visibility Similar

COMMUNITY WORKING GROUP TOUR OF PLUM BROOK REACTOR FACILITY

The American journal of roentgenology, radium therapy and nuclear medicine (1906) (14734500196)

Prinses Margaret en Lord Snowdon vertrokken per boot

Brockhaus and Efron Encyclopedic Dictionary b44 856-0

KENNEDY SPACE CENTER, FLA. - On Launch Pad 17-B at Cape Canaveral Air Force Station in Florida, workers maneuver the transporter carrying the second stage segment of a Delta II rocket into the High-Pressure Test Facility for leak testing. The segment was destacked from the Delta II rocket in the mobile service tower. At the Boeing plant in Alabama, a leak was observed in the second-stage oxidizer tank for another Delta II that had been scheduled to launch in November; therefore, all identical tanks scheduled for launch in the near future are being checked. The second stage for the Delta II that will launch STEREO cannot be effectively tested while atop the first stage at Pad 17-B. STEREO stands for Solar Terrestrial Relations Observatory and comprises two spacecraft. The STEREO mission is the first to take measurements of the sun and solar wind in 3-dimension. This new view will improve our understanding of space weather and its impact on the Earth. STEREO is expected to lift off in late August 2006. Photo credit: NASA/Jim Grossmann KSC-06pd1698

NASA ARMY AAH TADS EXPERIMENT - Glenn Research Center History

Sweden, Karlskrona. Various industrial facilities %s

International Nickel Co. at Coast & Geodetic Survey. Camera and sinks V, U.S. Coast & Geodetic Survey

An F-16 from Shaw Air Force Base, S.C., makes a direct

code Related

KENNEDY SPACE CENTER, FLA. -- Technicians check out a jacking, equalization and leveling (JEL) cylinders from Crawler-Transporter No. 2. During inspections, technicians removed two of the 16 JEL cylinders on the vehicle to gain access to the bearings for routine maintenance and found three of the four bearings had cracks. Of the three bearings, two had extensive damage. Further eddy current inspections indicate that cracks are present on 15 of the bearings. There are 16 cylinders and 32 bearings per crawler. Although no cause for the cracks is known at this time, engineers are currently evaluating the situation to determine the most appropriate solution. The crawler is in the background. KSC-02pd1170

KENNEDY SPACE CENTER, FLA. -- A crane operator (center) talks with technicians (right) standing next to one of the jacking, equalization and leveling (JEL) cylinders from Crawler-Transporter No. 2. During inspections, technicians removed two of the 16 JEL cylinders on the vehicle to gain access to the bearings for routine maintenance and found three of the four bearings had cracks. Of the three bearings, two had extensive damage. Further eddy current inspections indicate that cracks are present on 15 of the bearings. There are 16 cylinders and 32 bearings per crawler. Although no cause for the cracks is known at this time, engineers are currently evaluating the situation to determine the most appropriate solution. KSC-02pd1171

KENNEDY SPACE CENTER, FLA. -- Technicians closely monitor a jacking, equalization and leveling (JEL) cylinder and bearing from Crawler-Transporter No. 2 as it lowered by a crane to a position on the ground. During routine maintenance inspections last week, technicians removed two of the 16 JEL cylinders on the crawler to gain access to the bearings and found three of the four bearings cracked. Further eddy current inspections indicated that cracks are present on 15 of the bearings. There are 16 cylinders and 32 bearings per crawler. Engineers are evaluating the situation to determine the cause of the cracks and an appropriate solution to the problem. KSC-02pd1184

KENNEDY SPACE CENTER, FLA. -- A technician steadies a jacking, equalization and leveling (JEL) cylinder and bearing from Crawler-Transporter No. 2 as it is lowered by a crane to a position on the ground. During routine maintenance inspections last week, technicians removed two of the 16 JEL cylinders on the crawler to gain access to the bearings and found three of the four bearings cracked. Further eddy current inspections indicated that cracks are present on 15 of the bearings. There are 16 cylinders and 32 bearings per crawler. Engineers are evaluating the situation to determine the cause of the cracks and an appropriate solution to the problem. KSC-02pd1185

KENNEDY SPACE CENTER, FLA. -- Technicians closely monitor a jacking, equalization and leveling (JEL) cylinder and bearing from Crawler-Transporter No. 2 as it lowered by a crane to a position on the ground. During routine maintenance inspections last week, technicians removed two of the 16 JEL cylinders on the crawler to gain access to the bearings and found three of the four bearings cracked. Further eddy current inspections indicated that cracks are present on 15 of the bearings. There are 16 cylinders and 32 bearings per crawler. Engineers are evaluating the situation to determine the cause of the cracks and an appropriate solution to the problem. KSC-02pd1183

KENNEDY SPACE CENTER, FLA. -- Technicians supervise a jacking, equalization and leveling (JEL) cylinder and bearing from Crawler-Transporter No. 2 as it is lowered by a crane to a position on the ground. During routine maintenance inspections last week, technicians removed two of the 16 JEL cylinders on the crawler to gain access to the bearings and found three of the four bearings cracked. Further eddy current inspections indicated that cracks are present on 15 of the bearings. There are 16 cylinders and 32 bearings per crawler. Engineers are evaluating the situation to determine the cause of the cracks and an appropriate solution to the problem. KSC-02pd1186

KENNEDY SPACE CENTER, FLA. -- Technicians hook a crane to a jacking, equalization and leveling (JEL) cylinder and bearing on Crawler-Transporter No. 2 in preparation for its removal. During routine maintenance inspections last week, technicians removed two of the 16 JEL cylinders on the crawler to gain access to the bearings and found three of the four bearings cracked. Further eddy current inspections indicated that cracks are present on 15 of the bearings. There are 16 cylinders and 32 bearings per crawler. Engineers are evaluating the situation to determine the cause of the cracks and an appropriate solution to the problem. KSC-02pd1177

KENNEDY SPACE CENTER, FLA. -- Technicians hook a crane to a jacking, equalization and leveling (JEL) cylinder and bearing on Crawler-Transporter No. 2 in preparation for its removal. During routine maintenance inspections last week, technicians removed two of the 16 JEL cylinders on the crawler to gain access to the bearings and found three of the four bearings cracked. Further eddy current inspections indicated that cracks are present on 15 of the bearings. There are 16 cylinders and 32 bearings per crawler. Engineers are evaluating the situation to determine the cause of the cracks and an appropriate solution to the problem. KSC-02pd1178

KENNEDY SPACE CENTER, FLA. -- A crane lowers a jacking, equalization and leveling (JEL) cylinder and bearing from Crawler-Transporter No. 2 to a position on the ground. During routine maintenance inspections last week, technicians removed two of the 16 JEL cylinders on the crawler to gain access to the bearings and found three of the four bearings cracked. Further eddy current inspections indicated that cracks are present on 15 of the bearings. There are 16 cylinders and 32 bearings per crawler. Engineers are evaluating the situation to determine the cause of the cracks and an appropriate solution to the problem. KSC-02pd1181

KENNEDY SPACE CENTER, FLA. -- Technicians check out a jacking, equalization and leveling (JEL) cylinders from Crawler-Transporter No. 2. During inspections, technicians removed two of the 16 JEL cylinders on the vehicle to gain access to the bearings for routine maintenance and found three of the four bearings had cracks. Of the three bearings, two had extensive damage. Further eddy current inspections indicate that cracks are present on 15 of the bearings. There are 16 cylinders and 32 bearings per crawler. Although no cause for the cracks is known at this time, engineers are currently evaluating the situation to determine the most appropriate solution. KSC-02pd1169

description

Summary

KENNEDY SPACE CENTER, FLA. -- Technicians check out a jacking, equalization and leveling (JEL) cylinders from Crawler-Transporter No. 2. During inspections, technicians removed two of the 16 JEL cylinders on the vehicle to gain access to the bearings for routine maintenance and found three of the four bearings had cracks. Of the three bearings, two had extensive damage. Further eddy current inspections indicate that cracks are present on 15 of the bearings. There are 16 cylinders and 32 bearings per crawler. Although no cause for the cracks is known at this time, engineers are currently evaluating the situation to determine the most appropriate solution.

Nothing Found.

label_outline

Tags

kennedy space center technicians check equalization jel cylinders crawler transporter inspections jel cylinders vehicle gain access gain access bearings maintenance four bearings cracks three bearings damage eddy crawler cause engineers situation solution high resolution nasa florida cape canaveral
date_range

Date

13/08/2002
place

Location

create

Source

NASA
link

Link

https://images.nasa.gov/
copyright

Copyright info

Public Domain Dedication (CC0)

label_outline Explore Jel Cylinders, Four Bearings, Equalization

SPEC. 4 Ann M. Hrubec, a pharmacy technician, produces a sterile IV solution in the pharmacy at Kenner Army Hospital

STS098-323-026 - STS-098 - Manual Pressure Equalization Valve (MPEV) on hatch

US Marine Corps Lance Corporal Jake Duffield keeps watch on the sky, while US Marine Corps Lance Corporal William Spinale listens on communications, and US Marine Corps Corporal Bradley Strohl gets an Avenger Stinger System up and running in case any enemy aircraft come in range. Marines from 2nd Platoon, 1ST Stinger Battery, are engaged in a day long exercise to sharpen their anti-aircraft tactics on Le Shima island, Okinawa, Japan. The exercise was conducted to give young Marines the chance to gain field experience and develop leadership through hands on training

KENNEDY SPACE CENTER, FLA. -- James Stickley and Kristin Rumpf, both with United Space Alliance - Main Propulsion System Engineering, discuss procedures about welding the minute cracks on Endeavour's flow liners. Endeavour is scheduled to fly on mission STS-113 in November. The mission payload is the P1 Integrated Truss Structure, the first portside truss to go to the International Space Station, and will be attached to the central truss segment, S0, on the Station. Also additional cooling radiators will be delivered but will remain stowed until flight 12A.1. KSC-02pd1204

CAPE CANAVERAL, Fla. -- Ground support equipment technicians monitor the progress as crawler-transporter 1 begins its trek to Launch Pad 39A at NASA’s Kennedy Space Center in Florida. New jacking, equalizing and leveling, or JEL, hydraulic cylinders were installed on CT-1 and are being tested for increased load carrying capacity and reliability. The Vehicle Assembly Building is visible in the background. The Ground Systems Development and Operations Program at Kennedy continues to upgrade the crawler-transporter as part of its general maintenance. CT-1 could be available to carry a variety of launch vehicles to the launch pad. Two crawler-transporters were used to carry the mobile launcher platform and space shuttle to Launch Complex 39 for space shuttle launches for 30 years. Photo credit: NASA/Daniel Casper KSC-2013-4203

Ensign Gavin Murray, from Anacortes, Wash., assigned to the amphibious assault ship USS Boxer (LHD 4), reads bearings on the alidade while standing junior officer of the deck watch on the bridge.

Earthquake - Calexico, Calif. , June 14, 2010 -- A 7. 2 magnitude earthquake struck the water treatment tanks and damaged the massive reservoirs. FEMA, Cal EMA, and local officials are inspecting the structures for cracks and damages associated with Public Assistance (PA) emergency protective measures. Adam DuBrowa/FEMA

A person holding a bowl full of blackberries. Aronia small fruit hand, food drink.

SMALL AREAS OF CLAYTON NEW MEXICO MOD-0A WIND TURBINE BLADES SHOWING CRACKS - ETCETERA

Production. War housing trailers. Paper replaces steel as material for rounded corners of house trailer tops. These corners, made of successive layers of paper impregnated with a special hardening solution, have great structural strength and are light in weight. Easy installation is another valuable feature of the material as used in the making of war housing trailers at the Los Angeles plant of Western Trailer Company

Conversion. Beverage containers to aviation oxygen cylinders. After they are stamped on the huge toggle press in the metal division of a large rubber factory, these cylindrical domes which make up half of a shatterproof oxygen cylinder, are placed on a large conveyor where they are carried to workmen who will apply the circumferential and longitudinal straps. Cylinders are used for high altitude flying as a source of oxygen. Firestone, Akron, Ohio

MACHINE SHOP - VARIOUS HUB PARTS AND BEARINGS - STA 81.5 RIB ON THE MOD-O WIND TURBINE BLADE

Topics

kennedy space center technicians check equalization jel cylinders crawler transporter inspections jel cylinders vehicle gain access gain access bearings maintenance four bearings cracks three bearings damage eddy crawler cause engineers situation solution high resolution nasa florida cape canaveral