visibility Similar

KENNEDY SPACE CENTER, FLA. -- Space Shuttle Atlantis, mounted on a mobile launch platform, rolls to Launch Pad 39A atop a crawler transporter just after sunrise. First motion was at 5:02 a.m. EDT. In late February, Atlantis' external tank received hail damage during a severe thunderstorm that passed through the Kennedy Space Center Launch Complex 39 area. The hail caused visible divots in the giant tank's foam insulation, as well as minor surface damage to about 26 heat shield tiles on the shuttle's left wing. The launch of Space Shuttle Atlantis on mission STS-117 is now targeted for June 8. A flight readiness review will be held on May 30 and 31. Photo credit: NASA/Troy Cryder KSC-07pd1184

KENNEDY SPACE CENTER, FLA. -- Space Shuttle Atlantis, mounted on a mobile launch platform, rolls to Launch Pad 39A atop a crawler transporter at dawn. First motion was at 5:02 a.m. EDT. In late February, Atlantis' external tank received hail damage during a severe thunderstorm that passed through the Kennedy Space Center Launch Complex 39 area. The hail caused visible divots in the giant tank's foam insulation, as well as minor surface damage to about 26 heat shield tiles on the shuttle's left wing. The launch of Space Shuttle Atlantis on mission STS-117 is now targeted for June 8. A flight readiness review will be held on May 30 and 31. Photo credit: NASA/Troy Cryder KSC-07pd1181

CAPE CANAVERAL, Fla. – Sitting on top of the mobile launcher platform, space shuttle Discovery straddles the flame trench, which channels the flames and smoke exhaust of the shuttle's solid rocket boosters away from the space shuttle during liftoff, on Launch Pad 39A at NASA's Kennedy Space Center in Florida. Traveling from the Vehicle Assembly Building, the shuttle took nearly 12 hours on the journey as technicians stopped several times to clear mud from the crawler's treads and bearings caused by the waterlogged crawlerway. First motion out of the VAB was at 2:07 a.m. EDT Aug. 4. Rollout was delayed approximately 2 hours due to lightning in the area. Discovery was secured, or "hard down" to Launch Pad 39A at 1:50 p.m. EDT. "Hard down" means that the mobile launcher platform, or MLP, is sitting on the pedestals on the pad, and the crawler has been jacked down, thus transferring the weight of the MLP from the crawler to the pad pedestals. Discovery's 13-day flight will deliver a new crew member and 33,000 pounds of equipment to the International Space Station. The equipment includes science and storage racks, a freezer to store research samples, a new sleeping compartment and the COLBERT treadmill. Launch of Discovery on its STS-128 mission is targeted for late August. Photo credit: NASA/Troy Cryder KSC-2009-4425

KENNEDY SPACE CENTER, FLA. -- Atlantis, with its new external tank/solid rocket booster stack, rolls out to Pad 39A on August 20, 1996, in preparation for launch of STS-79 on the fourth Mir docking mission. Atlantis will return Astronaut Shannon Lucid to Earth after her record-breaking stay by an American on the Russian space station. Lucid has completed 21 weeks in space this week. Astronaut John Blaha will trade places with Lucid for a planned four-month stay aboard Mir. Atlantis will also carry the first SPACEHAB Double Module KSC-96PC996

KENNEDY SPACE CENTER, FLA. -- Space Shuttle Atlantis, secured atop a mobile launch platform, rounds a curve on the crawlerway in Launch Complex 39 on its way to Pad A. The crawler transporter has a top speed of one mile per hour while it is moving the space shuttle. First motion out of the Vehicle Assembly Building was at 4:43 a.m. EST. Rollout is a milestone for Atlantis' launch to the International Space Station on mission STS-122, targeted for Dec. 6. On this mission, Atlantis will deliver the Columbus module to the International Space Station. The European Space Agency's largest contribution to the station, Columbus is a multifunctional, pressurized laboratory that will be permanently attached to U.S. Node 2, called Harmony. The module is approximately 23 feet long and 15 feet wide, allowing it to hold 10 large racks of experiments. The laboratory will expand the research facilities aboard the station, providing crew members and scientists from around the world the ability to conduct a variety of experiments in the physical, materials and life sciences. Photo credit: NASA/Kim Shiflett KSC-07pd3264

KENNEDY SPACE CENTER, FLA. -- Getting ready for the STS-123 mission, space shuttle Endeavour begins rollout to Launch Pad 39A. The journey from the Vehicle Assembly Building began at 11:24 p.m. on Feb. 17, approximately 30 minutes before it's scheduled start time due to favorable weather conditions. The shuttle arrived at the launch pad at 4:45 a.m. Monday and was hard down at 6:22 a.m. On the mission, Endeavour and its crew will deliver the first section of the Japan Aerospace Exploration Agency's Kibo laboratory and the Canadian Space Agency's two-armed robotic system, Dextre. Launch is targeted for March 11. Photo credit: NASA/Amanda Diller KSC-08pd0343

KENNEDY SPACE CENTER, Fla. -- At Launch Pad 39A, the payload canister at left draws closer to the Rotating Service Structure where it will be lifted to the Payload Changeout Room. There its cargo, the Integrated Truss Structure Z1, will be removed and later transferred to Space Shuttle Discovery’s payload bay. Discovery is at right, sitting atop the Mobile Launcher Platform. The Z1 truss is the first of 10 that will become the backbone of the International Space Station, eventually stretching the length of a football field. Along with its companion payload, the third Pressurized Mating Adapter, the Z1 is scheduled to be launched aboard Discovery Oct. 5 at 9:38 p.m. EDT KSC00pp1351

CAPE CANAVERAL, Fla. – Space shuttle Endeavour, installed on the mobile launcher platform atop the crawler-transporter, moves past the Launch Control Center at NASA's Kennedy Space Center in Florida as it rolls out to Launch Pad 39B. First motion was at 11:57 p.m. EDT April 16. The 4.2-mile journey is expected to take approximately 7 hours. Endeavour will be prepared on the pad for liftoff in the unlikely event that a rescue mission is necessary following space shuttle Atlantis' launch on the STS-125 mission to service NASA's Hubble Space Telescope. After Atlantis is cleared to land, Endeavour will move to Launch Pad 39A for its upcoming STS-127 mission to the International Space Station, targeted to launch June 13. Photo credit: NASA/Jack Pfaller KSC-2009-2686

KENNEDY SPACE CENTER, FLA. -- Space Shuttle Atlantis, mounted on a mobile launch platform, finally rests next to the fixed service structure on the hard stand of Launch Pad 39A after an early morning rollout. Seen at the top of the service structure is the 80-foot-tall lightning mast. Atlantis rolled out to the pad for the second time before dawn. First motion out of the Vehicle Assembly Building was at 5:02 a.m. EDT. In late February, while Atlantis was on the launch pad, Atlantis' external tank received hail damage during a severe thunderstorm that passed through the Kennedy Space Center Launch Complex 39 area. The hail caused visible divots in the giant tank's foam insulation, as well as minor surface damage to about 26 heat shield tiles on the shuttle's left wing. The shuttle was returned to the VAB for repairs. The launch of Space Shuttle Atlantis on mission STS-117 is now targeted for June 8. A flight readiness review will be held on May 30 and 31. Photo credit: NASA/Ken Thornsley KSC-07pd1202

code Related

KENNEDY SPACE CENTER, FLA. -- Dwarfing the vehicles on the road alongside the crawlerway, Space Shuttle <a href="../../subjects/atlantis.htm"> Atlantis</a> rolls back to the <a href="../../subjects/vab.htm"> Vehicle Assembly Building</a> from <a href="../../subjects/lc39a.htm"> Launch Pad 39A</a> via the crawler-transporter underneath the Mobile Launcher Platform. In the VAB workers will conduct inspections, make continuity checks and conduct X-ray analysis on the 36 solid rocket booster cables located inside each booster’s external system tunnel. An extensive evaluation of NASA’s SRB cable inventory revealed conductor damage in four (of about 200) cables on the shelf. Shuttle managers decided to prove the integrity of the system tunnel cables already on Atlantis before launching. The launch has been rescheduled no earlier than Feb. 6 KSC01pp0136

KENNEDY SPACE CENTER, FLA. -- Space Shuttle <a href="../../subjects/atlantis.htm"> Atlantis</a> dwarfs the vehicles near it as it rolls back to the <a href="../../subjects/vab.htm"> Vehicle Assembly Building</a> from <a href="../../subjects/lc39a.htm"> Launch Pad 39A</a> atop the Mobile Launcher Platform and the crawler-transporter. In the VAB workers will conduct inspections, make continuity checks and conduct X-ray analysis on the 36 solid rocket booster cables located inside each booster’s external system tunnel. An extensive evaluation of NASA’s SRB cable inventory revealed conductor damage in four (of about 200) cables on the shelf. Shuttle managers decided to prove the integrity of the system tunnel cables already on Atlantis before launching. The launch has been rescheduled no earlier than Feb. 6 KSC01pp0141

KENNEDY SPACE CENTER, FLA. -- Space Shuttle <a href="../../subjects/atlantis.htm"> Atlantis</a> nears the open doors of the <a href="../../subjects/vab.htm"> Vehicle Assembly Building</a> after rolling back from <a href="../../subjects/lc39a.htm"> Launch Pad 39A</a>. In the VAB workers will conduct inspections, make continuity checks and conduct X-ray analysis on the 36 solid rocket booster cables located inside each booster’s external system tunnel. An extensive evaluation of NASA’s SRB cable inventory revealed conductor damage in four (of about 200) cables on the shelf. Shuttle managers decided to prove the integrity of the system tunnel cables already on Atlantis before launching. The launch has been rescheduled no earlier than Feb. 6 KSC01pp0139

KENNEDY SPACE CENTER, FLA. -- Space Shuttle <a href="../../subjects/atlantis.htm"> Atlantis</a> moves past palm trees on its way back to the <a href="../../subjects/vab.htm"> Vehicle Assembly Building</a> from <a href="../../subjects/lc39a.htm"> Launch Pad 39A</a>. Atlantis is rolling back to the VAB from Launch Pad 39A. In the VAB workers will conduct inspections, make continuity checks and conduct X-ray analysis on the 36 solid rocket booster cables located inside each booster’s external system tunnel. An extensive evaluation of NASA’s SRB cable inventory revealed conductor damage in four (of about 200) cables on the shelf. Shuttle managers decided to prove the integrity of the system tunnel cables already on Atlantis before launching. The launch has been rescheduled no earlier than Feb. 6 KSC01pp0137

KENNEDY SPACE CENTER, FLA. -- Space Shuttle <a href="../../subjects/atlantis.htm"> Atlantis</a> (right) inches its way at 1 mph atop the crawler-transporter back to the <a href="../../subjects/vab.htm"> Vehicle Assembly Building</a> from <a href="../../subjects/lc39a.htm"> Launch Pad 39A</a> (upper left). A panorama view from the top of the VAB shows the proximity of the pad to the Atlantic Ocean (background) plus the 3.4-mile crawlerway leading from the pad to the VAB. The water areas on both sides of the crawlerway are part of the Banana River. In the VAB workers will conduct inspections, make continuity checks and conduct X-ray analysis on the 36 solid rocket booster cables located inside each booster’s external system tunnel. An extensive evaluation of NASA’s SRB cable inventory revealed conductor damage in four (of about 200) cables on the shelf. Shuttle managers decided to prove the integrity of the system tunnel cables already on Atlantis before launching. The launch has been rescheduled no earlier than Feb. 6 KSC01pp0140

KENNEDY SPACE CENTER, FLA. -- From across the turn basin can be seen Space Shuttle <a href="../../subjects/atlantis.htm"> Atlantis</a> approaching the <a href="../../subjects/vab.htm"> Vehicle Assembly Building</a> (at left). Atlantis is rolling back to the VAB from <a href="../../subjects/lc39a.htm"> Launch Pad 39A</a>. In the VAB workers will conduct inspections, make continuity checks and conduct X-ray analysis on the 36 solid rocket booster cables located inside each booster’s external system tunnel. An extensive evaluation of NASA’s SRB cable inventory revealed conductor damage in four (of about 200) cables on the shelf. Shuttle managers decided to prove the integrity of the system tunnel cables already on Atlantis before launching. The launch has been rescheduled no earlier than Feb. 6 KSC01pp0138

KENNEDY SPACE CENTER, FLA. -- On its way back from <a href="http://www-pao.ksc.nasa.gov/kscpao/captions/subjects/lc39a.htm">Launch Pad 39A,</a> Space Shuttle <a href="http://www-pao.ksc.nasa.gov/kscpao/captions/subjects/atlantis.htm"> Atlantis</a>, towering above the vehicles on the adjacent road, makes the turn on the crawlerway leading to the <a href="http://www-pao.ksc.nasa.gov/kscpao/captions/subjects/vab.htm"> Vehicle Assembly Building. </a>In the VAB workers will conduct inspections, make continuity checks and conduct X-ray analysis on the 36 solid rocket booster cables located inside each booster’s external system tunnel. An extensive evaluation of NASA’s SRB cable inventory revealed conductor damage in four (of about 200) cables on the shelf. Shuttle managers decided to prove the integrity of the system tunnel cables already on Atlantis. The launch has been rescheduled no earlier than Feb. 6 KSC01pp0142

KENNEDY SPACE CENTER, FLA. -- Space Shuttle Atlantis (background, right) approaches the doors of the Vehicle Assembly Building (left) on its way back from Launch Pad 39A. Atlantis has rolled back to the VAB so that workers can conduct inspections, make continuity checks and conduct X-ray analysis on the 36 solid rocket booster cables located inside each booster’s system tunnel. An extensive evaluation of NASA’s SRB cable inventory revealed conductor damage in four (of about 200) cables on the shelf. Shuttle managers decided to prove the integrity of the system tunnel cables already on Atlantis before launching Jan. 19. The launch has been rescheduled no earlier than Feb. 6 KSC01padig026

KENNEDY SPACE CENTER, FLA. -- A crawler transporter moves Space Shuttle Atlantis, secured atop a mobile launch platform, along the crawlerway from the Vehicle Assembly Building to Launch Pad 39A as the sun rises. First motion out of the VAB was at 4:43 a.m. EST. The crawler transporter, mobile launch platform and unfueled space shuttle weigh a total of approximately 17.5 million pounds. Rollout is a milestone for Atlantis' launch to the International Space Station on mission STS-122, targeted for Dec. 6. On this mission, Atlantis will deliver the Columbus module to the International Space Station. The European Space Agency's largest contribution to the station, Columbus is a multifunctional, pressurized laboratory that will be permanently attached to U.S. Node 2, called Harmony. The module is approximately 23 feet long and 15 feet wide, allowing it to hold 10 large racks of experiments. The laboratory will expand the research facilities aboard the station, providing crew members and scientists from around the world the ability to conduct a variety of experiments in the physical, materials and life sciences. Photo credit: NASA/Kim Shiflett KSC-07pd3260

KENNEDY SPACE CENTER, FLA. -- Dwarfing the vehicles on the road alongside the crawlerway, Space Shuttle <a href="../../subjects/atlantis.htm"> Atlantis</a> rolls back to the <a href="../../subjects/vab.htm"> Vehicle Assembly Building</a> from <a href="../../subjects/lc39a.htm"> Launch Pad 39A</a> via the crawler-transporter underneath the Mobile Launcher Platform. In the VAB workers will conduct inspections, make continuity checks and conduct X-ray analysis on the 36 solid rocket booster cables located inside each booster’s external system tunnel. An extensive evaluation of NASA’s SRB cable inventory revealed conductor damage in four (of about 200) cables on the shelf. Shuttle managers decided to prove the integrity of the system tunnel cables already on Atlantis before launching. The launch has been rescheduled no earlier than Feb. 6 KSC01pp0135

description

Summary

KENNEDY SPACE CENTER, FLA. -- Dwarfing the vehicles on the road alongside the crawlerway, Space Shuttle ../../subjects/atlantis.htm"> Atlantis</a> rolls back to the ../../subjects/vab.htm"> Vehicle Assembly Building</a> from ../../subjects/lc39a.htm"> Launch Pad 39A</a> via the crawler-transporter underneath the Mobile Launcher Platform. In the VAB workers will conduct inspections, make continuity checks and conduct X-ray analysis on the 36 solid rocket booster cables located inside each booster’s external system tunnel. An extensive evaluation of NASA’s SRB cable inventory revealed conductor damage in four (of about 200) cables on the shelf. Shuttle managers decided to prove the integrity of the system tunnel cables already on Atlantis before launching. The launch has been rescheduled no earlier than Feb. 6

The Space Shuttle program was the United States government's manned launch vehicle program from 1981 to 2011, administered by NASA and officially beginning in 1972. The Space Shuttle system—composed of an orbiter launched with two reusable solid rocket boosters and a disposable external fuel tank— carried up to eight astronauts and up to 50,000 lb (23,000 kg) of payload into low Earth orbit (LEO). When its mission was complete, the orbiter would re-enter the Earth's atmosphere and lands as a glider. Although the concept had been explored since the late 1960s, the program formally commenced in 1972 and was the focus of NASA's manned operations after the final Apollo and Skylab flights in the mid-1970s. It started with the launch of the first shuttle Columbia on April 12, 1981, on STS-1. and finished with its last mission, STS-135 flown by Atlantis, in July 2011.

label_outline

Tags

kennedy space center vehicles road crawlerway subjects atlantis rolls vab launch pad crawler transporter mobile launcher platform mobile launcher platform workers vab workers inspections conduct inspections continuity checks continuity checks x ray analysis conduct x ray analysis rocket booster cables rocket booster cables system tunnel system tunnel srb nasa srb cable inventory conductor damage conductor damage shuttle managers integrity system tunnel cables space shuttle vehicle assembly building space shuttle on launch pad nasa
date_range

Date

19/01/2001
collections

in collections

Space Shuttle Program

place

Location

create

Source

NASA
link

Link

https://images.nasa.gov/
copyright

Copyright info

Public Domain Dedication (CC0)

label_outline Explore Vab Workers, Conduct X Ray Analysis, Conduct Inspections

Trevor Lawrence, a quarterback from Cartersville High

At launch pad 36-A, Cape Canaveral Air Force Station, workers check over the second stage of an Atlas II/Centaur rocket before it is lifted up the gantry (behind it) for mating with the first stage. Atlas II is designed to launch payloads into low earth orbit, geosynchronous transfer orbit or geosynchronous orbit. The rocket is the launch vehicle for the GOES-L satellite, part of the NOAA National Weather Service system in weather imagery and atmospheric sounding information. The primary objective of the GOES-L is to provide a full capability satellite in an on-orbit storage condition, to assure NOAA continuity in services from a two-satellite constellation. Launch services are being provided by the 45th Space Wing KSC00pp0424

Soldiers assigned to 2nd Battalion, 17th Field Artillery

Drum Major Bryce Buckland from Robinson High School

KENNEDY SPACE CENTER, Fla. -- Space Shuttle Atlantis, atop the Mobile Launcher Platform and Crawler-Transporter, arrives at Launch Pad 39B for preparations before launch. It started its 8-hour rollout from the Vehicle Assembly Building high bay 2 (Safe Haven) at 11:20 p.m., Aug. 13. This photo was taken about 7:15 a.m. At left is the Rotating Service Structure in its open position. Towering above the RSS (and attached to the Fixed Service Structure) is the 80-foot tall lightning mast. Atlantis is scheduled for launch Sept. 8 at 8:31 a.m. EDT on mission STS-106 KSC00pp1120

Staff Sgt. Shawna Sims, a 92nd Air Refueling Squadron

KENNEDY SPACE CENTER, FLA. -- Space Shuttle Atlantis passes the turn basin as it slowly wends its way toward Launch Pad 39A. First motion out of the Vehicle Assembly Building was at 8:19 a.m. The 3.4-mile trip to the pad along the crawlerway will take about 6 hours. The mission payload aboard Space Shuttle Atlantis is the S3/S4 integrated truss structure, along with a third set of solar arrays and batteries. The crew of six astronauts will install the truss to continue assembly of the International Space Station. Launch is targeted for March 15. Photo credit: NASA/Ken Thornsley KSC-07pd0390

U.S. Air Force Airman 1st Class Nathaniel West, 18th

An F-22 Raptor from the 1st Fighter Wing at Joint Base

The Fairchild air traffic control tower stands watch

Musician 2nd Class Anthony Smouse, assigned to the U.S. 7th Fleet Ceremonial Band, takes direction from the conductor during a rehearsal aboard the amphibious command ship USS Blue Ridge (LCC 19).

KENNEDY SPACE CENTER, FLA. -- The morning light streams through the open door of the Vehicle Assembly Building as Space Shuttle Atlantis begins rolling out to Launch Pad 39A. First motion was at 8:19 a.m. The 3.4-mile trip along the crawlerway will take about 6 hours. The mission payload aboard Space Shuttle Atlantis is the S3/S4 integrated truss structure, along with a third set of solar arrays and batteries. The crew of six astronauts will install the truss to continue assembly of the International Space Station. Launch is targeted for March 15. Photo credit: NASA/Kim Shiflett KSC-07pd0379

Topics

kennedy space center vehicles road crawlerway subjects atlantis rolls vab launch pad crawler transporter mobile launcher platform mobile launcher platform workers vab workers inspections conduct inspections continuity checks continuity checks x ray analysis conduct x ray analysis rocket booster cables rocket booster cables system tunnel system tunnel srb nasa srb cable inventory conductor damage conductor damage shuttle managers integrity system tunnel cables space shuttle vehicle assembly building space shuttle on launch pad nasa