visibility Similar

KENNEDY SPACE CENTER, FLA. - Inside the Vehicle Assembly Building at NASA's Kennedy Space Center, a worker watches external tank number 119 as it is being lifted from the checkout cell. The tank will be placed horizontally on the transporter in the transfer aisle. Once in the transfer aisle, technicians will reapply the thermal protection system foam that was removed in order to replace the tank's four liquid hydrogen engine cutoff sensors. The tank is being prepared to launch Space Shuttle Discovery on mission STS-121 in July. Photo credit: NASA/Cory Huston KSC-06pd0599

STS061-94-062 - STS-061 - Astronauts Akers and Thornton during installation of COSTAR on HST

EGRESS - ASTRONAUT JOHN W. YOUNG - TRAINING

S39-27-010 - STS-039 - RCS jets fire during on orbit maneuver

Delta II JPSS-1 Fairing Bi-Sector Halves Hoisted to MST

180515-N-OY799-0613 WATERS SOUTH OF JAPAN (May 15,

KENNEDY SPACE CENTER, FLA. -- Adm. Craig E. Steidle (center), NASA’s associate administrator, Office of Exploration Systems, tours the Orbiter Processing Facility on a visit to KSC. At left is Conrad Nagel, chief of the Shuttle Project Office. They are standing under the left wing and wheel well of the orbiter Discovery. The Office of Exploration Systems was established to set priorities and direct the identification, development and validation of exploration systems and related technologies to support the future space vision for America. Steidle’s visit included a tour of KSC to review the facilities and capabilities to be used to support the vision. KSC-04pd1142

STS103-710-002 - STS-103 - 2nd EVA - 486 replacement in HST

code Related

CAPE CANAVERAL, Fla. – Technicians monitor a Pratt and Whitney Rocketdyne space shuttle main engine, or SSME, as a crane lifts it off its base inside the SSME Processing Facility, the engine shop at NASA’s Kennedy Space Center in Florida. Operations are under way to rotate the engine into a horizontal position on a portable workstand. The engine is one of the last SSMEs remaining at Kennedy and is being prepared for shipment to NASA's Stennis Space Center in Mississippi. The first two groups of engines were shipped from Kennedy to Stennis in November 2011 and January 2012 the remaining engines are scheduled to depart on April 9. Altogether, 15 shuttle-era engines will be stored at Stennis for reuse on NASA’s Space Launch System heavy-lift rocket, under development. Photo credit: NASA/Tim Jacobs KSC-2012-1913

CAPE CANAVERAL, Fla. – Technicians secure a Pratt and Whitney Rocketdyne space shuttle main engine, or SSME, onto a portable workstand inside the SSME Processing Facility, the engine shop at NASA’s Kennedy Space Center in Florida. The engine was rotated into a horizontal position with the aid of an engine-handling device attached to a crane. The engine is one of the last SSMEs remaining at Kennedy and is being prepared for shipment to NASA's Stennis Space Center in Mississippi. The first two groups of engines were shipped from Kennedy to Stennis in November 2011 and January 2012 the remaining engines are scheduled to depart on April 9. Altogether, 15 shuttle-era engines will be stored at Stennis for reuse on NASA’s Space Launch System heavy-lift rocket, under development. Photo credit: NASA/Tim Jacobs KSC-2012-1919

CAPE CANAVERAL, Fla. – Technicians move a portable workstand under a Pratt and Whitney Rocketdyne space shuttle main engine, or SSME, inside the SSME Processing Facility, the engine shop at NASA’s Kennedy Space Center in Florida. The engine is being rotated into a horizontal position with the aid of an engine-handling device attached to a crane. The engine is one of the last SSMEs remaining at Kennedy and is being prepared for shipment to NASA's Stennis Space Center in Mississippi. The first two groups of engines were shipped from Kennedy to Stennis in November 2011 and January 2012 the remaining engines are scheduled to depart on April 9. Altogether, 15 shuttle-era engines will be stored at Stennis for reuse on NASA’s Space Launch System heavy-lift rocket, under development. Photo credit: NASA/Tim Jacobs KSC-2012-1917

CAPE CANAVERAL, Fla. – Technicians lower a Pratt and Whitney Rocketdyne space shuttle main engine, or SSME, onto a portable workstand inside the SSME Processing Facility, the engine shop at NASA’s Kennedy Space Center in Florida. The engine was rotated into a horizontal position with the aid of an engine-handling device attached to a crane. The engine is one of the last SSMEs remaining at Kennedy and is being prepared for shipment to NASA's Stennis Space Center in Mississippi. The first two groups of engines were shipped from Kennedy to Stennis in November 2011 and January 2012 the remaining engines are scheduled to depart on April 9. Altogether, 15 shuttle-era engines will be stored at Stennis for reuse on NASA’s Space Launch System heavy-lift rocket, under development. Photo credit: NASA/Tim Jacobs KSC-2012-1918

CAPE CANAVERAL, Fla. – Technicians move the work platforms away from a Pratt and Whitney Rocketdyne space shuttle main engine, or SSME, hanging above the floor inside the SSME Processing Facility, the engine shop at NASA’s Kennedy Space Center in Florida. Operations are under way to rotate the engine into a horizontal position on a portable workstand. The engine is one of the last SSMEs remaining at Kennedy and is being prepared for shipment to NASA's Stennis Space Center in Mississippi. The first two groups of engines were shipped from Kennedy to Stennis in November 2011 and January 2012 the remaining engines are scheduled to depart on April 9. Altogether, 15 shuttle-era engines will be stored at Stennis for reuse on NASA’s Space Launch System heavy-lift rocket, under development. Photo credit: NASA/Tim Jacobs KSC-2012-1914

CAPE CANAVERAL, Fla. – Technicians release a crane from an engine-handling device and the Pratt and Whitney Rocketdyne space shuttle main engine, or SSME, that it rotated into a horizontal position inside the SSME Processing Facility, the engine shop at NASA’s Kennedy Space Center in Florida. The engine is secured on a portable workstand before being transferred into a transportation canister. The engine is one of the last SSMEs remaining at Kennedy and is being prepared for shipment to NASA's Stennis Space Center in Mississippi. The first two groups of engines were shipped from Kennedy to Stennis in November 2011 and January 2012 the remaining engines are scheduled to depart on April 9. Altogether, 15 shuttle-era engines will be stored at Stennis for reuse on NASA’s Space Launch System heavy-lift rocket, under development. Photo credit: NASA/Tim Jacobs KSC-2012-1921

CAPE CANAVERAL, Fla. – A Pratt and Whitney Rocketdyne space shuttle main engine, or SSME, is rotated into a horizontal position with the aid of an engine-handling device attached to a crane inside the SSME Processing Facility, the engine shop at NASA’s Kennedy Space Center in Florida. The engine will be placed in a horizontal position on a portable workstand. The engine is one of the last SSMEs remaining at Kennedy and is being prepared for shipment to NASA's Stennis Space Center in Mississippi. The first two groups of engines were shipped from Kennedy to Stennis in November 2011 and January 2012 the remaining engines are scheduled to depart on April 9. Altogether, 15 shuttle-era engines will be stored at Stennis for reuse on NASA’s Space Launch System heavy-lift rocket, under development. Photo credit: NASA/Tim Jacobs KSC-2012-1916

CAPE CANAVERAL, Fla. – Preparations are under way for the crane to release an engine-handling device used to rotate a Pratt and Whitney Rocketdyne space shuttle main engine, or SSME, into a horizontal position inside the SSME Processing Facility, the engine shop at NASA’s Kennedy Space Center in Florida. The engine is secured on a portable workstand before being transferred into a transportation canister. The engine is one of the last SSMEs remaining at Kennedy and is being prepared for shipment to NASA's Stennis Space Center in Mississippi. The first two groups of engines were shipped from Kennedy to Stennis in November 2011 and January 2012 the remaining engines are scheduled to depart on April 9. Altogether, 15 shuttle-era engines will be stored at Stennis for reuse on NASA’s Space Launch System heavy-lift rocket, under development. Photo credit: NASA/Tim Jacobs KSC-2012-1920

CAPE CANAVERAL, Fla. – A crane moves a Pratt and Whitney Rocketdyne space shuttle main engine, or SSME, across the floor away from the work platforms inside the SSME Processing Facility, the engine shop at NASA’s Kennedy Space Center in Florida. Operations are under way to rotate the engine into a horizontal position on a portable workstand. The engine is one of the last SSMEs remaining at Kennedy and is being prepared for shipment to NASA's Stennis Space Center in Mississippi. The first two groups of engines were shipped from Kennedy to Stennis in November 2011 and January 2012 the remaining engines are scheduled to depart on April 9. Altogether, 15 shuttle-era engines will be stored at Stennis for reuse on NASA’s Space Launch System heavy-lift rocket, under development. Photo credit: NASA/Tim Jacobs KSC-2012-1915

CAPE CANAVERAL, Fla. – Technicians attach a Pratt and Whitney Rocketdyne space shuttle main engine, or SSME, to an engine-handling device inside the SSME Processing Facility, the engine shop at NASA’s Kennedy Space Center in Florida. Preparations are under way to rotate the engine into a horizontal position on a portable workstand. The engine is one of the last SSMEs remaining at Kennedy and is being prepared for shipment to NASA's Stennis Space Center in Mississippi. The first two groups of engines were shipped from Kennedy to Stennis in November 2011 and January 2012 the remaining engines are scheduled to depart on April 9. Altogether, 15 shuttle-era engines will be stored at Stennis for reuse on NASA’s Space Launch System heavy-lift rocket, under development. Photo credit: NASA/Tim Jacobs KSC-2012-1912

description

Summary

CAPE CANAVERAL, Fla. – Technicians attach a Pratt and Whitney Rocketdyne space shuttle main engine, or SSME, to an engine-handling device inside the SSME Processing Facility, the engine shop at NASA’s Kennedy Space Center in Florida. Preparations are under way to rotate the engine into a horizontal position on a portable workstand. The engine is one of the last SSMEs remaining at Kennedy and is being prepared for shipment to NASA's Stennis Space Center in Mississippi. The first two groups of engines were shipped from Kennedy to Stennis in November 2011 and January 2012 the remaining engines are scheduled to depart on April 9. Altogether, 15 shuttle-era engines will be stored at Stennis for reuse on NASA’s Space Launch System heavy-lift rocket, under development. Photo credit: NASA/Tim Jacobs

The Space Shuttle program was the United States government's manned launch vehicle program from 1981 to 2011, administered by NASA and officially beginning in 1972. The Space Shuttle system—composed of an orbiter launched with two reusable solid rocket boosters and a disposable external fuel tank— carried up to eight astronauts and up to 50,000 lb (23,000 kg) of payload into low Earth orbit (LEO). When its mission was complete, the orbiter would re-enter the Earth's atmosphere and lands as a glider. Although the concept had been explored since the late 1960s, the program formally commenced in 1972 and was the focus of NASA's manned operations after the final Apollo and Skylab flights in the mid-1970s. It started with the launch of the first shuttle Columbia on April 12, 1981, on STS-1. and finished with its last mission, STS-135 flown by Atlantis, in July 2011.

Nothing Found.

label_outline

Tags

ssme ssmepf t and r kennedy space center cape canaveral technicians pratt whitney rocketdyne whitney rocketdyne space shuttle engine ssme shop engine shop nasa kennedy space center preparations workstand shipment stennis stennis space center mississippi groups first two groups shuttle era shuttle era engines launch system heavy lift rocket nasa space launch system heavy lift rocket development tim jacobs space shuttle high resolution nasa
date_range

Date

1980 - 2020
collections

in collections

Space Shuttle Program

place

Location

create

Source

NASA
link

Link

https://images.nasa.gov/
copyright

Copyright info

Public Domain Dedication (CC0)

label_outline Explore Ssme Ssmepf T And R, Shuttle Era Engines, First Two Groups

CAPE CANAVERAL, Fla. -- Technicians in the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, are jacking crawler-transporter 2, or CT-2, four feet off the floor to facilitate removal of the roller bearing assemblies. After inspections, new assemblies will be installed. The Ground Systems Development and Operations Program office at Kennedy is overseeing the upgrades to CT-2 so that it can carry NASA’s Space Launch System heavy-lift rocket and new Orion spacecraft to the launch pad. For more than 45 years the crawler-transporters were used to transport the mobile launcher platform and the Apollo-Saturn V rockets and, later, space shuttles to Launch Pads 39A and B. Photo credit: NASA/Charisse Nahser KSC-2013-1930

114th Aircraft Maintenance Squadron engine shop Airmen

CAPE CANAVERAL, Fla. – As part of NASA's Ground Systems Development and Operations Program at the Kennedy Space Center in Florida, a large space shuttle-era work platform is being lowered and removed from high bay 3 of the Vehicle Assembly Building, or VAB. The work is part of a center-wide modernization and refurbishment initiative to accommodate NASA’s Space Launch System and a variety of other spacecraft instead of the whole building supporting one design. The Ground Systems Development and Operations Program is developing the necessary ground systems, infrastructure and operational approaches required to safely process, assemble, transport and launch the next generation of rockets and spacecraft in support of NASA’s exploration objectives. Future work also will replace the antiquated communications, power and vehicle access resources with modern efficient systems. Some of the utilities and systems slated for replacement have been used since the VAB opened in 1965. For more information, visit http://www.nasa.gov/exploration/systems/ground/index.html Photo credit: NASA/Jim Grossmann KSC-2012-5965

An Air Force C-17A airlifter, a heavy-lift air-refuelable cargo transport, on a ramp at the Long Beach Airport on the day of its maiden flight

The first CH-53K King Stallion hovers above the flight

CAPE CANAVERAL, Fla. – Space shuttle Atlantis' external fuel tank-solid rocket booster stack, atop a mobile launcher platform, presents an unusual sight – without the shuttle – as it is transferred from high bay 1 to high bay 3 in the Vehicle Assembly Building at NASA's Kennedy Space Center. It is being moved to high bay 3 to make room for the ET-SRB stack for space shuttle Endeavour. Atlantis is targeted for launch on the STS-125 mission on May 12 to service NASA's Hubble Space Telescope. Endeavour will fly on the STS-127 mission to the International Space Station and bring the final segments for Japan's Kibo laboratory. Photo credit: NASA/Tim Jacobs KSC-2009-1522

CAPE CANAVERAL, Fla. –– Inside the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, a crane is used to lift an Apollo era diesel engine away from crawler-transporter 2 CT-2). New engines will be installed later this month. Work is in progress in high bay 2 to upgrade CT-2 so that it can carry NASA’s Space Launch System heavy-lift rocket, which is under design, and new Orion spacecraft to the launch pad. The crawler-transporters were used to carry the mobile launcher platform and space shuttle to Launch Complex 39 for space shuttle launches for 30 years. Photo credit: NASA/Kim Shiflett KSC-2012-1349

STS-38 Atlantis, OV-104, lifts off from KSC LC Pad during night launch

U.S. Marines stand next to the first CH-53K King stallion

CAPE CANAVERAL, Fla. -- At Launch Pad 39B at NASA’s Kennedy Space Center in Florida, construction workers continue to remove the bricks from the flame trench walls that are below and between the left and right crawlerway tracks. The space shuttle-era flame trench deflector has been completely removed. Launch Pad 39B is being refurbished to support NASA’s Space Launch System and other launch vehicles. The Ground Systems Development and Operations, or GSDO, Program office at Kennedy is leading the center’s transformation to safely handle a variety of rockets and spacecraft. For more information about GSDO, visit: http://go.nasa.gov/groundsystems. Photo credit: NASA/Kim Shiflett KSC-2013-4177

Cape Canaveral, Fla. -- NASA Administrator Charlie Bolden sees firsthand how Kennedy Space Center is transitioning to a spaceport of the future as Kennedy's Mike Parrish explains the upcoming use of the crawler-transporter, which has carried space vehicles to the launch pad since the Apollo Program. NASA is working with U.S. industry partners to develop commercial spaceflight capabilities to low Earth orbit as the agency also is developing the Orion Multi-Purpose Crew Vehicle MPCV and the Space Launch System SLS, a crew capsule and heavy-lift rocket to provide an entirely new capability for human exploration. Designed to be flexible for launching spacecraft for crew and cargo missions, SLS and Orion MPCV will expand human presence beyond low Earth orbit and enable new missions of exploration across the solar system. Photo credit: NASA/Kim Shiflett KSC-2012-4198

CAPE CANAVERAL, Fla. –– Inside the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, technicians monitor the progress as a crane lifts an Apollo era diesel engine from crawler-transporter 2 CT-2). New engines will be installed later this month. Work is in progress in high bay 2 to upgrade CT-2 so that it can carry NASA’s Space Launch System heavy-lift rocket, which is under design, and new Orion spacecraft to the launch pad. The crawler-transporters were used to carry the mobile launcher platform and space shuttle to Launch Complex 39 for space shuttle launches for 30 years. Photo credit: NASA/Kim Shiflett KSC-2012-1347

Topics

ssme ssmepf t and r kennedy space center cape canaveral technicians pratt whitney rocketdyne whitney rocketdyne space shuttle engine ssme shop engine shop nasa kennedy space center preparations workstand shipment stennis stennis space center mississippi groups first two groups shuttle era shuttle era engines launch system heavy lift rocket nasa space launch system heavy lift rocket development tim jacobs space shuttle high resolution nasa