visibility Similar

NASA’s Lunar Prospector is readied for launch as its gantry-like service tower is rolled back at Cape Canaveral Air Station’s Launch Complex 46. Lunar Prospector, built for the NASA Ames Research Center by Lockheed Martin, is a spin-stabilized spacecraft designed to provide NASA with the first global maps of the Moon’s surface and its gravitational magnetic fields, as well as look for the possible presence of ice near the lunar poles. It will orbit the Moon at an altitude of approximately 63 miles during a one-year mission. The launch of Lunar Prospector is scheduled for Jan. 5, 1998 at 8:31 p.m. EST KSC-lp0012

STS-124 - EOM - Public domain NASA photogrpaph

STS-120 - LAUNCH - Public domain NASA photogrpaph

STS-133 DISCOVERY - WEATHER FRONT - PRE RSS ROLLBACK 2010-5466

STS-135 - LAUNCH - Public domain NASA photogrpaph

STS-135 - LAUNCH - Public domain NASA photogrpaph

CAPE CANAVERAL, Fla. – At Cape Canaveral Air Force Station in Florida, the GOES-O and Delta IV second stage arrive on Launch Pad 37. They will be raised to vertical and moved into the mobile service tower. GOES–O is one of a series of Geostationary Operational Environmental Satellites. The multi-mission GOES series N-P will be a vital contributor to weather, solar and space operations and science. NASA and the National Oceanic and Atmospheric Administration, or NOAA, are actively engaged in a cooperative program to expand the existing GOES system with the launch of the GOES N-P satellites. Launch of the GOES-O is targeted for no earlier than April 2009. Photo credit: NASA/Jim Grossmann KSC-2009-1844

STS-132 - EOM - Public domain NASA photogrpaph

STS-135 - LAUNCH - Public domain NASA photogrpaph

code Related

Space Shuttle Discovery is Prepared for Launch

description

Summary

The space shuttle Discovery is seen shortly after the Rotating Service Structure was rolled back at launch pad 39A, at the Kennedy Space Center in Cape Canaveral, Florida, on Wednesday, Feb. 23, 2011. Discovery, on its 39th and final flight, will carry the Italian-built Permanent Multipurpose Module (PMM), Express Logistics Carrier 4 (ELC4) and Robonaut 2, the first humanoid robot in space to the International Space Station. Photo Credit: (NASA/Bill Ingalls)

The Space Shuttle program was the United States government's manned launch vehicle program from 1981 to 2011, administered by NASA and officially beginning in 1972. The Space Shuttle system—composed of an orbiter launched with two reusable solid rocket boosters and a disposable external fuel tank— carried up to eight astronauts and up to 50,000 lb (23,000 kg) of payload into low Earth orbit (LEO). When its mission was complete, the orbiter would re-enter the Earth's atmosphere and lands as a glider. Although the concept had been explored since the late 1960s, the program formally commenced in 1972 and was the focus of NASA's manned operations after the final Apollo and Skylab flights in the mid-1970s. It started with the launch of the first shuttle Columbia on April 12, 1981, on STS-1. and finished with its last mission, STS-135 flown by Atlantis, in July 2011.

Nothing Found.

label_outline

Tags

cape canaveral discovery kennedy space center launch pad 39 a sts 133 sts 133 preflight space shuttle ov 103 hq nasa bill ingalls space shuttle discovery prepared launch high resolution rocket launch space launch complex nasa
date_range

Date

23/02/2011
collections

in collections

Space Shuttle Program

place

Location

create

Source

NASA
link

Link

https://images.nasa.gov/
copyright

Copyright info

Public Domain Dedication (CC0)

label_outline Explore Sts 133 Preflight, Launch Pad 39 A, Sts 133

Topics

cape canaveral discovery kennedy space center launch pad 39 a sts 133 sts 133 preflight space shuttle ov 103 hq nasa bill ingalls space shuttle discovery prepared launch high resolution rocket launch space launch complex nasa