visibility Similar

KENNEDY SPACE CENTER, FLA. -- The overhead sling lowers the orbiter Atlantis next to the external tank and solid rocket boosters stacked on the mobile launcher platform (MLP) below. Atlantis will be mated to the MLP as well. Space Shuttle Atlantis is targeted to roll out to Launch Pad 39A on February 14 for mission STS-117. The mission is No. 21 to the International Space Station and construction flight 13A. Photo credit: NASA/Amanda Diller KSC-07pd0333

CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility-1 at NASA’s Kennedy Space Center in Florida, one of the two payload bay doors on space shuttle Atlantis is closed in preparation for its move to the Vehicle Assembly Building. The work is part of the Space Shuttle Program’s transition and retirement processing of the space shuttle fleet. A groundbreaking was held Jan. 18 for Atlantis’ future home, a 65,000-square-foot exhibit hall in Shuttle Plaza at the Kennedy Space Center Visitor Complex. Atlantis is scheduled to roll over to the visitor complex in November in preparation for the exhibit’s grand opening in July 2013. For more information, visit http://www.nasa.gov/shuttle. Photo credit: NASA/Dimitri Gerondidakis KSC-2012-3481

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-2 (OPF-2) at NASA’s Kennedy Space Center in Florida, doors begin to close around the Raffaello multi-purpose logistics module after it was secured in the payload canister. A special payload removal device was used to remove it from Atlantis’ cargo bay. Raffaello will then be readied for transport to the Space Station Processing Facility where its contents will be unloaded. Atlantis completed NASA’s final space shuttle mission, STS-135, after landing at the center’s Shuttle Landing Facility, July 21, 2011, at 5:57 a.m. EDT. Following removal of all payloads in Atlantis’ cargo bay, workers will begin to prepare the spacecraft for eventual permanent display at the Kennedy Space Center Visitor Complex. Photo credit: Jim Grossman KSC-2011-6155

CAPE CANAVERAL, Fla. - In high bay 1 of the Vehicle Assembly Building at NASA’s Kennedy Space Center, space shuttle Endeavour is lowered alongside its external fuel tank and solid rocket boosters for mating. After additional preparations are made, the shuttle will be rolled out to Launch Pad 39B. Endeavour is designated the rescue spacecraft for space shuttle Atlantis’ STS-125 mission to NASA’s Hubble Space Telescope, targeted for October. After Atlantis has safely returned from its flight, Endeavour will be moved to Launch Pad 39A for its STS-126 mission to the International Space Station, targeted for November. Photo credit: NASA/Kim Shiflett KSC-08pd2616

HAMPTON, Va. – At the Naval Station Norfolk near NASA’s Langley Research Center in Virginia, the Orion boilerplate test article is reflected in water on a U.S. Navy ship. The test article and support equipment for a stationary recovery test were transferred to the ship from a floating dock system. NASA and the U.S. Navy are conducting tests to prepare for recovery of the Orion crew module and forward bay cover on its return from a deep space mission. The stationary recovery test will allow the teams to demonstrate and evaluate the recovery processes, procedures, hardware and personnel in a controlled environment before conducting a second recovery test next year in open waters. Orion is the exploration spacecraft designed to carry astronauts to destinations not yet explored by humans, including an asteroid and Mars. It will have emergency abort capability, sustain the crew during space travel and provide safe re-entry from deep space return velocities. The first unpiloted test flight of the Orion is scheduled to launch in 2014 atop a Delta IV rocket and in 2017 on NASA’s Space Launch System rocket. For more information, visit http://www.nasa.gov/orion. Photo credit: NASA/Dimitri Gerondidakis KSC-2013-3293

s124e007434 - STS-124 - Public domain NASA photogrpaph

S123E008109 - STS-123 - Survey view of Bay 16 on the P1 Truss taken during Joint Operations

s133E010908 - STS-133 - Fly around of ISS

KENNEDY SPACE CENTER, FLA. - From this unique view on an upper level of the Vehicle Assembly Building, the solid rocket boosters (SRBs) are seen being stacked for the orbiter Discovery and mission STS-116. Discovery will be rolling over to the VAB in early November to be stacked with the SRBs and external tank for launch. STS-116 will be mission number 20 to the International Space Station and construction flight 12A.1. The mission payload is the SPACEHAB module, the P5 integrated truss structure and other key components. Launch is scheduled for no earlier than Dec. 7. Photo credit: NASA/Jack Pfaller KSC-06pd2260

code Related

KENNEDY SPACE CENTER, FLA. -- External tank No. 124 is lowered into high bay 1 of the Vehicle Assembly Building where it will be mated with the solid rocket boosters for mission STS-117. The boosters are already in place on the mobile launcher platform in the VAB. The mission is targeted to launch on March 16 aboard Space Shuttle Atlantis. Photo credit: NASA/Kim Shiflett KSC-07pd0139

KENNEDY SPACE CENTER, FLA. -- External tank No. 124 is lowered into high bay 1 of the Vehicle Assembly Building where it will be mated with the solid rocket boosters for mission STS-117. The boosters are already in place on the mobile launcher platform in the VAB. The mission is targeted to launch on March 16 aboard Space Shuttle Atlantis. Photo credit: NASA/Kim Shiflett KSC-07pd0140

KENNEDY SPACE CENTER, FLA. -- External tank No. 124 is lowered into high bay 1 of the Vehicle Assembly Building where it will be mated with the solid rocket boosters for mission STS-117. The boosters are already in place on the mobile launcher platform in the VAB. The mission is targeted to launch on March 16 aboard Space Shuttle Atlantis. Photo credit: NASA/Kim Shiflett KSC-07pd0141

KENNEDY SPACE CENTER, FLA. -- External tank No. 124 is lowered between the twin solid rocket boosters in high bay 1 of the Vehicle Assembly Building. The tank will be mated with the SRBs, already in place on the mobile launcher platform, for mission STS-117. The mission is targeted to launch on March 16 aboard Space Shuttle Atlantis. Photo credit: NASA/Kim Shiflett KSC-07pd0143

KENNEDY SPACE CENTER, FLA. -- External tank No. 124 is lowered between the twin solid rocket boosters in high bay 1 of the Vehicle Assembly Building. The tank will be mated with the SRBs, already in place on the mobile launcher platform, for mission STS-117. The mission is targeted to launch on March 16 aboard Space Shuttle Atlantis. Photo credit: NASA/Kim Shiflett KSC-07pd0142

KENNEDY SPACE CENTER, FLA. -- In the Vehicle Assembly Building at NASA's Kennedy Space Center, United Space Alliance technicians get ready to lower the external tank to be mated with the solid rocket boosters on the mobile launcher platform. The boosters-tank configuration will be used on space shuttle Atlantis for mission STS-122, which is targeted for launch on Dec. 6. Photo credit: Kim Shiflett KSC-07pd2872

KENNEDY SPACE CENTER, FLA. -- Above the transfer aisle of the Vehicle Assembly Building, external tank No. 125 has been raised to a nearly vertical position. It will next be lifted into a checkout cell in high bay 4 to allow for processing. The tank will be part of the space shuttle stack for mission STS-122 targeted to launch Dec. 6. Photo credit: NASA/Troy Cryder KSC-07pd2476

KENNEDY SPACE CENTER, FLA. - Inside the Vehicle Assembly Building, the external tank is mated to its twin solid rocket boosters on the mobile launch platform in high bay 3 for mission STS-116. The gigantic, rust-colored external tank is the largest element of the Space Shuttle system at 27.6 feet wide and 154 feet tall. STS-116 will be mission No. 20 to the International Space Station and construction flight 12A.1. The mission payload is the SPACEHAB module, the P5 integrated truss structure and other key components. Launch is scheduled for no earlier than Dec. 7. Photo credit: NASA/Jack Pfaller KSC-06pd2293

KENNEDY SPACE CENTER, FLA. - Inside the Vehicle Assembly Building, workers prepare to transfer the external tank from the checkout cell for attaching to its twin solid rocket boosters on the mobile launch platform in highbay 3 for mission STS-116. The gigantic, rust-colored external tank is the largest element of the Space Shuttle system at 27.6-feet wide and 154-feet tall. STS-116 will be mission no. 20 to the International Space Station and construction flight 12A.1. The mission payload is the SPACEHAB module, the P5 integrated truss structure and other key components. Launch is scheduled for no earlier than Dec. 7. Photo credit: NASA/Jack Pfaller KSC-06pd2285

KENNEDY SPACE CENTER, FLA. -- External tank No. 124 is moved from its checkout cell in the Vehicle Assembly Building to high bay 1 where it will be mated with the solid rocket boosters for mission STS-117. The boosters are already in place on the mobile launcher platform in the VAB. The mission is targeted to launch on March 16 aboard Space Shuttle Atlantis. Photo credit: NASA/Kim Shiflett KSC-07pd0138

description

Summary

KENNEDY SPACE CENTER, FLA. -- External tank No. 124 is moved from its checkout cell in the Vehicle Assembly Building to high bay 1 where it will be mated with the solid rocket boosters for mission STS-117. The boosters are already in place on the mobile launcher platform in the VAB. The mission is targeted to launch on March 16 aboard Space Shuttle Atlantis. Photo credit: NASA/Kim Shiflett

The Space Shuttle program was the United States government's manned launch vehicle program from 1981 to 2011, administered by NASA and officially beginning in 1972. The Space Shuttle system—composed of an orbiter launched with two reusable solid rocket boosters and a disposable external fuel tank— carried up to eight astronauts and up to 50,000 lb (23,000 kg) of payload into low Earth orbit (LEO). When its mission was complete, the orbiter would re-enter the Earth's atmosphere and lands as a glider. Although the concept had been explored since the late 1960s, the program formally commenced in 1972 and was the focus of NASA's manned operations after the final Apollo and Skylab flights in the mid-1970s. It started with the launch of the first shuttle Columbia on April 12, 1981, on STS-1. and finished with its last mission, STS-135 flown by Atlantis, in July 2011.

Space Shuttle Atlantis was a space shuttle that was operated by NASA as part of the Space Shuttle program. It was the fourth operational shuttle built, and the last one to be built before the program was retired in 2011. Atlantis was named after the first research vessel operated by the Woods Hole Oceanographic Institution, and it made its first flight in October 1985. Over the course of its career, Atlantis completed 33 missions and spent a total of 307 days in space. Its last mission was STS-135, which was the final mission of the Space Shuttle program. Atlantis is now on display at the Kennedy Space Center Visitor Complex in Florida. Space Shuttle Atlantis (Orbiter Vehicle Designation: OV-104) was one of the four first operational orbiters in the Space Shuttle fleet of NASA, the space agency of the United States. (The other two are Discovery and Endeavour.) Atlantis was the fourth operational shuttle built. Atlantis is named after a two-masted sailing ship that operated from 1930 to 1966 for the Woods Hole Oceanographic Institute. Atlantis performed well in 25 years of service, flying 33 missions.

Nothing Found.

label_outline

Tags

ov 104 kennedy space center tank checkout cell checkout cell bay rocket boosters rocket boosters sts mission sts launcher platform launcher platform vab atlantis space shuttle atlantis space shuttle vehicle assembly building high resolution space module nasa
date_range

Date

1970 - 1979
collections

in collections

Space Shuttle Program

Space Shuttle Atlantis

The Fourth Pperational Shuttle Built
place

Location

create

Source

NASA
link

Link

https://images.nasa.gov/
copyright

Copyright info

Public Domain Dedication (CC0)

label_outline Explore Checkout Cell, Ov 104, Launcher Platform

STS-132 ATLANTIS ROLLOUT FROM VAB TO PAD 39A 2010-2919

CAPE CANAVERAL, Fla. -- Technicians in the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, are jacking crawler-transporter 2, or CT-2, four feet off the floor to facilitate removal of the roller bearing assemblies. After inspections, new assemblies will be installed. The Ground Systems Development and Operations Program office at Kennedy is overseeing the upgrades to CT-2 so that it can carry NASA’s Space Launch System heavy-lift rocket and new Orion spacecraft to the launch pad. For more than 45 years the crawler-transporters were used to transport the mobile launcher platform and the Apollo-Saturn V rockets and, later, space shuttles to Launch Pads 39A and B. Photo credit: NASA/Charisse Nahser KSC-2013-1930

CAPE CANAVERAL, Fla. - In Orbiter Processing Facility 1 at NASA's Kennedy Space Center in Florida, United Space Alliance technicians, lying on a work platform, remove window #8 from the top of the crew module of space shuttle Atlantis. Inspection and maintenance of the crew module windows is standard procedure between shuttle missions. Atlantis is next slated to deliver an Integrated Cargo Carrier and Russian-built Mini Research Module to the International Space Station on the STS-132 mission. The second in a series of new pressurized components for Russia, the module will be permanently attached to the Zarya module. Three spacewalks are planned to store spare components outside the station, including six spare batteries, a boom assembly for the Ku-band antenna and spares for the Canadian Dextre robotic arm extension. A radiator, airlock and European robotic arm for the Russian Multi-purpose Laboratory Module also are payloads on the flight. Launch is targeted for May 14. Photo credit: NASA/Glenn Benson KSC-2010-1082

CAPE CANAVERAL, Fla. – As part of NASA's Ground Systems Development and Operations Program at the Kennedy Space Center in Florida, a large space shuttle-era work platform is being lowered and removed from high bay 3 of the Vehicle Assembly Building, or VAB. The work is part of a center-wide modernization and refurbishment initiative to accommodate NASA’s Space Launch System and a variety of other spacecraft instead of the whole building supporting one design. The Ground Systems Development and Operations Program is developing the necessary ground systems, infrastructure and operational approaches required to safely process, assemble, transport and launch the next generation of rockets and spacecraft in support of NASA’s exploration objectives. Future work also will replace the antiquated communications, power and vehicle access resources with modern efficient systems. Some of the utilities and systems slated for replacement have been used since the VAB opened in 1965. For more information, visit http://www.nasa.gov/exploration/systems/ground/index.html Photo credit: NASA/Jim Grossmann KSC-2012-5965

KENNEDY SPACE CENTER, FLA. -- Inside the VAB, orbiter Endeavour is lifted to a vertical position before being mated to the external tank (bottom of photo) and solid rocket boosters in high bay 1. Space Shuttle Endeavour is targeted for launch on mission STS-99 Jan. 13, 2000, at 1:11 p.m. EST. STS-99 is the Shuttle Radar Topography Mission, an international project spearheaded by the National Imagery and Mapping Agency and NASA, with participation of the German Aerospace Center DLR. The SRTM consists of a specially modified radar system that will gather data for the most accurate and complete topographic map of the Earth's surface that has ever been assembled. SRTM will make use of radar interferometry, wherein two radar images are taken from slightly different locations. Differences between these images allow for the calculation of surface elevation, or change. The SRTM hardware will consist of one radar antenna in the shuttle payload bay and a second radar antenna attached to the end of a mast extended 60 meters (195 feet) out from the shuttle KSC-99pp1381

CAPE CANAVERAL, Fla. -- Ground support equipment technicians monitor the progress as crawler-transporter 1 begins its trek to Launch Pad 39A at NASA’s Kennedy Space Center in Florida. New jacking, equalizing and leveling, or JEL, hydraulic cylinders were installed on CT-1 and are being tested for increased load carrying capacity and reliability. The Vehicle Assembly Building is visible in the background. The Ground Systems Development and Operations Program at Kennedy continues to upgrade the crawler-transporter as part of its general maintenance. CT-1 could be available to carry a variety of launch vehicles to the launch pad. Two crawler-transporters were used to carry the mobile launcher platform and space shuttle to Launch Complex 39 for space shuttle launches for 30 years. Photo credit: NASA/Daniel Casper KSC-2013-4203

CAPE CANAVERAL, Fla. – In the Vehicle Assembly Building at NASA's Kennedy Space Center, the external tank for space shuttle Atlantis is lowered toward the solid rocket boosters (the nose cone of one of the boosters is seen here) for mating. The tank and boosters will be secured on the mobile launcher platform below. Atlantis' STS-125 mission is the fifth and final shuttle servicing mission to NASA’s Hubble Space Telescope. Launch is targeted for Oct. 8. Photo credit: NASA/Jack Pfaller KSC-08pd2265

KENNEDY SPACE CENTER, FLA. -- After leaving the Orbiter Processing Facility bay 2, the orbiter Endeavour, atop its transporter, rolls toward the Vehicle Assembly Building. In the VAB, it will be stacked with the external tank and solid rocket boosters atop the mobile launcher platform for its launch on mission STS-118. The mission will be Endeavour's first flight in more than four years. The shuttle has undergone extensive modifications, including the addition of safety upgrades already added to shuttles Discovery and Atlantis. Endeavour also features new hardware, such as the Station-to-Shuttle Power Transfer System that will allow the docked shuttle to draw electrical power from the station and extend its visits to the orbiting lab. Endeavour is targeted for launch on Aug. 7. Photo credit: NASA/Kim Shiflett KSC-07pd1709

CAPE CANAVERAL, Fla. - In the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida, external fuel tank, ET-138, for space shuttle Atlantis' STS-135 mission, is lowered into high bay-1 for joining with the twin solid rocket boosters on the mobile launcher platform. Shuttle Atlantis' move, or "rollover," from Orbiter Processing Facility-1 to the VAB is targeted for May 10. Once there it will be mated with the external tank and boosters. Atlantis and its crew of four will deliver the Raffaello multipurpose logistics module packed with supplies and spare parts to the International Space Station. STS-135 is targeted to launch June 28, and will be the last spaceflight for the Space Shuttle Program. Photo credit: NASA/Jack Pfaller KSC-2011-3043

CAPE CANAVERAL, Fla. -- Seen through the open bay door of the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida, space shuttle Discovery is being prepared for its move to Orbiter Processing Facility-1 (OPF-1). Discovery is switching places with shuttle Endeavour which has been undergoing decommissioning activities in OPF-1. Both shuttles will stop briefly outside OPF-3 for a "nose-to-nose" photo opportunity. Discovery then will be rolled into OPF-1 and Endeavour into the VAB. In OPF-1, Discovery will undergo further preparations for public display at the Smithsonian's National Air and Space Museum Steven F. Udvar-Hazy Center in Virginia. Endeavour will be stored in the VAB until October when it will be moved into OPF-2 for further work to get it ready for public display at the California Science Center in Los Angeles. For more information, visit http://www.nasa.gov/shuttle. Photo credit: NASA/Dimitri Gerondidakis KSC-2011-6415

CAPE CANAVERAL, Fla. – In the Vehicle Assembly Building transfer aisle at NASA's Kennedy Space Center, the overhead crane lifts space shuttle Atlantis from its transporter. Atlantis will be raised to vertical for transfer to high bay 3. There it will be stacked with its external fuel tank and twin solid rocket boosters. After additional preparations are made, the shuttle will be rolled out to Launch Pad 39A to prepare for launch on the STS-125 mission targeted for 1:34 a.m. EDT Oct. 8. Photo credit: NASA/Dimitri Gerondidakis KSC-08pd2487

Saturn V launch vehicle for the Apollo 4

Topics

ov 104 kennedy space center tank checkout cell checkout cell bay rocket boosters rocket boosters sts mission sts launcher platform launcher platform vab atlantis space shuttle atlantis space shuttle vehicle assembly building high resolution space module nasa