visibility Similar

STEREO (Solar TErrestrial RElations Observatory) SPACECRAFT SHIPPING

KENNEDY SPACE CENTER, Fla. -- In the Payload Changeout Room, Launch Pad 39B, the Joint Airlock Module (below) and Space Lab Double Pallet (above) are moved into the payload bay of Space Shuttle Atlantis for mission STS-104. The pallet contains two oxygen and two nitrogen High-Pressure Gas Tanks, which will be attached externally to the airlock during two of the STS-104 spacewalks. Once installed and activated, the airlock becomes the primary path for International Space Station spacewalk entry and departure using U.S. spacesuits, which are known as Extravehicular Mobility Units, or EMUs. In addition, the Joint Airlock is designed to support the Russian Orlan spacesuit for EVA activity. Launch of Atlantis is scheduled no earlier than July 12 at 5:04 a.m. EDT KSC-01pp1199

A construction crew works on a radome as part of a

KENNEDY SPACE CENTER, FLA. - The second stage of the Delta II rocket is raised to a vertical position for its lift up the launch tower on Pad 17-A, Cape Canaveral Air Force Station. It will be mated to the first stage in preparation for the launch of the Mars Exploration Rover 2 (MER-A). The MER Mission consists of two identical rovers designed to cover roughly 110 yards each Martian day over various terrain. Each rover will carry five scientific instruments that will allow it to search for evidence of liquid water that may have been present in the planet's past. Identical to each other, the rovers will land at different regions of Mars. Launch date for this first of NASA's two Mars Exploration Rover missions is scheduled June 5. KSC-03pd1323

An undated video frame grab showing a close up view of the sunken freighter El Faro on the seafloor, 15,000-feet deep near the Bahamas.

BOEING DELTA 4 SHROUD SEPARATION TEST IN SPACE POWER FACILITY AT NASA PLUM BROOK STATION

HUBBLE SPACE TELESCOPE LOADING OF SMR HARDWARE FOR GSFC DEPARTURE

CAPE CANAVERAL, Fla. – On Launch Pad 39A at NASA's Kennedy Space Center in Florida, workers check the movement of space shuttle Discovery's payload bay doors as they close around the cargo. The cargo consists of the integrated truss structure S6 and solar arrays for the STS-119 mission to the International Space Station. During Discovery's 14-day mission, the shuttle's seven astronauts will install the S6 truss to the starboard side of the space station, completing the station's truss, or backbone. Launch of Discovery on the STS-119 mission is targeted for Feb. 12. Photo credit: NASA/Dimitri Gerondidakis KSC-2009-1292

Delta II Second stage lift and mate

code Related

BOEING DELTA 4 SHROUD SEPARATION TEST IN SPACE POWER FACILITY AT NASA PLUM BROOK STATION

description

Summary

BOEING DELTA 4 SHROUD SEPARATION TEST IN SPACE POWER FACILITY AT NASA PLUM BROOK STATION

NASA Identifier: C-2002-360

label_outline

Tags

nasa boeing delta 4 shroud separation test in space power facility at nasa plum brook station dvids high resolution glenn research center aviation research organization ultra high resolution
date_range

Date

11/09/2009
place

Location

create

Source

Defense Visual Information Distribution Service
link

Link

https://www.dvidshub.net/
copyright

Copyright info

Public Domain Dedication. Public Use Notice of Limitations: https://www.dvidshub.net/about/copyright

label_outline Explore Boeing Delta 4 Shroud Separation Test In Space Power Facility At Nasa Plum Brook Station, Aviation Research Organization, Glenn Research Center

Topics

nasa boeing delta 4 shroud separation test in space power facility at nasa plum brook station dvids high resolution glenn research center aviation research organization ultra high resolution