visibility Similar

KENNEDY SPACE CENTER, Fla. -- Space Shuttle Endeavour stands ready for launch after rollback of the Rotating Service Structure on Launch Pad 39B. Seen are the twin solid rocket boosters flanking the orange external tank. Stretching to the crew hatch on the side is the Orbiter Access Arm with its environmentally controlled White Room at the end. Below Endeavour is the Mobile Launcher Platform with the two service tail masts on either side of the main engines. The tail masts support the fluid, gas and electrical requirements of the orbiter's liquid oxygen and liquid hydrogen aft T-0 umbilicals. Each tail mast is 31 feet (9.4 meters) high, 15 feet (4.6 meters) long and 9 feet (3.1 meters) wide. Endeavour is scheduled to launch on mission STS-108 Nov. 29 at 7:41 p.m. On this 12th flight to the International Space Station, known as a Utilization Flight, Endeavour will carry a crew of four plus the Expedition 4 crew, who will replace Expedition 3 aboard the ISS. The payload includes the Multi-Purpose Logistics Module Raffaello, filled with supplies, equipment and experiments KSC01PD1744

STS-133 - Public domain NASA photogrpaph

STS-131 - EOM - Public domain NASA photogrpaph

CAPE CANAVERAL, Fla. - At Launch Pad 39A at NASA's Kennedy Space Center in Florida, the payload canister, at left, is lifted from its transporter toward the payload changeout room in the rotating service structure. The canister carries a cargo of four carriers holding various equipment for the STS-125 mission aboard space shuttle Atlantis to service NASA’s Hubble Space Telescope. Atlantis is seen at right, atop the mobile launcher platform. The two tail service masts flank the engines in front of the wings. At the pad, the cargo will be moved into the Payload Changeout Room. The changeout room is the enclosed, environmentally controlled portion of the rotating service structure that supports cargo delivery to the pad and subsequent vertical installation into the shuttle’s payload bay. Launch of Atlantis is targeted for Oct. 10. Photo credit: NASA/Troy Cryder KSC-08pd2786

CAPE CANAVERAL, Fla. -- Space shuttle Discovery heads to space after lifting off from Launch Pad 39A at NASA's Kennedy Space Center in Florida to begin its final flight, the STS-133 mission, to the International Space Station. Launch was at 4:53 p.m. EST. Discovery and its six-member crew will deliver the Permanent Multipurpose Module, packed with supplies and critical spare parts, as well as Robonaut 2, the dexterous humanoid astronaut helper, to the orbiting outpost. Discovery is flying on its 39th mission and is scheduled to be retired following STS-133. This is the 133rd Space Shuttle Program mission and the 35th shuttle voyage to the space station. For more information on the STS-133 mission, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts133/. Photo credit: NASA/Tony Gray and Tom Farrar KSC-2011-1763

STS-119 - LAUNCH - Public domain NASA photogrpaph

CAPE CANAVERAL, Fla. -- Space shuttle Endeavour is firmly attached to its external fuel tank and solid rocket boosters in a high bay of the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida. Endeavour is targeted to roll out to Kennedy's Launch Pad 39A for its final mission, STS-134, on March 9. Endeavour and the six-member crew will deliver the Express Logistics Carrier-3, Alpha Magnetic Spectrometer-2 (AMS), a high-pressure gas tank, additional spare parts for the Dextre robotic helper and micrometeoroid debris shields to the International Space Station. Endeavour's final launch is targeted for April 19 at 7:48 p.m. EDT. For more information visit, http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts134/index.html. Photo credit: NASA/Kim Shiflett KSC-2011-2036

CAPE CANAVERAL, Fla. -- Bathed in bright xenon lights, space shuttle Discovery makes its nighttime trek, known as "rollout," from the Vehicle Assembly Building to Launch Pad 39A at NASA's Kennedy Space Center in Florida. It will take the shuttle, attached to its external fuel tank, twin solid rocket boosters and mobile launcher platform, about six hours to complete the move atop a crawler-transporter. Rollout sets the stage for Discovery's STS-133 crew to practice countdown and launch procedures during the Terminal Countdown Demonstration Test in mid-October. Targeted to liftoff Nov. 1, Discovery will take the Permanent Multipurpose Module (PMM) packed with supplies and critical spare parts, as well as Robonaut 2 (R2) to the International Space Station. Photo credit: NASA/Frankie Martin KSC-2010-4715

A large space shuttle sitting on top of a truck. Columbia space shuttle rollout launch pad.

code Related

CAPE CANAVERAL, Fla. – At NASA's Kennedy Space Center in Florida, space shuttle Atlantis, attached to its external tank and solid rocket boosters atop a mobile launcher platform, arrives at Launch Complex 39A. First motion on the 3.4-mile trip from the Vehicle Assembly Building, known as rollout, was at 6:38 a.m. EDT Oct. 14. The rollout took about six hours, and the shuttle was secure on the pad at 1:31 p.m. Liftoff of Atlantis on its STS-129 mission to the International Space Station is targeted for Nov. 12. For information on the STS-129 mission and crew, visit http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts129/index.html. Photo credit: NASA/Kim Shiflett KSC-2009-5438

CAPE CANAVERAL, Fla. – Space shuttle Atlantis, attached to its external tank and solid rocket boosters, is illuminated as the sun rises over NASA's Kennedy Space Center in Florida. The shuttle is on its 3.4-mile trip, known as rollout, from the Vehicle Assembly Building to Launch Pad 39A. First motion was at 6:38 a.m. EDT Oct. 14. Rollout is expected to take about six hours. Liftoff of Atlantis on its STS-129 mission to the International Space Station is targeted for Nov. 12. For information on the STS-129 mission and crew, visit http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts129/index.html. Photo credit: NASA/Kim Shiflett KSC-2009-5426

CAPE CANAVERAL, Fla. – In the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida, space shuttle Atlantis, secured to its mobile launcher platform, slowly rolls out of High Bay 1. First motion was at 6:38 a.m. EDT Oct. 14. The 3.4-mile trip, known as rollout, is expected to take about six hours. Liftoff of Atlantis on its STS-129 mission to the International Space Station is targeted for Nov. 12. For information on the STS-129 mission and crew, visit http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts129/index.html. Photo credit: NASA/Kim Shiflett KSC-2009-5418

CAPE CANAVERAL, Fla. – At NASA's Kennedy Space Center in Florida, space shuttle Atlantis nears the end of its 3.4-mile journey, known as rollout, from the Vehicle Assembly Building to Launch Pad 39A. First motion was at 6:38 a.m. EDT Oct. 14. The rollout took about six hours, and the shuttle was secure on the pad at 1:31 p.m. Liftoff of Atlantis on its STS-129 mission to the International Space Station is targeted for Nov. 12. For information on the STS-129 mission and crew, visit http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts129/index.html. Photo credit: NASA/Kim Shiflett KSC-2009-5441

CAPE CANAVERAL, Fla. – At NASA's Kennedy Space Center in Florida, space shuttle Atlantis begins its 3.4-mile trip, known as rollout, from the Vehicle Assembly Building to Launch Pad 39A. First motion was at 6:38 a.m. EDT Oct. 14. Rollout is expected to take about six hours. Liftoff of Atlantis on its STS-129 mission to the International Space Station is targeted for Nov. 12. For information on the STS-129 mission and crew, visit http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts129/index.html. Photo credit: NASA/Jack Pfaller KSC-2009-5422

CAPE CANAVERAL, Fla. – At NASA's Kennedy Space Center in Florida, flags at Launch Pad 39A wave as if greeting space shuttle Atlantis upon its arrival. First motion on the 3.4-mile trip from the Vehicle Assembly Building, known as rollout, was at 6:38 a.m. EDT Oct. 14. The rollout took about six hours, and the shuttle was secure on the pad at 1:31 p.m. Liftoff of Atlantis on its STS-129 mission to the International Space Station is targeted for Nov. 12. For information on the STS-129 mission and crew, visit http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts129/index.html. Photo credit: NASA/Kim Shiflett KSC-2009-5439

CAPE CANAVERAL, Fla. – Space shuttle Atlantis is silhouetted against the pre-dawn sky as it rolls out to Launch Pad 39A at NASA's Kennedy Space Center in Florida. The pad, in the background, is illuminated as preparations are made to receive Atlantis. First motion out of the Vehicle Assembly Building was at 6:38 a.m. EDT Oct. 14. The 3.4-mile trip, known as rollout, is expected to take about six hours. Liftoff of Atlantis on its STS-129 mission to the International Space Station is targeted for Nov. 12. For information on the STS-129 mission and crew, visit http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts129/index.html. Photo credit: NASA/Kim Shiflett KSC-2009-5420

CAPE CANAVERAL, Fla. – In the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida, a worker on an access platform in High Bay 1 is spotter for space shuttle Atlantis as the crawler-transporter prepares to carry it to Launch Pad 39A. First motion out of the bay was at 6:38 a.m. EDT Oct. 14. The 3.4-mile trip, known as rollout, is expected to take about six hours. Liftoff of Atlantis on its STS-129 mission to the International Space Station is targeted for Nov. 12. For information on the STS-129 mission and crew, visit http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts129/index.html. Photo credit: NASA/Kim Shiflett KSC-2009-5416

CAPE CANAVERAL, Fla. – At NASA's Kennedy Space Center in Florida, space shuttle Atlantis makes steady progress on its 3.4-mile trek from the Vehicle Assembly Building to Launch Pad 39A. First motion was at 6:38 a.m. EDT Oct. 14. The move, known as rollout, is expected to take about six hours. Liftoff of Atlantis on its STS-129 mission to the International Space Station is targeted for Nov. 12. For information on the STS-129 mission and crew, visit http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts129/index.html. Photo credit: NASA/Kim Shiflett KSC-2009-5434

CAPE CANAVERAL, Fla. – At NASA's Kennedy Space Center in Florida, space shuttle Atlantis, attached to its external tank and solid rocket boosters atop a mobile launcher platform, nears the end of its 3.4-mile trip, known as rollout, from the Vehicle Assembly Building to Launch Pad 39A. First motion was at 6:38 a.m. EDT Oct. 14. Rollout is expected to take about six hours. Liftoff of Atlantis on its STS-129 mission to the International Space Station is targeted for Nov. 12. For information on the STS-129 mission and crew, visit http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts129/index.html. Photo credit: NASA/Kim Shiflett KSC-2009-5437

description

Summary

CAPE CANAVERAL, Fla. – At NASA's Kennedy Space Center in Florida, space shuttle Atlantis, attached to its external tank and solid rocket boosters atop a mobile launcher platform, nears the end of its 3.4-mile trip, known as rollout, from the Vehicle Assembly Building to Launch Pad 39A. First motion was at 6:38 a.m. EDT Oct. 14. Rollout is expected to take about six hours. Liftoff of Atlantis on its STS-129 mission to the International Space Station is targeted for Nov. 12. For information on the STS-129 mission and crew, visit http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts129/index.html. Photo credit: NASA/Kim Shiflett

The Space Shuttle program was the United States government's manned launch vehicle program from 1981 to 2011, administered by NASA and officially beginning in 1972. The Space Shuttle system—composed of an orbiter launched with two reusable solid rocket boosters and a disposable external fuel tank— carried up to eight astronauts and up to 50,000 lb (23,000 kg) of payload into low Earth orbit (LEO). When its mission was complete, the orbiter would re-enter the Earth's atmosphere and lands as a glider. Although the concept had been explored since the late 1960s, the program formally commenced in 1972 and was the focus of NASA's manned operations after the final Apollo and Skylab flights in the mid-1970s. It started with the launch of the first shuttle Columbia on April 12, 1981, on STS-1. and finished with its last mission, STS-135 flown by Atlantis, in July 2011.

Space Shuttle Atlantis was a space shuttle that was operated by NASA as part of the Space Shuttle program. It was the fourth operational shuttle built, and the last one to be built before the program was retired in 2011. Atlantis was named after the first research vessel operated by the Woods Hole Oceanographic Institution, and it made its first flight in October 1985. Over the course of its career, Atlantis completed 33 missions and spent a total of 307 days in space. Its last mission was STS-135, which was the final mission of the Space Shuttle program. Atlantis is now on display at the Kennedy Space Center Visitor Complex in Florida. Space Shuttle Atlantis (Orbiter Vehicle Designation: OV-104) was one of the four first operational orbiters in the Space Shuttle fleet of NASA, the space agency of the United States. (The other two are Discovery and Endeavour.) Atlantis was the fourth operational shuttle built. Atlantis is named after a two-masted sailing ship that operated from 1930 to 1966 for the Woods Hole Oceanographic Institute. Atlantis performed well in 25 years of service, flying 33 missions.

Nothing Found.

label_outline

Tags

ov 104 ceit kennedy space center cape canaveral atlantis space shuttle atlantis tank rocket boosters rocket boosters launcher platform launcher platform trip rollout launch pad edt oct hours six hours liftoff sts international space station space shuttle space shuttle on launch pad high resolution nasa
date_range

Date

1960 - 1969
collections

in collections

Space Shuttle Program

Space Shuttle Atlantis

The Fourth Pperational Shuttle Built
place

Location

create

Source

NASA
link

Link

https://images.nasa.gov/
copyright

Copyright info

Public Domain Dedication (CC0)

label_outline Explore Ov 104 Ceit, Edt Oct, Six Hours

STS-132 ATLANTIS ROLLOUT FROM VAB TO PAD 39A 2010-2919

Space Shuttle Atlantis, STS-45 Launch

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, space shuttle Atlantis' main engines and solid rocket boosters ignite on Launch Pad 39A leaving behind a billow of steam as it lifts off on its STS-135 mission to the International Space Station. Atlantis with its crew of four; Commander Chris Ferguson, Pilot Doug Hurley, Mission Specialists Sandy Magnus and Rex Walheim, lifted off at 11:29 a.m. EDT on July 8, 2011 to deliver the Raffaello multi-purpose logistics module packed with supplies and spare parts for the International Space Station. Atlantis also will fly the Robotic Refueling Mission experiment that will investigate the potential for robotically refueling existing satellites in orbit. In addition, Atlantis will return with a failed ammonia pump module to help NASA better understand the failure mechanism and improve pump designs for future systems. STS-135 is the 33rd flight of Atlantis, the 37th shuttle mission to the space station, and the 135th and final mission of NASA's Space Shuttle Program. For more information, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Tony Gray and Kevin O'Connell KSC-2011-5422

KENNEDY SPACE CENTER, FLA. -- Inside the VAB, orbiter Endeavour is lifted to a vertical position before being mated to the external tank (bottom of photo) and solid rocket boosters in high bay 1. Space Shuttle Endeavour is targeted for launch on mission STS-99 Jan. 13, 2000, at 1:11 p.m. EST. STS-99 is the Shuttle Radar Topography Mission, an international project spearheaded by the National Imagery and Mapping Agency and NASA, with participation of the German Aerospace Center DLR. The SRTM consists of a specially modified radar system that will gather data for the most accurate and complete topographic map of the Earth's surface that has ever been assembled. SRTM will make use of radar interferometry, wherein two radar images are taken from slightly different locations. Differences between these images allow for the calculation of surface elevation, or change. The SRTM hardware will consist of one radar antenna in the shuttle payload bay and a second radar antenna attached to the end of a mast extended 60 meters (195 feet) out from the shuttle KSC-99pp1381

Launching of the Shuttle Discovery and the STS 51-G mission

CAPE CANAVERAL, Fla. -- Ground support equipment technicians monitor the progress as crawler-transporter 1 begins its trek to Launch Pad 39A at NASA’s Kennedy Space Center in Florida. New jacking, equalizing and leveling, or JEL, hydraulic cylinders were installed on CT-1 and are being tested for increased load carrying capacity and reliability. The Vehicle Assembly Building is visible in the background. The Ground Systems Development and Operations Program at Kennedy continues to upgrade the crawler-transporter as part of its general maintenance. CT-1 could be available to carry a variety of launch vehicles to the launch pad. Two crawler-transporters were used to carry the mobile launcher platform and space shuttle to Launch Complex 39 for space shuttle launches for 30 years. Photo credit: NASA/Daniel Casper KSC-2013-4203

CAPE CANAVERAL, Fla. – In the Vehicle Assembly Building at NASA's Kennedy Space Center, the external tank for space shuttle Atlantis is lowered toward the solid rocket boosters (the nose cone of one of the boosters is seen here) for mating. The tank and boosters will be secured on the mobile launcher platform below. Atlantis' STS-125 mission is the fifth and final shuttle servicing mission to NASA’s Hubble Space Telescope. Launch is targeted for Oct. 8. Photo credit: NASA/Jack Pfaller KSC-08pd2265

KENNEDY SPACE CENTER, FLA. -- After leaving the Orbiter Processing Facility bay 2, the orbiter Endeavour, atop its transporter, rolls toward the Vehicle Assembly Building. In the VAB, it will be stacked with the external tank and solid rocket boosters atop the mobile launcher platform for its launch on mission STS-118. The mission will be Endeavour's first flight in more than four years. The shuttle has undergone extensive modifications, including the addition of safety upgrades already added to shuttles Discovery and Atlantis. Endeavour also features new hardware, such as the Station-to-Shuttle Power Transfer System that will allow the docked shuttle to draw electrical power from the station and extend its visits to the orbiting lab. Endeavour is targeted for launch on Aug. 7. Photo credit: NASA/Kim Shiflett KSC-07pd1709

CAPE CANAVERAL, Fla. -- Space shuttle Discovery is attached to Launch Pad 39A as the sun rises over NASA's Kennedy Space Center in Florida. It took the spacecraft about six hours to make the journey, known as "rollout," from the Vehicle Assembly Building to the pad. Rollout sets the stage for Discovery's STS-133 crew to practice countdown and launch procedures during the Terminal Countdown Demonstration Test in mid-October. Targeted to liftoff Nov. 1, Discovery will take the Permanent Multipurpose Module (PMM) packed with supplies and critical spare parts, as well as Robonaut 2 (R2) to the International Space Station. Photo credit: NASA/Jack Pfaller KSC-2010-4736

CAPE CANAVERAL, Fla. - In the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida, external fuel tank, ET-138, for space shuttle Atlantis' STS-135 mission, is lowered into high bay-1 for joining with the twin solid rocket boosters on the mobile launcher platform. Shuttle Atlantis' move, or "rollover," from Orbiter Processing Facility-1 to the VAB is targeted for May 10. Once there it will be mated with the external tank and boosters. Atlantis and its crew of four will deliver the Raffaello multipurpose logistics module packed with supplies and spare parts to the International Space Station. STS-135 is targeted to launch June 28, and will be the last spaceflight for the Space Shuttle Program. Photo credit: NASA/Jack Pfaller KSC-2011-3043

Space Shuttle Challenger, Transfer - STS-13 / 41C

CAPE CANAVERAL, Fla. – In the Vehicle Assembly Building transfer aisle at NASA's Kennedy Space Center, the overhead crane lifts space shuttle Atlantis from its transporter. Atlantis will be raised to vertical for transfer to high bay 3. There it will be stacked with its external fuel tank and twin solid rocket boosters. After additional preparations are made, the shuttle will be rolled out to Launch Pad 39A to prepare for launch on the STS-125 mission targeted for 1:34 a.m. EDT Oct. 8. Photo credit: NASA/Dimitri Gerondidakis KSC-08pd2487

Topics

ov 104 ceit kennedy space center cape canaveral atlantis space shuttle atlantis tank rocket boosters rocket boosters launcher platform launcher platform trip rollout launch pad edt oct hours six hours liftoff sts international space station space shuttle space shuttle on launch pad high resolution nasa