visibility Similar

BOEING DELTA 4 SHROUD SEPARATION TEST IN SPACE POWER FACILITY AT NASA PLUM BROOK STATION

A construction crew works on a radome as part of a

KENNEDY SPACE CENTER, Fla. -- In the Payload Changeout Room, Launch Pad 39B, the Joint Airlock Module (below) and Space Lab Double Pallet (above) are moved into the payload bay of Space Shuttle Atlantis for mission STS-104. The pallet contains two oxygen and two nitrogen High-Pressure Gas Tanks, which will be attached externally to the airlock during two of the STS-104 spacewalks. Once installed and activated, the airlock becomes the primary path for International Space Station spacewalk entry and departure using U.S. spacesuits, which are known as Extravehicular Mobility Units, or EMUs. In addition, the Joint Airlock is designed to support the Russian Orlan spacesuit for EVA activity. Launch of Atlantis is scheduled no earlier than July 12 at 5:04 a.m. EDT KSC-01pp1199

CAPE CANAVERAL, Fla. – On Cape Canaveral Air Force Station's Launch Complex 17-B in Florida, workers check the first stage of a Delta II rocket before it is lifted into the mobile service tower. The rocket is the launch vehicle for the STSS Demonstrators Program. STSS Demonstrators Program is a midcourse tracking technology demonstrator and is part of an evolving ballistic missile defense system. STSS is capable of tracking objects after boost phase and provides trajectory information to other sensors. It will be launched by NASA for the Missile Defense Agency on July 29. Photo credit: NASA/Jack Pfaller KSC-2009-2668

T&R/Atlantis - Weight and CG in Preparation for Roll to VAB 2012-3552

An undated video frame grab showing a close up view of the sunken freighter El Faro on the seafloor, 15,000-feet deep near the Bahamas.

BOEING DELTA 4 SHROUD SEPARATION TEST IN SPACE POWER FACILITY AT NASA PLUM BROOK STATION

HUBBLE SPACE TELESCOPE LOADING OF SMR HARDWARE FOR GSFC DEPARTURE

KENNEDY SPACE CENTER, FLA. -- In the payload changeout room (PCR) on Launch Pad 39A, workers prepare to open the canister containing the S3/S4 integrated truss. The PCR is the enclosed, environmentally controlled portion of the rotating service structure that supports cargo delivery to the pad and subsequent vertical installation into the orbiter payload bay. The truss is the payload for Space Shuttle Atlantis on mission STS-117 to the International Space Station. The Atlantis crew will install the new truss segment, retract a set of solar arrays and unfold a new set on the starboard side of the station. Launch is targeted for March 15. Photo credit: NASA/Jack Pfaller KSC-07pd0358

code Related

STEREO (Solar TErrestrial RElations Observatory) SPACECRAFT SHIPPING

description

Summary

The original finding aid described this as:

Description: PHOTOGRAPHS DURING THE STEREO (Solar TErrestrial RElations Observatory)SPACECRAFT SHIPPING + CRATING PROCEDURE..

Photographer: CHRIS GUNN

Date: 4/26/2006

Job Number: 2006-01206-0

Preservation Copy: .tif

2006

Nothing Found.

label_outline

Tags

stereo solar relations observatory relations observatory spacecraft shipping nasa high resolution solar terrestrial relations observatory spacecraft shipping crating procedure chris gunn job number preservation copy space program
date_range

Date

2006 - 2011
create

Source

The U.S. National Archives
link

Link

https://catalog.archives.gov/
copyright

Copyright info

No known copyright restrictions

label_outline Explore Spacecraft Shipping, Crating Procedure, Shipping

Topics

stereo solar relations observatory relations observatory spacecraft shipping nasa high resolution solar terrestrial relations observatory spacecraft shipping crating procedure chris gunn job number preservation copy space program