visibility Similar

CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-2 at NASA's Kennedy Space Center in Florida, workers remove shuttle Discovery's right-hand orbital maneuvering system, or OMS, pod. The removal is part of Discovery's transition and retirement processing. Work performed on Discovery is expected to help rocket designers build next-generation spacecraft and prepare the shuttle for future public display. Photo credit: NASA/Troy Cryder KSC-2011-2994

STS-124 - EOM - Public domain NASA photogrpaph

S06-08-358 - STS-006 - Overall views of PLB and OMS / RCS engine thrusting

STS109-301-004 - STS-109 - Empty Columbia payload bay

CAPE CANAVERAL, Fla. -- Inside Orbiter Processing Facility-1 at NASA’s Kennedy Space Center in Florida, technicians monitor the progress as the tail cone for space shuttle Discovery’s three replica shuttle main engines (RSMEs) arrives. The tail cone will be installed around Discovery’s RSMEs for protection. The work is part of the Space Shuttle Program’s transition and retirement processing of shuttle Discovery. Discovery is being prepared for display at the Smithsonian’s National Air and Space Museum, Steven F. Udvar-Hazy Center in Chantilly, Va. For more information, visit http://www.nasa.gov/shuttle. Photo credit: NASA/Jim Grossmann KSC-2012-1033

The wheels on Atlantis are lowered while the orbiter is suspended by an overhead crane in the mate/demate device at KSC’s Shuttle Landing Facility. It was removed from the back of the Shuttle Carrier Aircraft in the background. Atlantis just returned from California atop the SCA after its Feb. 19 landing at Edwards Air Force Base concluding mission STS-98. The ferry flight began March 1; unfavorable weather conditions kept it on the ground at Altus AFB, Okla., until it could return to Florida. Atlantis will be transported to the Orbiter Processing Facility to prepare it for mission STS-104, the 10th construction flight to the International Space Station, scheduled to launch June 8 KSC01pp0511

code Related

CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians are installing replica shuttle main engine 2, or RSME 2, on space shuttle Endeavour. The orbiter is surrounded by work platforms allowing access to all areas of the spacecraft. The work is part of Transition and Retirement of the remaining space shuttles, Endeavour and Atlantis. Endeavour is being prepared for public display at the California Science Center in Los Angeles. Its ferry flight to California is targeted for mid-September. Endeavour was the last space shuttle added to NASA’s orbiter fleet. Over the course of its 19-year career, Endeavour spent 299 days in space during 25 missions. For more information, visit http://www.nasa.gov/shuttle. Photo credit: NASA/David Lee KSC-2012-3830

CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians on a Hyster forklift move replica shuttle main engine 2, or RSME 2, closer for installation on space shuttle Endeavour. The orbiter is surrounded by work platforms allowing access to all areas of the spacecraft. The work is part of Transition and Retirement of the remaining space shuttles, Endeavour and Atlantis. Endeavour is being prepared for public display at the California Science Center in Los Angeles. Its ferry flight to California is targeted for mid-September. Endeavour was the last space shuttle added to NASA’s orbiter fleet. Over the course of its 19-year career, Endeavour spent 299 days in space during 25 missions. For more information, visit http://www.nasa.gov/shuttle. Photo credit: NASA/David Lee KSC-2012-3819

CAPE CANAVERAL, Fla. - In this wide-angle view inside Orbiter Processing Facility Bay 2 at NASA’s Kennedy Space Center in Florida, replica shuttle main engines 3 RSME has been installed on the space shuttle Endeavour. The orbiter is surrounded by work platforms allowing access to all areas of the spacecraft. The work is part of Transition and Retirement of the remaining space shuttles, Endeavour and Atlantis. Endeavour is being prepared for public display at the California Science Center in Los Angeles. Its ferry flight to California is targeted for mid-September. Endeavour was the last space shuttle added to NASA’s orbiter fleet. Over the course of its 19-year career, Endeavour spent 299 days in space during 25 missions. For more information, visit http://www.nasa.gov/transition Photo credit: NASA/ Dimitri Gerondidakis KSC-2012-3785

CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians on a Hyster forklift guide replica shuttle main engine 2, or RSME 2, closer for installation on space shuttle Endeavour. The orbiter is surrounded by work platforms allowing access to all areas of the spacecraft. The work is part of Transition and Retirement of the remaining space shuttles, Endeavour and Atlantis. Endeavour is being prepared for public display at the California Science Center in Los Angeles. Its ferry flight to California is targeted for mid-September. Endeavour was the last space shuttle added to NASA’s orbiter fleet. Over the course of its 19-year career, Endeavour spent 299 days in space during 25 missions. For more information, visit http://www.nasa.gov/shuttle. Photo credit: NASA/David Lee KSC-2012-3829

CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians gather together after replica shuttle main engine 2, or RSME 2, was installed on space shuttle Endeavour. The orbiter is surrounded by work platforms allowing access to all areas of the spacecraft. The work is part of Transition and Retirement of the remaining space shuttles, Endeavour and Atlantis. Endeavour is being prepared for public display at the California Science Center in Los Angeles. Its ferry flight to California is targeted for mid-September. Endeavour was the last space shuttle added to NASA’s orbiter fleet. Over the course of its 19-year career, Endeavour spent 299 days in space during 25 missions. For more information, visit http://www.nasa.gov/shuttle. Photo credit: NASA/David Lee KSC-2012-3832

CAPE CANAVERAL, Fla. - In Orbiter Processing Facility Bay 2 at NASA’s Kennedy Space Center in Florida, replica shuttle main engine RSME number 1 has been installed on space shuttle Endeavour. The orbiter is surrounded by work platforms allowing access to all areas of the spacecraft. The work is part of Transition and Retirement of the remaining space shuttles, Endeavour and Atlantis. Endeavour is being prepared for public display at the California Science Center in Los Angeles. Its ferry flight to California is targeted for mid-September. Endeavour was the last space shuttle added to NASA’s orbiter fleet. Over the course of its 19-year career, Endeavour spent 299 days in space during 25 missions. For more information, visit http://www.nasa.gov/transition Photo credit: NASA/Charisse Nahser KSC-2012-3742

CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians on a Hyster forklift move replica shuttle main engine 2, or RSME 2, closer for installation on space shuttle Endeavour. The orbiter is surrounded by work platforms allowing access to all areas of the spacecraft. The work is part of Transition and Retirement of the remaining space shuttles, Endeavour and Atlantis. Endeavour is being prepared for public display at the California Science Center in Los Angeles. Its ferry flight to California is targeted for mid-September. Endeavour was the last space shuttle added to NASA’s orbiter fleet. Over the course of its 19-year career, Endeavour spent 299 days in space during 25 missions. For more information, visit http://www.nasa.gov/shuttle. Photo credit: NASA/David Lee KSC-2012-3822

CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians on a Hyster forklift guide replica shuttle main engine 2, or RSME 2, closer for installation on space shuttle Endeavour. The orbiter is surrounded by work platforms allowing access to all areas of the spacecraft. The work is part of Transition and Retirement of the remaining space shuttles, Endeavour and Atlantis. Endeavour is being prepared for public display at the California Science Center in Los Angeles. Its ferry flight to California is targeted for mid-September. Endeavour was the last space shuttle added to NASA’s orbiter fleet. Over the course of its 19-year career, Endeavour spent 299 days in space during 25 missions. For more information, visit http://www.nasa.gov/shuttle. Photo credit: NASA/David Lee KSC-2012-3826

CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians monitor the progress as a Hyster forklift moves replica shuttle main engine 2, or RSME 2, closer for installation on space shuttle Endeavour. The orbiter is surrounded by work platforms allowing access to all areas of the spacecraft. The work is part of Transition and Retirement of the remaining space shuttles, Endeavour and Atlantis. Endeavour is being prepared for public display at the California Science Center in Los Angeles. Its ferry flight to California is targeted for mid-September. Endeavour was the last space shuttle added to NASA’s orbiter fleet. Over the course of its 19-year career, Endeavour spent 299 days in space during 25 missions. For more information, visit http://www.nasa.gov/shuttle. Photo credit: NASA/David Lee KSC-2012-3823

CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, all three replica shuttle main engines, or RSMEs, including RSME 2, have been installed on space shuttle Endeavour. The orbiter is surrounded by work platforms allowing access to all areas of the spacecraft. The work is part of Transition and Retirement of the remaining space shuttles, Endeavour and Atlantis. Endeavour is being prepared for public display at the California Science Center in Los Angeles. Its ferry flight to California is targeted for mid-September. Endeavour was the last space shuttle added to NASA’s orbiter fleet. Over the course of its 19-year career, Endeavour spent 299 days in space during 25 missions. For more information, visit http://www.nasa.gov/shuttle. Photo credit: NASA/David Lee KSC-2012-3831

description

Summary

CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, all three replica shuttle main engines, or RSMEs, including RSME 2, have been installed on space shuttle Endeavour. The orbiter is surrounded by work platforms allowing access to all areas of the spacecraft. The work is part of Transition and Retirement of the remaining space shuttles, Endeavour and Atlantis. Endeavour is being prepared for public display at the California Science Center in Los Angeles. Its ferry flight to California is targeted for mid-September. Endeavour was the last space shuttle added to NASA’s orbiter fleet. Over the course of its 19-year career, Endeavour spent 299 days in space during 25 missions. For more information, visit http://www.nasa.gov/shuttle. Photo credit: NASA/David Lee

The Space Shuttle program was the United States government's manned launch vehicle program from 1981 to 2011, administered by NASA and officially beginning in 1972. The Space Shuttle system—composed of an orbiter launched with two reusable solid rocket boosters and a disposable external fuel tank— carried up to eight astronauts and up to 50,000 lb (23,000 kg) of payload into low Earth orbit (LEO). When its mission was complete, the orbiter would re-enter the Earth's atmosphere and lands as a glider. Although the concept had been explored since the late 1960s, the program formally commenced in 1972 and was the focus of NASA's manned operations after the final Apollo and Skylab flights in the mid-1970s. It started with the launch of the first shuttle Columbia on April 12, 1981, on STS-1. and finished with its last mission, STS-135 flown by Atlantis, in July 2011.

Nothing Found.

label_outline

Tags

endeavour ov 105 t and r rsme kennedy space center cape canaveral orbiter nasa kennedy space center replica three replica shuttle engines rsmes endeavour space shuttle endeavour platforms work platforms access areas spacecraft transition retirement space shuttles atlantis california science california science center los angeles ferry flight ferry flight mid september fleet nasa orbiter fleet course career david lee space shuttle high resolution nasa
date_range

Date

13/07/2012
collections

in collections

Space Shuttle Program

place

Location

create

Source

NASA
link

Link

https://images.nasa.gov/
copyright

Copyright info

Public Domain Dedication (CC0)

label_outline Explore Endeavour Ov 105 T And R Rsme, Rsmes, Three Replica Shuttle

A replica of a Japanese Val Type 99 bomber aircraft flies during a re-enactment of World War II battles. The event is being staged by the Confederate Air Force, a private historical organization that restores and preserves World War II-era aircraft. The re-enactment is part of the Air Force Association's Gathering of Eagles '86, an international aerospace event celebrating the anniversaries of the Strategic Air Command, Tactical Air Command and the independent Air Force Association

CAPE CANAVERAL, Fla. -- Seen through the open bay door of the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida, space shuttle Discovery is being prepared for its move to Orbiter Processing Facility-1 (OPF-1). Discovery is switching places with shuttle Endeavour which has been undergoing decommissioning activities in OPF-1. Both shuttles will stop briefly outside OPF-3 for a "nose-to-nose" photo opportunity. Discovery then will be rolled into OPF-1 and Endeavour into the VAB. In OPF-1, Discovery will undergo further preparations for public display at the Smithsonian's National Air and Space Museum Steven F. Udvar-Hazy Center in Virginia. Endeavour will be stored in the VAB until October when it will be moved into OPF-2 for further work to get it ready for public display at the California Science Center in Los Angeles. For more information, visit http://www.nasa.gov/shuttle. Photo credit: NASA/Dimitri Gerondidakis KSC-2011-6415

CAPE CANAVERAL, Fla. – Inside Orbiter Processing Facility-2 at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians inspect space shuttle Endeavour’s payload bay doors after they were closed for the final time. The work is part of Transition and Retirement of the remaining space shuttles, Endeavour and Atlantis. Endeavour is being prepared for public display at the California Science Center in Los Angeles. Its ferry flight to California is targeted for mid-September. Endeavour was the last space shuttle added to NASA’s orbiter fleet. Over the course of its 19-year career, Endeavour spent 299 days in space during 25 missions. For more information, visit http://www.nasa.gov/shuttle. Photo credit: NASA/Kim Shiflett KSC-2012-3429

An air-to-air right front view of a replica of a Japanese World War II Val Type 99 bomber during an air show held for the Air Force Association's Gathering of Eagles,"a convention commemorating spectacular achievements in the free world's aerospace development

KENNEDY SPACE CENTER, FLA. - The Space Shuttle orbiter Atlantis is turned into position outside the Orbiter Processing Facility (OPF) for its tow to the Vehicle Assembly Building (VAB). The move will allow work to be performed in the OPF that can only be accomplished while the bay is empty. Work scheduled in the processing facility includes annual validation of the bay's cranes, work platforms, lifting mechanisms, and jack stands. Atlantis will remain in the VAB for about 10 days, then return to the OPF as work resumes to prepare it for launch in September 2004 on the first return-to-flight mission, STS-114.

CAPE CANAVERAL, Fla. – Inside the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, United Space Alliance technicians use a crane to pick up the right side tail cone for buildup on space shuttle Endeavour. The tail cone protects space shuttle main engines during ferry flights on top of the Shuttle Carrier Aircraft, or SCA. The work is part of Transition and Retirement of the remaining space shuttles, Endeavour and Atlantis. Endeavour is being prepared for public display at the California Science Center in Los Angeles. Its ferry flight to California is targeted for mid-September. Endeavour was the last space shuttle added to NASA’s orbiter fleet. Over the course of its 19-year career, Endeavour spent 299 days in space during 25 missions. For more information, visit http://www.nasa.gov/shuttle. Photo credit: NASA/Kim Shiflett KSC-2012-2835

A replica of a Japanese Kate torpedo plane, made from an American AT-6 Texan aircraft, makes a bombing run during a re-enactment of World War II battles. The event is being staged by the Confederate Air Force, a private historical organization that restores and preserves World War II-era aircraft. The re-enactment is part of the Air Force Association's Gathering of Eagles '86, an international aerospace event celebrating the anniversaries of the Strategic Air Command, Tactical Air Command and the independent Air Force Association

AIDS TO NAVIGATION - U.S. Coast guard photo

jsc2017e043851 (April 14, 2017) --- At the Baikonur Cosmodrome Museum in Kazakhstan, the Expedition 51 prime and backup crewmembers are shown a replica of a Soyuz seat and passenger April 14 during a traditional tour of the facility. From left to right are prime crewmember Jack Fischer of NASA, backup crewmember Sergey Ryazanskiy of the Russian Federal Space Agency (Roscosmos), backup crewmember Randy Bresnik of NASA and prime crewmember Fyodor Yurchikhin of Roscosmos. Fischer and Yurchikhin will launch April 20 on the Soyuz MS-04 spacecraft for a four and a half month mission on the International Space Station. Credit: NASA/Victor Zelentsov jsc2017e043851

Pilot John Warlick and copilot Bill Sloan prepare for take-off aboard their replica of the Wright"B"Flyer aircraft during the"Festival of Flight,"an Air Force 40th anniversary celebration

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility Bay 2 at NASA’s Kennedy Space Center in Florida, a United Space Alliance technician monitors the nose landing gear during weight and center of gravity checks on the space shuttle Endeavour. The work is part of Transition and Retirement of the remaining space shuttles, Endeavour and Atlantis. Endeavour is being prepared for public display at the California Science Center in Los Angeles. Its ferry flight to California is targeted for mid-September. Endeavour was the last space shuttle added to NASA’s orbiter fleet. Over the course of its 19-year career, Endeavour spent 299 days in space during 25 missions. For more information, visit http://www.nasa.gov/transition Photo credit: NASA/ Jim Grossmann KSC-2012-4426

A replica of an F-4E Corsair aircraft flies alongside

Topics

endeavour ov 105 t and r rsme kennedy space center cape canaveral orbiter nasa kennedy space center replica three replica shuttle engines rsmes endeavour space shuttle endeavour platforms work platforms access areas spacecraft transition retirement space shuttles atlantis california science california science center los angeles ferry flight ferry flight mid september fleet nasa orbiter fleet course career david lee space shuttle high resolution nasa