visibility Similar

code Related

KENNEDY SPACE CENTER, FLA. -- In the Vehicle Assembly Building at NASA's Kennedy Space Center, the external tank is lowered between the solid rocket boosters on the mobile launcher platform below. After mating, the boosters-tank configuration will be used on space shuttle Atlantis for mission STS-122, which is targeted for launch on Dec. 6. Photo credit: Kim Shiflett KSC-07pd2879

KENNEDY SPACE CENTER, FLA. --In the Vehicle Assembly Building at NASA's Kennedy Space Center, the external tank is lowered toward the solid rocket boosters on the mobile launcher platform below. After mating, the boosters-tank configuration will be used on space shuttle Atlantis for mission STS-122, which is targeted for launch on Dec. 6. Photo credit: Kim Shiflett KSC-07pd2876

KENNEDY SPACE CENTER, FLA. -- In the Vehicle Assembly Building at NASA's Kennedy Space Center, the external tank is lowered between the solid rocket boosters on the mobile launcher platform below. After mating, the boosters-tank configuration will be used on space shuttle Atlantis for mission STS-122, which is targeted for launch on Dec. 6. Photo credit: Kim Shiflett KSC-07pd2877

KENNEDY SPACE CENTER, FLA. -- In the Vehicle Assembly Building at NASA's Kennedy Space Center, the external tank is lowered between the solid rocket boosters on the mobile launcher platform below. After mating, the boosters-tank configuration will be used on space shuttle Atlantis for mission STS-122, which is targeted for launch on Dec. 6. Photo credit: Kim Shiflett KSC-07pd2878

KENNEDY SPACE CENTER, FLA. -- In the Vehicle Assembly Building at NASA's Kennedy Space Center, the external tank is lowered toward the solid rocket boosters on the mobile launcher platform below. After mating, the boosters-tank configuration will be used on space shuttle Atlantis for mission STS-122, which is targeted for launch on Dec. 6. Photo credit: Kim Shiflett KSC-07pd2873

KENNEDY SPACE CENTER, FLA. -- In the Vehicle Assembly Building at NASA's Kennedy Space Center, the external tank is lowered toward the solid rocket boosters on the mobile launcher platform below. Visible on the bottom is an orbiter aft attachment. After mating, the boosters-tank configuration will be used on space shuttle Atlantis for mission STS-122, which is targeted for launch on Dec. 6. Photo credit: Kim Shiflett KSC-07pd2874

KENNEDY SPACE CENTER, FLA. -- In the Vehicle Assembly Building at NASA's Kennedy Space Center, the external tank is lowered between the solid rocket boosters on the mobile launcher platform below. After mating, the boosters-tank configuration will be used on space shuttle Atlantis for mission STS-122, which is targeted for launch on Dec. 6. Photo credit: Kim Shiflett KSC-07pd2880

KENNEDY SPACE CENTER, FLA. -- In the Vehicle Assembly Building at NASA's Kennedy Space Center, the external tank is lowered toward the solid rocket boosters on the mobile launcher platform below. Visible on the bottom are the orbiter aft attachments. After mating, the boosters-tank configuration will be used on space shuttle Atlantis for mission STS-122, which is targeted for launch on Dec. 6. Photo credit: Kim Shiflett KSC-07pd2875

KENNEDY SPACE CENTER, FLA. -- External tank No. 124 is lowered between the twin solid rocket boosters in high bay 1 of the Vehicle Assembly Building. The tank will be mated with the SRBs, already in place on the mobile launcher platform, for mission STS-117. The mission is targeted to launch on March 16 aboard Space Shuttle Atlantis. Photo credit: NASA/Kim Shiflett KSC-07pd0143

KENNEDY SPACE CENTER, FLA. -- In the Vehicle Assembly Building at NASA's Kennedy Space Center, United Space Alliance technicians get ready to lower the external tank to be mated with the solid rocket boosters on the mobile launcher platform. The boosters-tank configuration will be used on space shuttle Atlantis for mission STS-122, which is targeted for launch on Dec. 6. Photo credit: Kim Shiflett KSC-07pd2872

description

Summary

KENNEDY SPACE CENTER, FLA. -- In the Vehicle Assembly Building at NASA's Kennedy Space Center, United Space Alliance technicians get ready to lower the external tank to be mated with the solid rocket boosters on the mobile launcher platform. The boosters-tank configuration will be used on space shuttle Atlantis for mission STS-122, which is targeted for launch on Dec. 6. Photo credit: Kim Shiflett

The Space Shuttle program was the United States government's manned launch vehicle program from 1981 to 2011, administered by NASA and officially beginning in 1972. The Space Shuttle system—composed of an orbiter launched with two reusable solid rocket boosters and a disposable external fuel tank— carried up to eight astronauts and up to 50,000 lb (23,000 kg) of payload into low Earth orbit (LEO). When its mission was complete, the orbiter would re-enter the Earth's atmosphere and lands as a glider. Although the concept had been explored since the late 1960s, the program formally commenced in 1972 and was the focus of NASA's manned operations after the final Apollo and Skylab flights in the mid-1970s. It started with the launch of the first shuttle Columbia on April 12, 1981, on STS-1. and finished with its last mission, STS-135 flown by Atlantis, in July 2011.

Space Shuttle Atlantis was a space shuttle that was operated by NASA as part of the Space Shuttle program. It was the fourth operational shuttle built, and the last one to be built before the program was retired in 2011. Atlantis was named after the first research vessel operated by the Woods Hole Oceanographic Institution, and it made its first flight in October 1985. Over the course of its career, Atlantis completed 33 missions and spent a total of 307 days in space. Its last mission was STS-135, which was the final mission of the Space Shuttle program. Atlantis is now on display at the Kennedy Space Center Visitor Complex in Florida. Space Shuttle Atlantis (Orbiter Vehicle Designation: OV-104) was one of the four first operational orbiters in the Space Shuttle fleet of NASA, the space agency of the United States. (The other two are Discovery and Endeavour.) Atlantis was the fourth operational shuttle built. Atlantis is named after a two-masted sailing ship that operated from 1930 to 1966 for the Woods Hole Oceanographic Institute. Atlantis performed well in 25 years of service, flying 33 missions.

Nothing Found.

label_outline

Tags

ov 104 kennedy space center technicians space alliance technicians tank rocket boosters rocket boosters launcher platform launcher platform boosters tank configuration boosters tank configuration atlantis space shuttle atlantis sts mission sts kim shiflett ksc space shuttle high resolution nasa
date_range

Date

1960 - 1969
collections

in collections

Space Shuttle Program

Space Shuttle Atlantis

The Fourth Pperational Shuttle Built
place

Location

create

Source

NASA
link

Link

https://images.nasa.gov/
copyright

Copyright info

Public Domain Dedication (CC0)

label_outline Explore Boosters Tank, Boosters Tank Configuration, Configuration

20 INCH FAN ENGINE MODEL BELLMOUTH CONFIGURATION - ACOUSTIC MUFFLER

CONFIGURATION AND INSTALLATION OF 5.5 INCH SONIC INLET IN THE 9X15 FOOT WIND TUNNEL

CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians close space shuttle Atlantis’ aft doors for the final time. The orbiter is undergoing final preparations for its transfer to the Kennedy Space Center Visitor complex targeted for November. The work is part of Transition and Retirement of the remaining shuttle. Atlantis is being prepared for public display at the visitor complex. Over the course of its 26-year career, Atlantis spent 293 days in space during 33 missions. For more information, visit http://www.nasa.gov/transition. Photo credit: NASA/Dimitri Gerondidakis KSC-2012-5615

J-85 F-106 AIRPLANE SPIKE INLET 40-60 TAKE OFF CONFIGURATION AT HANGAR APRON QUIET ENGINE SITE

S126E008423 - STS-126 - WRS Configuration in US Lab

CAPE CANAVERAL, Fla. - In Orbiter Processing Facility 1 at NASA's Kennedy Space Center in Florida, United Space Alliance technicians, lying on a work platform, remove window #8 from the top of the crew module of space shuttle Atlantis. Inspection and maintenance of the crew module windows is standard procedure between shuttle missions. Atlantis is next slated to deliver an Integrated Cargo Carrier and Russian-built Mini Research Module to the International Space Station on the STS-132 mission. The second in a series of new pressurized components for Russia, the module will be permanently attached to the Zarya module. Three spacewalks are planned to store spare components outside the station, including six spare batteries, a boom assembly for the Ku-band antenna and spares for the Canadian Dextre robotic arm extension. A radiator, airlock and European robotic arm for the Russian Multi-purpose Laboratory Module also are payloads on the flight. Launch is targeted for May 14. Photo credit: NASA/Glenn Benson KSC-2010-1082

GENERAL ELECTRIC GE AND BB&N TEST CONFIGURATION INST SCOOP AND MICROPHONE BOOM ARRAY

An F-4 Phantom II aircraft shows one angle of its weapon configuration while atop a pedestal at the Rome Air Development Center's Newport test site. The aircraft's antennas are being evaluated during the test

TITAN CENTAUR VENT TEST CONFIGURATION 3-2

CAPE CANAVERAL, Fla. -- A crane positions the 106.5-foot-long first stage of the Atlas V rocket for NASA's Mars Science Laboratory (MSL) mission inside the Vertical Integration Facility at Space Launch Complex 41 on Cape Canaveral Air Force Station. A United Launch Alliance Atlas V-541 configuration will be used to loft MSL into space. Curiosity’s 10 science instruments are designed to search for evidence on whether Mars has had environments favorable to microbial life, including chemical ingredients for life. The unique rover will use a laser to look inside rocks and release its gasses so that the rover’s spectrometer can analyze and send the data back to Earth. MSL is scheduled to launch Nov. 25 with a window extending to Dec. 18 and arrival at Mars Aug. 2012. For more information, visit http://www.nasa.gov/msl. Photo credit: NASA/Cory Huston KSC-2011-6840

CHIEF MASTER Sergeant (CMSGT) James Bankes (foreground), USAF, electronics technician, 193rd Special Operations Wing (SOW), Pennsylvania Air National Guard (PANG), on the EC-130E Commando Solo, makes adjustments to the broadcast signal while wearing his helmet and mask in NBC configuration, accomplishing his periodic chemical warfare defense training. The 193rd SOW is currently flying Commando Solo missions in support of Operation ENDURING FREEDOM

41G-37-056 - STS-41G - STS-41G shuttle configuration

Topics

ov 104 kennedy space center technicians space alliance technicians tank rocket boosters rocket boosters launcher platform launcher platform boosters tank configuration boosters tank configuration atlantis space shuttle atlantis sts mission sts kim shiflett ksc space shuttle high resolution nasa