visibility Similar

STS-133 DISCOVERY ON PAD 39A & SURROUNDING WILDLIFE - WEATHER SCRUB 2010-5500

KENNEDY SPACE CENTER, FLA. -- In the foreground, white herons at the canal's edge pay scant attention the immense Space Shuttle towering above them. The Shuttle is inching its way to the top of the launch pad. In the background are seen the Rotating Service Structure (open) and the Fixed Service Structure, which holds the 80-foot lightning mast on top. The Shuttle sits on top of the Mobile Launcher Platform, which rests on the crawler-transporter. Atlantis is scheduled for launch April 4 on mission STS-110, which will install the S0 truss, the framework that eventually will hold the power and cooling systems needed for future international research laboratories on the International Space Station. The Canadarm2 robotic arm will be used exclusively to hoist the 13-ton truss from the payload bay to the Station. The S0 truss will be the first major U.S. component launched to the Station since the addition of the Quest airlock in July 2001. The four spacewalks planned for the construction will all originate from the airlock. The mission will be Atlantis' 25th trip to space KSC-02pd0278

CAPE CANAVERAL, Fla. -- At Launch Pad 39A at NASA's Kennedy Space Center in Florida, the rotating service structure (RSS) is moved away from space shuttle Endeavour in preparation for the shuttle's upcoming launch. Retraction of the structure, which provides weather protection and access to the shuttle, began at 11:44 a.m. EDT and was completed at 12:24 p.m. RSS "rollback" is a significant milestone in Endeavour's STS-134 mission countdown. Liftoff is scheduled for May 16 at 8:56 a.m. EDT. Endeavour and its crew will deliver the Express Logistics Carrier-3, Alpha Magnetic Spectrometer-2 (AMS), a high-pressure gas tank and additional spare parts for the Dextre robotic helper to the station. This will be the final spaceflight for Endeavour. For more information visit, www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts134/index.html. Photo credit: NASA/Frankie Martin KSC-2011-3517

KENNEDY SPACE CENTER, FLA. - With the Rotating Service Structure in place on Launch Pad 39B, all that is visible on Space Shuttle Atlantis is the orange external tank flanked by white solid rocket boosters. The Shuttle is undergoing pre-launch preparations for mission STS-112, scheduled to launch Oct. 2, 2002. The sky above the Shuttle is filled with dark clouds sweeping over Florida from Hurricane Isidore. KSC-02pd1372

KENNEDY SPACE CENTER, FLA. -- Under blue sky streaked with contrails, Space Shuttle Atlantis, atop the mobile launcher platform, is being rolled back to the Vehicle Assembly Building (at left in the background) from Launch Pad 39A. In the VAB, the shuttle will be examined for hail damage. A severe thunderstorm with golf ball-sized hail caused divots in the giant tank's foam insulation and minor surface damage to about 26 heat shield tiles on the shuttle's left wing. Further evaluation of the tank is necessary to get an accurate accounting of foam damage and determine the type of repair required and the time needed for that work. A new target launch date has not been determined, but teams will focus on preparing Atlantis for liftoff in late April. Photo credit: NASA/Amanda Diller KSC-07pd0560

KENNEDY SPACE CENTER, FLA. -- Space Shuttle Atlantis, secured atop a mobile launch platform, ascends the five percent grade to the top of the hardstand on Launch Pad 39A. The rotating service structure, adjoined to the fixed service structure at right, has been rolled back in preparation for the shuttle's arrival. First motion out of the Vehicle Assembly Building was at 4:43 a.m. EST, and the shuttle was hard down on the pad at 11:51 a.m. Rollout is a milestone for Atlantis' launch to the International Space Station on mission STS-122, targeted for Dec. 6. On this mission, Atlantis will deliver the Columbus module to the International Space Station. The European Space Agency's largest contribution to the station, Columbus is a multifunctional, pressurized laboratory that will be permanently attached to U.S. Node 2, called Harmony. The module is approximately 23 feet long and 15 feet wide, allowing it to hold 10 large racks of experiments. The laboratory will expand the research facilities aboard the station, providing crew members and scientists from around the world the ability to conduct a variety of experiments in the physical, materials and life sciences. Photo credit: NASA/Kim Shiflett KSC-07pd3272

KENNEDY SPACE CENTER, FLA. -- Space Shuttle Columbia sits on Launch Pad 39B in preparation for the launch of STS-93. This view shows the flame trench, 490 feet long and 40 feet high, which helps contain the intense heat that occurs at launch. Columbia was rolled out June 7, less than two weeks after the liftoff of Discovery on mission STS-96. The STS-93 payload is the Chandra X-ray Observatory, the world's most powerful X-ray telescope, which will allow scientists from around the world to see previously invisible black holes and high-temperature gas clouds, giving the observatory the potential to rewrite the books on the structure and evolution of our universe. Columbia (OV-102) is the first of NASA's orbiter fleet, delivered to Kennedy Space Center in March 1979. Columbia initiated the Space Shuttle flight program at KSC when it lifted off Launch Pad 39A on April 12, 1981 KSC-99pp0637

KENNEDY SPACE CENTER, FLA. -- On Launch Pad 39A on NASA's Kennedy Space Center, space shuttle Discovery is fully revealed after rollback of the rotating service structure, at far left. Next to it is the fixed service structure, or FSS, with the 80-foot-tall lightning mast on top. Extending from the FSS to the golden external tank is the vent hood (known as the "beanie cap") at the end of the gaseous oxygen vent arm. Vapors are created as the liquid oxygen in the external tank boil off. The hood vents the gaseous oxygen vapors away from the space shuttle vehicle. Below it, also extending toward Discovery from the structure, is the orbiter access arm with the White Room at the end. The crew gains access into the orbiter through the White Room. Rollback of the RSS started at 3:34 p.m. EDT and was complete at 4:20 p.m. The RSS provides protected access to the orbiter for changeout and servicing of payloads at the pad. Rollback of the pad's RSS is one of the milestones in preparation for the launch of mission STS-120. Discovery is scheduled for liftoff at 11:38 a.m. EDT on Oct. 23. The mission will be the 23rd assembly flight to the International Space Station and the 34th flight for Discovery. Payload on the mission is the Italian-built U.S. Node 2, called Harmony. The 14-day mission will install Harmony and move the P6 solar arrays to their permanent position and deploy them. Discovery is expected to complete its mission and return home at 4:47 a.m. EST on Nov. 6. Photo credit: NASA/Kim Shiflett KSC-07pd2923

KENNEDY SPACE CENTER, FLA. -- Space Shuttle Atlantis, secured atop a mobile launch platform, passes by the crawler kraal in Launch Complex 39 on its way to Pad A. This area is used to perform maintenance on the crawler transporter. First motion out of the Vehicle Assembly Building was at 4:43 a.m. EST. Rollout is a milestone for Atlantis' launch to the International Space Station on mission STS-122, targeted for Dec. 6. On this mission, Atlantis will deliver the Columbus module to the International Space Station. The European Space Agency's largest contribution to the station, Columbus is a multifunctional, pressurized laboratory that will be permanently attached to U.S. Node 2, called Harmony. The module is approximately 23 feet long and 15 feet wide, allowing it to hold 10 large racks of experiments. The laboratory will expand the research facilities aboard the station, providing crew members and scientists from around the world the ability to conduct a variety of experiments in the physical, materials and life sciences. Photo credit: NASA/Kim Shiflett KSC-07pd3263

code Related

KENNEDY SPACE CENTER, FLA. -- Space Shuttle Atlantis (background, right) approaches the doors of the Vehicle Assembly Building (left) on its way back from Launch Pad 39A. Atlantis has rolled back to the VAB so that workers can conduct inspections, make continuity checks and conduct X-ray analysis on the 36 solid rocket booster cables located inside each booster’s system tunnel. An extensive evaluation of NASA’s SRB cable inventory revealed conductor damage in four (of about 200) cables on the shelf. Shuttle managers decided to prove the integrity of the system tunnel cables already on Atlantis before launching Jan. 19. The launch has been rescheduled no earlier than Feb. 6 KSC01padig026

KENNEDY SPACE CENTER, FLA. -- Space Shuttle Atlantis nears the Vehicle Assembly Building (left) and Launch Control Center on its way back from Launch Pad 39A. Atlantis is rolling back to the VAB so that workers can conduct inspections, make continuity checks and conduct X-ray analysis on the 36 solid rocket booster cables located inside each booster’s system tunnel. An extensive evaluation of NASA’s SRB cable inventory revealed conductor damage in four (of about 200) cables on the shelf. Shuttle managers decided to prove the integrity of the system tunnel cables already on Atlantis before launching Jan. 19. The launch has been rescheduled no earlier than Feb. 6 KSC01padig024

KENNEDY SPACE CENTER, FLA. -- Just before dawn, Space Shuttle Atlantis is spotlighted before it begins rolling back to the Vehicle Assembly Building from Launch Pad 39A. Atlantis is returning to the VAB so that workers can conduct inspections, make continuity checks and conduct X-ray analysis on the 36 solid rocket booster cables located inside each booster’s system tunnel. An extensive evaluation of NASA’s SRB cable inventory revealed conductor damage in four (of about 200) cables on the shelf. Shuttle managers decided to prove the integrity of the system tunnel cables already on Atlantis before launching Jan. 19. The launch has been rescheduled no earlier than Feb. 6 KSC01pp0132

KENNEDY SPACE CENTER, FLA. -- Space Shuttle Atlantis begins rolling back to the Vehicle Assembly Building on the crawler-transporter. In the VAB workers will conduct inspections, make continuity checks and conduct X-ray analysis on the 36 solid rocket booster cables located inside each booster’s system tunnel. An extensive evaluation of NASA’s SRB cable inventory revealed conductor damage in four (of about 200) cables on the shelf. Shuttle managers decided to prove the integrity of the system tunnel cables already on Atlantis before launching Jan. 19. The launch has been rescheduled no earlier than Feb. 6 KSC01pp0134

KENNEDY SPACE CENTER, FLA. -- Space Shuttle Atlantis begins moving back to the Vehicle Assembly Building where workers will conduct inspections, make continuity checks and conduct X-ray analysis on the 36 solid rocket booster cables located inside each booster’s system tunnel. An extensive evaluation of NASA’s SRB cable inventory revealed conductor damage in four (of about 200) cables on the shelf. Shuttle managers decided to prove the integrity of the system tunnel cables already on Atlantis before launching Jan. 19. The launch has been rescheduled no earlier than Feb. 6 KSC01padig015

KENNEDY SPACE CENTER, FLA. -- Viewed from the 235-foot level of the Fixed Service Structure on Launch Pad 39A, Space Shuttle Atlantis is seen looming above the pad. Traveling about 1 mph on the crawler-transporter, Atlantis is making the 3.4-mile trek back to the Vehicle Assembly Building so that workers can conduct inspections, make continuity checks and conduct X-ray analysis on the 36 solid rocket booster cables located inside each booster’s system tunnel (seen at left on the outside of the SRB). An extensive evaluation of NASA’s SRB cable inventory revealed conductor damage in four (of about 200) cables on the shelf. Shuttle managers decided to prove the integrity of the system tunnel cables already on Atlantis before launching Jan. 19. The launch has been rescheduled no earlier than Feb. 6 KSC01padig019

KENNEDY SPACE CENTER, FLA. -- As Space Shuttle Atlantis begins its crawl back to the Vehicle Assembly Building, work continues on the Fixed Service Structure at Launch Pad 39A. Atlantis’ return to the VAB was determined by Shuttle managers so that inspections, continuity checks and X-ray analysis can be conducted on the 36 solid rocket booster cables located inside each booster’s system tunnel. An extensive evaluation of NASA’s SRB cable inventory revealed conductor damage in four (of about 200) cables on the shelf. The launch has been rescheduled no earlier than Feb. 6 KSC01padig020

KENNEDY SPACE CENTER, FLA. -- Space Shuttle Atlantis is ready to roll back to the Vehicle Assembly Building via the crawler-transporter. In the VAB workers will conduct inspections, make continuity checks and conduct X-ray analysis on the 36 solid rocket booster cables located inside each booster’s system tunnel. An extensive evaluation of NASA’s SRB cable inventory revealed conductor damage in four (of about 200) cables on the shelf. Shuttle managers decided to prove the integrity of the system tunnel cables already on Atlantis before launching Jan. 19. The launch has been rescheduled no earlier than Feb. 6 KSC01pp0133

KENNEDY SPACE CENTER, FLA. -- Space Shuttle Atlantis is framed by palms and winter-stripped branches as it wends its way from Launch Pad 39A back to the Vehicle Assembly Building. Atlantis is rolling back to the VAB so that workers can conduct inspections, make continuity checks and conduct X-ray analysis on the 36 solid rocket booster cables located inside each booster’s system tunnel. An extensive evaluation of NASA’s SRB cable inventory revealed conductor damage in four (of about 200) cables on the shelf. Shuttle managers decided to prove the integrity of the system tunnel cables already on Atlantis before launching Jan. 19. The launch has been rescheduled no earlier than Feb. 6 KSC01padig023

KENNEDY SPACE CENTER, FLA. -- Traveling about 1 mph on the crawler-transporter, Space Shuttle Atlantis begins the 3.4-mile trek back to the Vehicle Assembly Building. In the VAB workers will conduct inspections, make continuity checks and conduct X-ray analysis on the 36 solid rocket booster cables located inside each booster’s system tunnel. An extensive evaluation of NASA’s SRB cable inventory revealed conductor damage in four (of about 200) cables on the shelf. Shuttle managers decided to prove the integrity of the system tunnel cables already on Atlantis before launching Jan. 19. The launch has been rescheduled no earlier than Feb. 6 KSC01padig016

description

Summary

KENNEDY SPACE CENTER, FLA. -- Traveling about 1 mph on the crawler-transporter, Space Shuttle Atlantis begins the 3.4-mile trek back to the Vehicle Assembly Building. In the VAB workers will conduct inspections, make continuity checks and conduct X-ray analysis on the 36 solid rocket booster cables located inside each booster’s system tunnel. An extensive evaluation of NASA’s SRB cable inventory revealed conductor damage in four (of about 200) cables on the shelf. Shuttle managers decided to prove the integrity of the system tunnel cables already on Atlantis before launching Jan. 19. The launch has been rescheduled no earlier than Feb. 6

The Space Shuttle program was the United States government's manned launch vehicle program from 1981 to 2011, administered by NASA and officially beginning in 1972. The Space Shuttle system—composed of an orbiter launched with two reusable solid rocket boosters and a disposable external fuel tank— carried up to eight astronauts and up to 50,000 lb (23,000 kg) of payload into low Earth orbit (LEO). When its mission was complete, the orbiter would re-enter the Earth's atmosphere and lands as a glider. Although the concept had been explored since the late 1960s, the program formally commenced in 1972 and was the focus of NASA's manned operations after the final Apollo and Skylab flights in the mid-1970s. It started with the launch of the first shuttle Columbia on April 12, 1981, on STS-1. and finished with its last mission, STS-135 flown by Atlantis, in July 2011.

Space Shuttle Atlantis was a space shuttle that was operated by NASA as part of the Space Shuttle program. It was the fourth operational shuttle built, and the last one to be built before the program was retired in 2011. Atlantis was named after the first research vessel operated by the Woods Hole Oceanographic Institution, and it made its first flight in October 1985. Over the course of its career, Atlantis completed 33 missions and spent a total of 307 days in space. Its last mission was STS-135, which was the final mission of the Space Shuttle program. Atlantis is now on display at the Kennedy Space Center Visitor Complex in Florida. Space Shuttle Atlantis (Orbiter Vehicle Designation: OV-104) was one of the four first operational orbiters in the Space Shuttle fleet of NASA, the space agency of the United States. (The other two are Discovery and Endeavour.) Atlantis was the fourth operational shuttle built. Atlantis is named after a two-masted sailing ship that operated from 1930 to 1966 for the Woods Hole Oceanographic Institute. Atlantis performed well in 25 years of service, flying 33 missions.

label_outline

Tags

kennedy space center mph crawler transporter atlantis space shuttle atlantis trek vab workers vab workers inspections conduct inspections continuity checks continuity checks x ray analysis conduct x ray analysis rocket booster cables rocket booster cables system tunnel booster system tunnel srb nasa srb cable inventory conductor damage conductor damage shuttle managers integrity system tunnel cables launch padig space shuttle vehicle assembly building launch pad spacecraft rocket launch nasa
date_range

Date

19/01/2001
collections

in collections

Space Shuttle Program

Space Shuttle Atlantis

The Fourth Pperational Shuttle Built
place

Location

create

Source

NASA
link

Link

https://images.nasa.gov/
copyright

Copyright info

Public Domain Dedication (CC0)

label_outline Explore Vab Workers, Conduct X Ray Analysis, Booster System Tunnel

CAPE CANAVERAL, Fla. – The first stage ignited on NASA’s Ares I-X test rocket at Launch Pad 39B at NASA's Kennedy Space Center in Florida at 11:30 a.m. EDT on Oct. 28. The rocket produces 2.96 million pounds of thrust at liftoff and reaches a speed of 100 mph in eight seconds. This was the first launch from Kennedy's pads of a vehicle other than the space shuttle since the Apollo Program's Saturn rockets were retired. The parts used to make the Ares I-X booster flew on 30 different shuttle missions ranging from STS-29 in 1989 to STS-106 in 2000. The data returned from more than 700 sensors throughout the rocket will be used to refine the design of future launch vehicles and bring NASA one step closer to reaching its exploration goals. For information on the Ares I-X vehicle and flight test, visit http://www.nasa.gov/aresIX. Photo credit: NASA/Sandra Joseph and Kevin O'Connell KSC-2009-5987

Trevor Lawrence, a quarterback from Cartersville High

At launch pad 36-A, Cape Canaveral Air Force Station, workers check over the second stage of an Atlas II/Centaur rocket before it is lifted up the gantry (behind it) for mating with the first stage. Atlas II is designed to launch payloads into low earth orbit, geosynchronous transfer orbit or geosynchronous orbit. The rocket is the launch vehicle for the GOES-L satellite, part of the NOAA National Weather Service system in weather imagery and atmospheric sounding information. The primary objective of the GOES-L is to provide a full capability satellite in an on-orbit storage condition, to assure NOAA continuity in services from a two-satellite constellation. Launch services are being provided by the 45th Space Wing KSC00pp0424

Soldiers assigned to 2nd Battalion, 17th Field Artillery

Drum Major Bryce Buckland from Robinson High School

Staff Sgt. Shawna Sims, a 92nd Air Refueling Squadron

KENNEDY SPACE CENTER, Fla. -- Space Shuttle Discovery begins rolling into the fog that shrouds Kennedy Space Center. Discovery is on its way from the Vehicle Assembly Building to Launch Pad 39B and mission STS-102 to the International Space Station. Its payload is the Multi-Purpose Logistics Module Leonardo, a “moving van,” to carry laboratory racks filled with equipment, experiments and supplies to and from the Space Station aboard the Space Shuttle. The flight will also carry the Expedition Two crew up to the Space Station, replacing Expedition One, who will return to Earth on Discovery. Launch is scheduled for March 8 at 6:45 a.m. EST KSC01padig067

Oklahoma City, Okla., May 31, 2013 -- Severe storms approach Oklahoma City. The severe weather that impacted the area had numerous tornadoes and the National Weather Service was and EF5 that packed winds reaching 295 mph. The weather service also said the twister's 2.6 mile width is the widest ever recorded. Jocelyn Augustino/FEMA

U.S. Air Force Airman 1st Class Nathaniel West, 18th

An F-22 Raptor from the 1st Fighter Wing at Joint Base

The Fairchild air traffic control tower stands watch

KENNEDY SPACE CENTER, FLA. -- On Pad 17-A at Cape Canaveral Air Force Station, the solid rocket booster is raised off its transporter. The SRB will be lifted into the mobile service tower for mating with the Delta II first stage. The Delta is the launch vehicle for the Phoenix Mars Lander spacecraft. Phoenix will land in icy soils near the north polar permanent ice cap of Mars and explore the history of the water in these soils and any associated rocks, while monitoring polar climate. Landing on Mars is planned in May 2008 on arctic ground where a mission currently in orbit, Mars Odyssey, has detected high concentrations of ice just beneath the top layer of soil. Phoenix is scheduled to launch Aug. 3. Photo credit: NASA/Kim Shiflett KSC-07pd1560

Topics

kennedy space center mph crawler transporter atlantis space shuttle atlantis trek vab workers vab workers inspections conduct inspections continuity checks continuity checks x ray analysis conduct x ray analysis rocket booster cables rocket booster cables system tunnel booster system tunnel srb nasa srb cable inventory conductor damage conductor damage shuttle managers integrity system tunnel cables launch padig space shuttle vehicle assembly building launch pad spacecraft rocket launch nasa