visibility Similar

code Related

CAPE CANAVERAL, Fla. – A technician works with a set of tanks prior to their installation into the Orion spacecraft being assembled by Lockheed Martin inside the Operations & Checkout Building's high bay at NASA's Kennedy Space Center. The spacecraft is being prepared for a test flight next year that calls for the Orion to fly without a crew on a mission to evaluate its systems and heat shield. The spacecraft is designed to carry astronauts into deep space and back safely. Photo credit: NASA/Charisse Nahsser KSC-2013-3462

CAPE CANAVERAL, Fla. – Technicians work with the Orion spacecraft being assembled by Lockheed Martin inside the Operations & Checkout Building's high bay at NASA's Kennedy Space Center. The spacecraft is being prepared for a test flight next year that calls for the Orion to fly without a crew on a mission to evaluate its systems and heat shield. The spacecraft is designed to carry astronauts into deep space and back safely. Photo credit: NASA/Charisse Nahsser KSC-2013-3460

CAPE CANAVERAL, Fla. – A set of maneuvering thrusters is seen prior to their installation into the Orion spacecraft being assembled by Lockheed Martin inside the Operations & Checkout Building's high bay at NASA's Kennedy Space Center. The spacecraft is being prepared for a test flight next year that calls for the Orion to fly without a crew on a mission to evaluate its systems and heat shield. The spacecraft is designed to carry astronauts into deep space and back safely. Photo credit: NASA/Charisse Nahsser KSC-2013-3461

CAPE CANAVERAL, Fla. – Technicians lower a special fixture around an Orion spacecraft inside the high bay of the Operations & Checkout Building at NASA's Kennedy Space Center in Florida. The fixture is designed to enable precise pre-launch processing of the Orion spacecraft. An Orion capsule is being prepared to make a flight test in 2014 on a mission that will not carry any astronauts. Photo by Tim Jacobs KSC-2012-6448

CAPE CANAVERAL, Fla. – Technicians prepare to fit a special fixture around an Orion capsule inside the high bay of the Operations & Checkout Building at NASA's Kennedy Space Center in Florida. The fixture is designed to enable precise pre-launch processing of the Orion spacecraft. An Orion capsule is being prepared to make a flight test in 2014 on a mission that will not carry any astronauts. Photo by Tim Jacobs KSC-2012-6431

CAPE CANAVERAL, Fla. – Technicians prepare to fit a special fixture around an Orion capsule inside the high bay of the Operations & Checkout Building at NASA's Kennedy Space Center in Florida. The fixture is designed to enable precise pre-launch processing of the Orion spacecraft. An Orion capsule is being prepared to make a flight test in 2014 on a mission that will not carry any astronauts. Photo by Tim Jacobs KSC-2012-6432

CAPE CANAVERAL, Fla. – Technicians prepare to fit a special fixture around an Orion capsule inside the high bay of the Operations & Checkout Building at NASA's Kennedy Space Center in Florida. The fixture is designed to enable precise pre-launch processing of the Orion spacecraft. An Orion capsule is being prepared to make a flight test in 2014 on a mission that will not carry any astronauts. Photo by Tim Jacobs KSC-2012-6436

CAPE CANAVERAL, Fla. – Technicians prepare to fit a special fixture around an Orion capsule inside the high bay of the Operations & Checkout Building at NASA's Kennedy Space Center in Florida. The fixture is designed to enable precise pre-launch processing of the Orion spacecraft. An Orion capsule is being prepared to make a flight test in 2014 on a mission that will not carry any astronauts. Photo by Tim Jacobs KSC-2012-6442

CAPE CANAVERAL, Fla. – Technicians prepare to fit a special fixture around an Orion capsule inside the high bay of the Operations & Checkout Building at NASA's Kennedy Space Center in Florida. The fixture is designed to enable precise pre-launch processing of the Orion spacecraft. An Orion capsule is being prepared to make a flight test in 2014 on a mission that will not carry any astronauts. Photo by Tim Jacobs KSC-2012-6435

CAPE CANAVERAL, Fla. – Technicians work with a set of maneuvering thrusters prior to their installation into the Orion spacecraft being assembled by Lockheed Martin inside the Operations & Checkout Building's high bay at NASA's Kennedy Space Center. The spacecraft is being prepared for a test flight next year that calls for the Orion to fly without a crew on a mission to evaluate its systems and heat shield. The spacecraft is designed to carry astronauts into deep space and back safely. Photo credit: NASA/Charisse Nahsser KSC-2013-3459

description

Summary

CAPE CANAVERAL, Fla. – Technicians work with a set of maneuvering thrusters prior to their installation into the Orion spacecraft being assembled by Lockheed Martin inside the Operations & Checkout Building's high bay at NASA's Kennedy Space Center. The spacecraft is being prepared for a test flight next year that calls for the Orion to fly without a crew on a mission to evaluate its systems and heat shield. The spacecraft is designed to carry astronauts into deep space and back safely. Photo credit: NASA/Charisse Nahsser

Nothing Found.

label_outline

Tags

kennedy space center cape canaveral technicians technicians work thrusters installation orion spacecraft orion spacecraft martin checkout bay flight test flight year crew heat shield heat shield astronauts charisse nahsser high resolution nasa florida
date_range

Date

21/08/2013
place

Location

Kennedy Space Center / Cape Canaveral Air Force Station Fire Station 2 ,  28.52650, -80.67093
create

Source

NASA
link

Link

https://images.nasa.gov/
copyright

Copyright info

Public Domain Dedication (CC0)

label_outline Explore Nahsser, Technicians Work, Thrusters

CAPE CANAVERAL, Fla. -- Technicians in the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, are jacking crawler-transporter 2, or CT-2, four feet off the floor to facilitate removal of the roller bearing assemblies. After inspections, new assemblies will be installed. The Ground Systems Development and Operations Program office at Kennedy is overseeing the upgrades to CT-2 so that it can carry NASA’s Space Launch System heavy-lift rocket and new Orion spacecraft to the launch pad. For more than 45 years the crawler-transporters were used to transport the mobile launcher platform and the Apollo-Saturn V rockets and, later, space shuttles to Launch Pads 39A and B. Photo credit: NASA/Charisse Nahser KSC-2013-1930

Marshall Space Flight Center, Saturn Propulsion & Structural Test Facility, East Test Area, Huntsville, Madison County, AL

Technicians work in the Fleet Satellite Communications satellite in the TRW Laboratory

Marshall Space Flight Center, Saturn V Dynamic Test Facility, East Test Area, Huntsville, Madison County, AL

KENNEDY SPACE CENTER, FLA. - In the mobile service tower on Launch Complex 37 at Cape Canaveral Air Force Station in Florida, workers check the attach points on the GOES-N spacecraft and Boeing Delta IV rocket. GOES-N is the latest in a series of Geostationary Operational Environmental Satellites for NOAA and NASA, providing continuous monitoring necessary for intensive data analysis. GOES-N is scheduled to be launched May 18 in an hour-long window between 6:14 and 7:14 p.m. EDT. Photo credit: NASA/Charisse Nahser KSC-06pd0766

US Air Force (USAF) AIRMAN First Class (A1C) Adam Hooke, Hydraulic Journeyman, Accessories flight, 31st Maintenance Squadron (MXS), sets up the AvTec 843 Hydraulic Test Stand. This operation checks hydraulic equipment on the F-16 Fighting Falcon to include; Brakes, shocks, flight controls - such as leading edge slats. The test stand insures the equipment generates and handles the proper hydraulic pressure

Technicians work on the second production model B-1B aircraft in a hangar at the Rockwell International facility

CAPE CANAVERAL, Fla. - Crews in Orbiter Processing Facility-2 at NASA's Kennedy Space Center in Florida remove space shuttle Discovery's right-hand inner heat shield from engine No. 1. The removal is part of Discovery's transition and retirement processing. Work performed on Discovery is expected to help rocket designers build next-generation spacecraft and prepare the shuttle for future public display.Photo credit: NASA/Jack Pfaller KSC-2011-2396

Researchers from the U.S. Naval Research Laboratory and Griffon Aerospace inspect the SeaHunter unmanned aerial vehicle following a test flight to measure the capabilities of light detection and ranging (LIDAR) and hyperspectral technologies.

AS16-118-18882 - Apollo 16 - Apollo 16 Mission image - The SIVB (Third stage [IVB] of Saturn Launch vehicle) stage after Lunar Module (LM) ejection. Lunar Module (LM) thrusters.

10 FOOT BELL JAR INSIDE VIEW OUTSIDE VIEW TWO ION THRUSTERS MOUNTED INSIDE ROW OF EQUIPMENT ALONG SIDE

Marshall Space Flight Center, Saturn V Dynamic Test Facility, East Test Area, Huntsville, Madison County, AL

Topics

kennedy space center cape canaveral technicians technicians work thrusters installation orion spacecraft orion spacecraft martin checkout bay flight test flight year crew heat shield heat shield astronauts charisse nahsser high resolution nasa florida