visibility Similar

code Related

KENNEDY SPACE CENTER, FLA. -- Space Shuttle Atlantis (background, right) approaches the doors of the Vehicle Assembly Building (left) on its way back from Launch Pad 39A. Atlantis has rolled back to the VAB so that workers can conduct inspections, make continuity checks and conduct X-ray analysis on the 36 solid rocket booster cables located inside each booster’s system tunnel. An extensive evaluation of NASA’s SRB cable inventory revealed conductor damage in four (of about 200) cables on the shelf. Shuttle managers decided to prove the integrity of the system tunnel cables already on Atlantis before launching Jan. 19. The launch has been rescheduled no earlier than Feb. 6 KSC01padig026

KENNEDY SPACE CENTER, FLA. -- Space Shuttle Atlantis nears the Vehicle Assembly Building (left) and Launch Control Center on its way back from Launch Pad 39A. Atlantis is rolling back to the VAB so that workers can conduct inspections, make continuity checks and conduct X-ray analysis on the 36 solid rocket booster cables located inside each booster’s system tunnel. An extensive evaluation of NASA’s SRB cable inventory revealed conductor damage in four (of about 200) cables on the shelf. Shuttle managers decided to prove the integrity of the system tunnel cables already on Atlantis before launching Jan. 19. The launch has been rescheduled no earlier than Feb. 6 KSC01padig024

KENNEDY SPACE CENTER, FLA. -- Viewed from the 235-foot level of the Fixed Service Structure on Launch Pad 39A, Space Shuttle Atlantis is seen looming above the pad. Traveling about 1 mph on the crawler-transporter, Atlantis is making the 3.4-mile trek back to the Vehicle Assembly Building so that workers can conduct inspections, make continuity checks and conduct X-ray analysis on the 36 solid rocket booster cables located inside each booster’s system tunnel (seen at left on the outside of the SRB). An extensive evaluation of NASA’s SRB cable inventory revealed conductor damage in four (of about 200) cables on the shelf. Shuttle managers decided to prove the integrity of the system tunnel cables already on Atlantis before launching Jan. 19. The launch has been rescheduled no earlier than Feb. 6 KSC01padig019

KENNEDY SPACE CENTER, FLA. -- Just before dawn, Space Shuttle Atlantis is spotlighted before it begins rolling back to the Vehicle Assembly Building from Launch Pad 39A. Atlantis is returning to the VAB so that workers can conduct inspections, make continuity checks and conduct X-ray analysis on the 36 solid rocket booster cables located inside each booster’s system tunnel. An extensive evaluation of NASA’s SRB cable inventory revealed conductor damage in four (of about 200) cables on the shelf. Shuttle managers decided to prove the integrity of the system tunnel cables already on Atlantis before launching Jan. 19. The launch has been rescheduled no earlier than Feb. 6 KSC01pp0132

KENNEDY SPACE CENTER, FLA. -- Space Shuttle Atlantis is framed by palms and winter-stripped branches as it wends its way from Launch Pad 39A back to the Vehicle Assembly Building. Atlantis is rolling back to the VAB so that workers can conduct inspections, make continuity checks and conduct X-ray analysis on the 36 solid rocket booster cables located inside each booster’s system tunnel. An extensive evaluation of NASA’s SRB cable inventory revealed conductor damage in four (of about 200) cables on the shelf. Shuttle managers decided to prove the integrity of the system tunnel cables already on Atlantis before launching Jan. 19. The launch has been rescheduled no earlier than Feb. 6 KSC01padig023

KENNEDY SPACE CENTER, FLA. -- Near the bottom of the solid rocket booster, a United Space Alliance SRB technician in the Vehicle Assembly Building detaches the SRB system tunnel cover of the 36 cables inside. Above and to the left is the bottom of the external tank. The SRB is part of Space Shuttle Atlantis, rolled back from Launch Pad 39A in order to conduct tests on the cables. A prior extensive evaluation of NASA’s SRB cable inventory on the shelf revealed conductor damage in four (of about 200) cables. Shuttle managers decided to prove the integrity of the system tunnel cables already on Atlantis before launching. Workers are conducting inspections, making continuity checks and conducting X-ray analysis on the cables. The launch has been rescheduled no earlier than Feb. 6. <br KSC01pp0148

KENNEDY SPACE CENTER, FLA. -- Space Shuttle Atlantis joins blue skies and palm trees on the Florida landscape. Atlantis is rolling back from Launch Pad 39A to the Vehicle Assembly Building so that workers can conduct inspections, make continuity checks and conduct X-ray analysis on the 36 SRB cables located inside each booster’s system tunnel. An extensive evaluation of NASA’s SRB cable inventory revealed conductor damage in four (of about 200) cables on the shelf. Shuttle managers decided to prove the integrity of the system tunnel cables already on Atlantis before launching Jan. 19. The launch has been rescheduled no earlier than Feb. 6 KSC01padig022

KENNEDY SPACE CENTER, FLA. -- Space Shuttle Atlantis is ready to roll back to the Vehicle Assembly Building via the crawler-transporter. In the VAB workers will conduct inspections, make continuity checks and conduct X-ray analysis on the 36 solid rocket booster cables located inside each booster’s system tunnel. An extensive evaluation of NASA’s SRB cable inventory revealed conductor damage in four (of about 200) cables on the shelf. Shuttle managers decided to prove the integrity of the system tunnel cables already on Atlantis before launching Jan. 19. The launch has been rescheduled no earlier than Feb. 6 KSC01pp0133

KENNEDY SPACE CENTER, FLA. -- Near the bottom of the solid rocket booster, a worker in the Vehicle Assembly Building begins to detach the SRB system tunnel cover on the 36 cables inside. The SRB is part of Space Shuttle Atlantis, rolled back from Launch Pad 39A in order to conduct tests on the cables. A prior extensive evaluation of NASA’s SRB cable inventory on the shelf revealed conductor damage in four (of about 200) cables. Shuttle managers decided to prove the integrity of the system tunnel cables already on Atlantis before launching. Workers are conducting inspections, making continuity checks and conducting X-ray analysis on the cables. The launch has been rescheduled no earlier than Feb. 6. <br KSC01pp0146

KENNEDY SPACE CENTER, FLA. -- Space Shuttle Atlantis , with its orange external tank and white solid rocket boosters attached, is viewed from the 235-foot level of the Fixed Service Structure on Launch Pad 39A. Atlantis is rolling back to the Vehicle Assembly Building so that workers can conduct inspections, make continuity checks and conduct X-ray analysis on the 36 SRB cables located inside each booster’s system tunnel (seen at left on the outside of the SRB). An extensive evaluation of NASA’s SRB cable inventory revealed conductor damage in four (of about 200) cables on the shelf. Shuttle managers decided to prove the integrity of the system tunnel cables already on Atlantis before launching Jan. 19. The launch has been rescheduled no earlier than Feb. 6 KSC01padig018

description

Summary

KENNEDY SPACE CENTER, FLA. -- Space Shuttle Atlantis , with its orange external tank and white solid rocket boosters attached, is viewed from the 235-foot level of the Fixed Service Structure on Launch Pad 39A. Atlantis is rolling back to the Vehicle Assembly Building so that workers can conduct inspections, make continuity checks and conduct X-ray analysis on the 36 SRB cables located inside each booster’s system tunnel (seen at left on the outside of the SRB). An extensive evaluation of NASA’s SRB cable inventory revealed conductor damage in four (of about 200) cables on the shelf. Shuttle managers decided to prove the integrity of the system tunnel cables already on Atlantis before launching Jan. 19. The launch has been rescheduled no earlier than Feb. 6

The Space Shuttle program was the United States government's manned launch vehicle program from 1981 to 2011, administered by NASA and officially beginning in 1972. The Space Shuttle system—composed of an orbiter launched with two reusable solid rocket boosters and a disposable external fuel tank— carried up to eight astronauts and up to 50,000 lb (23,000 kg) of payload into low Earth orbit (LEO). When its mission was complete, the orbiter would re-enter the Earth's atmosphere and lands as a glider. Although the concept had been explored since the late 1960s, the program formally commenced in 1972 and was the focus of NASA's manned operations after the final Apollo and Skylab flights in the mid-1970s. It started with the launch of the first shuttle Columbia on April 12, 1981, on STS-1. and finished with its last mission, STS-135 flown by Atlantis, in July 2011.

Nothing Found.

label_outline

Tags

kennedy space center atlantis tank rocket boosters rocket boosters level service structure launch pad vehicle workers inspections conduct inspections continuity checks continuity checks x ray analysis conduct x ray analysis srb cables srb cables booster system tunnel booster system tunnel nasa srb cable inventory conductor damage conductor damage shuttle managers integrity system tunnel cables padig space shuttle high resolution nasa
date_range

Date

19/01/2001
collections

in collections

Space Shuttle Program

place

Location

create

Source

NASA
link

Link

https://images.nasa.gov/
copyright

Copyright info

Public Domain Dedication (CC0)

label_outline Explore Conduct X Ray Analysis, Booster System Tunnel, Conduct Inspections

Trevor Lawrence, a quarterback from Cartersville High

At launch pad 36-A, Cape Canaveral Air Force Station, workers check over the second stage of an Atlas II/Centaur rocket before it is lifted up the gantry (behind it) for mating with the first stage. Atlas II is designed to launch payloads into low earth orbit, geosynchronous transfer orbit or geosynchronous orbit. The rocket is the launch vehicle for the GOES-L satellite, part of the NOAA National Weather Service system in weather imagery and atmospheric sounding information. The primary objective of the GOES-L is to provide a full capability satellite in an on-orbit storage condition, to assure NOAA continuity in services from a two-satellite constellation. Launch services are being provided by the 45th Space Wing KSC00pp0424

Soldiers assigned to 2nd Battalion, 17th Field Artillery

Drum Major Bryce Buckland from Robinson High School

Staff Sgt. Shawna Sims, a 92nd Air Refueling Squadron

US Marine Corps (USMC) personnel assigned to the 3rd Battalion, 12th Marine Regiment perform per-fire inspections on M198 155mm Towed Howitzers during a live-fire training exercise at Jijudai training range Kyushy, Japan

U.S. Air Force Airman 1st Class Nathaniel West, 18th

Workers prepare to move the shipping container with the Cassini orbiter inside the Payload Hazardous Servicing Facility (PHSF) for prelaunch processing, testing and integration. The /1997/66-97.htm">orbiter arrived</a> at KSC’s Shuttle Landing Facility in a U.S. Air Force C-17 air cargo plane from Edwards Air Force Base, California. The orbiter and the Huygens probe already being processed at KSC are the two primary components of the Cassini spacecraft, which will be launched on a Titan IVB/Centaur expendable launch vehicle from Cape Canaveral Air Station. Cassini will explore Saturn, its rings and moons for four years. The Huygens probe, designed and developed for the European Space Agency (ESA), will be deployed from the orbiter to study the clouds, atmosphere and surface of Saturn’s largest moon, Titan. The orbiter was designed and assembled at NASA’s Jet Propulsion Laboratory in California. Following postflight inspections, integration of the 12 science instruments not already installed on the orbiter will be completed. Then, the parabolic high-gain antenna and the propulsion module will be mated to the orbiter, followed by the Huygens probe, which will complete spacecraft integration. The Cassini mission is targeted for an Oct. 6 launch to begin its 6.7-year journey to the Saturnian system. Arrival at the planet is expected to occur around July 1, 2004 KSC-97pc682

An F-22 Raptor from the 1st Fighter Wing at Joint Base

The Fairchild air traffic control tower stands watch

Musician 2nd Class Anthony Smouse, assigned to the U.S. 7th Fleet Ceremonial Band, takes direction from the conductor during a rehearsal aboard the amphibious command ship USS Blue Ridge (LCC 19).

VANDENBERG AFB, Calif. – Technicians prepare to raise the first stage booster of a United Launch Alliance Atlas V onto the launch pad at Space Launch Complex-3E at Vandenberg Air Force Base, Calif. in preparation for the launch of the Landsat Data Continuity Mission. The Landsat Data Continuity Mission LDCM is the future of Landsat satellites. It will continue to obtain valuable data and imagery to be used in agriculture, education, business, science, and government. The Landsat Program provides repetitive acquisition of high resolution multispectral data of the Earth's surface on a global basis. The data from the Landsat spacecraft constitute the longest record of the Earth's continental surfaces as seen from space. It is a record unmatched in quality, detail, coverage, and value. Launch is planned for Feb. 2013. Photo credit: NASA/Roy Allison KSC-2012-5937

Topics

kennedy space center atlantis tank rocket boosters rocket boosters level service structure launch pad vehicle workers inspections conduct inspections continuity checks continuity checks x ray analysis conduct x ray analysis srb cables srb cables booster system tunnel booster system tunnel nasa srb cable inventory conductor damage conductor damage shuttle managers integrity system tunnel cables padig space shuttle high resolution nasa