 lb (23,000 kg) of payload into low Earth orbit (LEO). When its mission was complete, the orbiter would re-enter the Earth's atmosphere and lands as a glider. Although the concept had been explored since the late 1960s, the program formally commenced in 1972 and was the focus of NASA's manned operations after the final Apollo and Skylab flights in the mid-1970s. It started with the launch of the first shuttle Columbia on April 12, 1981, on STS-1. and finished with its last mission, STS-135 flown by Atlantis, in July 2011.

label_outline

Tags

kennedy space center subjects atlantis doors vab launch pad workers vab workers inspections conduct inspections continuity checks continuity checks x ray analysis conduct x ray analysis rocket booster cables rocket booster cables system tunnel system tunnel srb nasa srb cable inventory conductor damage conductor damage shuttle managers integrity system tunnel cables space shuttle vehicle assembly building spacecraft rocket launch nasa
date_range

Date

19/01/2001
collections

in collections

Space Shuttle Program

place

Location

create

Source

NASA
link

Link

https://images.nasa.gov/
copyright

Copyright info

Public Domain Dedication (CC0)

label_outline Explore Vab Workers, Conduct X Ray Analysis, Conduct Inspections

Trevor Lawrence, a quarterback from Cartersville High

At launch pad 36-A, Cape Canaveral Air Force Station, workers check over the second stage of an Atlas II/Centaur rocket before it is lifted up the gantry (behind it) for mating with the first stage. Atlas II is designed to launch payloads into low earth orbit, geosynchronous transfer orbit or geosynchronous orbit. The rocket is the launch vehicle for the GOES-L satellite, part of the NOAA National Weather Service system in weather imagery and atmospheric sounding information. The primary objective of the GOES-L is to provide a full capability satellite in an on-orbit storage condition, to assure NOAA continuity in services from a two-satellite constellation. Launch services are being provided by the 45th Space Wing KSC00pp0424

Soldiers assigned to 2nd Battalion, 17th Field Artillery

Drum Major Bryce Buckland from Robinson High School

Staff Sgt. Shawna Sims, a 92nd Air Refueling Squadron

US Marine Corps (USMC) personnel assigned to the 3rd Battalion, 12th Marine Regiment perform per-fire inspections on M198 155mm Towed Howitzers during a live-fire training exercise at Jijudai training range Kyushy, Japan

U.S. Air Force Airman 1st Class Nathaniel West, 18th

Workers prepare to move the shipping container with the Cassini orbiter inside the Payload Hazardous Servicing Facility (PHSF) for prelaunch processing, testing and integration. The /1997/66-97.htm">orbiter arrived</a> at KSC’s Shuttle Landing Facility in a U.S. Air Force C-17 air cargo plane from Edwards Air Force Base, California. The orbiter and the Huygens probe already being processed at KSC are the two primary components of the Cassini spacecraft, which will be launched on a Titan IVB/Centaur expendable launch vehicle from Cape Canaveral Air Station. Cassini will explore Saturn, its rings and moons for four years. The Huygens probe, designed and developed for the European Space Agency (ESA), will be deployed from the orbiter to study the clouds, atmosphere and surface of Saturn’s largest moon, Titan. The orbiter was designed and assembled at NASA’s Jet Propulsion Laboratory in California. Following postflight inspections, integration of the 12 science instruments not already installed on the orbiter will be completed. Then, the parabolic high-gain antenna and the propulsion module will be mated to the orbiter, followed by the Huygens probe, which will complete spacecraft integration. The Cassini mission is targeted for an Oct. 6 launch to begin its 6.7-year journey to the Saturnian system. Arrival at the planet is expected to occur around July 1, 2004 KSC-97pc682

An F-22 Raptor from the 1st Fighter Wing at Joint Base

The Fairchild air traffic control tower stands watch

Musician 2nd Class Anthony Smouse, assigned to the U.S. 7th Fleet Ceremonial Band, takes direction from the conductor during a rehearsal aboard the amphibious command ship USS Blue Ridge (LCC 19).

VANDENBERG AFB, Calif. – Technicians prepare to raise the first stage booster of a United Launch Alliance Atlas V onto the launch pad at Space Launch Complex-3E at Vandenberg Air Force Base, Calif. in preparation for the launch of the Landsat Data Continuity Mission. The Landsat Data Continuity Mission LDCM is the future of Landsat satellites. It will continue to obtain valuable data and imagery to be used in agriculture, education, business, science, and government. The Landsat Program provides repetitive acquisition of high resolution multispectral data of the Earth's surface on a global basis. The data from the Landsat spacecraft constitute the longest record of the Earth's continental surfaces as seen from space. It is a record unmatched in quality, detail, coverage, and value. Launch is planned for Feb. 2013. Photo credit: NASA/Roy Allison KSC-2012-5937

Topics

kennedy space center subjects atlantis doors vab launch pad workers vab workers inspections conduct inspections continuity checks continuity checks x ray analysis conduct x ray analysis rocket booster cables rocket booster cables system tunnel system tunnel srb nasa srb cable inventory conductor damage conductor damage shuttle managers integrity system tunnel cables space shuttle vehicle assembly building spacecraft rocket launch nasa