visibility Similar

STS-134 - LAUNCH - Public domain NASA photogrpaph

Aerials - STS-133 Discovery on Pad 39A, LEED Bldg., VAB Aerials

STS-135 - Public domain NASA photogrpaph

STS-132 - LAUNCH - Public domain NASA photogrpaph

STS-132 - LAUNCH - Public domain NASA photogrpaph

STS-132 - LAUNCH - Public domain NASA photogrpaph

KENNEDY SPACE CENTER, FLA. - On Launch Pad 39B, the rotating service structure has been rolled away from Space Shuttle Atlantis, sitting on the mobile launcher platform. The crawler-transporter, which has moved underneath, will lift and carry both back to the Vehicle Assembly Building (VAB), approximately 4 miles away. Despite the clear blue skies, the rollback is a safety precaution as the area waits for the arrival of Tropical Storm Ernesto. The storm is forecast to be bringing 58-mph to 70-mph winds in the next 24 hours. The shuttle will be moved into high bay 2, on the southwest side of the VAB, for protection from the storm. Photo credit: NASA/Jim Grossmann KSC-06pd1968

KENNEDY SPACE CENTER, FLA. -- Space Shuttle Columbia, atop its Mobile Launcher Platform, inches its way along the path to Launch Pad 39A. Columbia is scheduled to be launched Feb. 28 on mission STS-109, a Hubble Servicing Mission. The goal of the mission is to replace Solar Array 2 with Solar Array 3, replace the Power Control Unit, remove the Faint Object Camera and install the ACS, install the Near Infrared Camera and Multi-Object Spectrometer (NICMOS) Cooling System, and install New Outer Blanket Layer insulation. The launch will be the first for Columbia after returning from California where it underwent extensive maintenance, inspections and enhancements. More than 100 upgrades make Columbia safer and more reliable than ever before KSC-02pd0047

STS-132 - LAUNCH - Public domain NASA photogrpaph

code Related

CAPE CANAVERAL, Fla. – Space shuttle Atlantis comes to a stop on the top of Launch Pad 39A at NASA's Kennedy Space Center after more than a 6-hour journey from the Vehicle Assembly Building. First motion occurred at 9:19 a.m. EDT and Atlantis was hard down on the pad at 3:52 p.m.. The shuttle stack, with solid rocket boosters and external fuel tank attached to Atlantis, rest on the mobile launcher platform. Movement is provided by the crawler-transporter underneath. The Sept. 2 rollout date was postponed due to Tropical Storm Hanna’s shift to a northern track. Atlantis is scheduled to launch on the STS-125 mission to service NASA’s Hubble Space Telescope. Launch is targeted for Oct. 8. Photo credit: NASA/Kim Shiflett KSC-08pd2546

CAPE CANAVERAL, Fla. – Space shuttle Atlantis approaches the top of Launch Pad 39A at NASA's Kennedy Space Center after rolling from the Vehicle Assembly Building. First motion occurred at 9:19 a.m. EDT and Atlantis was hard down on the pad at 3:52 p.m.. The shuttle stack, with solid rocket boosters and external fuel tank attached to Atlantis, rest on the mobile launcher platform. Movement is provided by the crawler-transporter underneath. The Sept. 2 rollout date was postponed due to Tropical Storm Hanna’s shift to a northern track. Atlantis is scheduled to launch on the STS-125 mission to service NASA’s Hubble Space Telescope. Launch is targeted for Oct. 8. Photo credit: NASA/Kim Shiflett KSC-08pd2544

CAPE CANAVERAL, Fla. – Space shuttle Atlantis makes the slow journey up the incline to the top of Launch Pad 39A at NASA's Kennedy Space Center. First motion occurred at 9:19 a.m. EDT and Atlantis was hard down on the pad at 3:52 p.m.. The shuttle stack, with solid rocket boosters and external fuel tank attached to Atlantis, rest on the mobile launcher platform. Movement is provided by the crawler-transporter underneath. The Sept. 2 rollout date was postponed due to Tropical Storm Hanna’s shift to a northern track. Atlantis is scheduled to launch on the STS-125 mission to service NASA’s Hubble Space Telescope. Launch is targeted for Oct. 8. Photo credit: NASA/Kim Shiflett KSC-08pd2545

CAPE CANAVERAL, Fla. – Space shuttle Atlantis comes to a stop on the top of Launch Pad 39A at NASA's Kennedy Space Center after more than a 6-hour journey from the Vehicle Assembly Building. First motion occurred at 9:19 a.m. EDT and Atlantis was hard down on the pad at 3:52 p.m. At far left is the rotating service structure that will be rotated to enclose the shuttle for launch preparations. The shuttle stack, with solid rocket boosters and external fuel tank attached to Atlantis, rest on the mobile launcher platform. Movement is provided by the crawler-transporter underneath. The Sept. 2 rollout date was postponed due to Tropical Storm Hanna’s shift to a northern track. Atlantis is scheduled to launch on the STS-125 mission to service NASA’s Hubble Space Telescope. Launch is targeted for Oct. 8. Photo credit: NASA/Kim Shiflett KSC-08pd2549

CAPE CANAVERAL, Fla. – Space shuttle Atlantis comes to a stop on the top of Launch Pad 39A at NASA's Kennedy Space Center after more than a 6-hour journey from the Vehicle Assembly Building. First motion occurred at 9:19 a.m. EDT and Atlantis was hard down on the pad at 3:52 p.m. At far left is the rotating service structure that will be rotated to enclose the shuttle for launch preparations. The shuttle stack, with solid rocket boosters and external fuel tank attached to Atlantis, rest on the mobile launcher platform. Movement is provided by the crawler-transporter underneath. The Sept. 2 rollout date was postponed due to Tropical Storm Hanna’s shift to a northern track. Atlantis is scheduled to launch on the STS-125 mission to service NASA’s Hubble Space Telescope. Launch is targeted for Oct. 8. Photo credit: NASA/Kim Shiflett KSC-08pd2548

CAPE CANAVERAL, Fla. – Space shuttle Atlantis comes to a stop on the top of Launch Pad 39A at NASA's Kennedy Space Center after more than a 6-hour journey from the Vehicle Assembly Building. First motion occurred at 9:19 a.m. EDT and Atlantis was hard down on the pad at 3:52 p.m. At lower left is the White Room at the end of the orbiter access arm on the fixed service structure. The shuttle stack, with solid rocket boosters and external fuel tank attached to Atlantis, rest on the mobile launcher platform. Movement is provided by the crawler-transporter underneath. The Sept. 2 rollout date was postponed due to Tropical Storm Hanna’s shift to a northern track. Atlantis is scheduled to launch on the STS-125 mission to service NASA’s Hubble Space Telescope. Launch is targeted for Oct. 8. Photo credit: NASA/Kim Shiflett KSC-08pd2547

CAPE CANAVERAL, Fla. – Space shuttle Atlantis passes through the gate and approaches the top of Launch Pad 39A after rolling from the Vehicle Assembly Building at NASA's Kennedy Space Center. The shuttle stack, with solid rocket boosters and external fuel tank attached to Atlantis, rest on the mobile launcher platform. Movement is provided by the crawler-transporter underneath. First motion occurred at 9:19 a.m. EDT. The Sept. 2 rollout date was postponed due to Tropical Storm Hanna’s shift to a northern track. Atlantis is scheduled to launch on the STS-125 mission to service NASA’s Hubble Space Telescope. Launch is targeted for Oct. 8. Photo credit: NASA/Kim Shiflett KSC-08pd2542

CAPE CANAVERAL, Fla. – Space Space shuttle Atlantis curves toward Launch Pad 39A (at left) on the crawlerway at NASA's Kennedy Space Center after rolling from the Vehicle Assembly Building. The shuttle stack, with solid rocket boosters and external fuel tank attached to Atlantis, rest on the mobile launcher platform. Movement is provided by the crawler-transporter underneath. First motion occurred at 9:19 a.m. EDT. The Sept. 2 rollout date was postponed due to Tropical Storm Hanna’s shift to a northern track. Atlantis is scheduled to launch on the STS-125 mission to service NASA’s Hubble Space Telescope. Launch is targeted for Oct. 8. Photo credit: NASA/Kim Shiflett KSC-08pd2543

CAPE CANAVERAL, Fla. – Viewed across the turn basin near the Vehicle Assembly Building at NASA's Kennedy Space Center, space shuttle Atlantis crawls toward Launch Pad 39A. The shuttle stack, with solid rocket boosters and external fuel tank attached to Atlantis, rest on the mobile launcher platform. Movement is provided by the crawler-transporter underneath. First motion occurred at 9:19 a.m. EDT. The Sept. 2 rollout date was postponed due to Tropical Storm Hanna’s shift to a northern track. Atlantis is scheduled to launch on the STS-125 mission to service NASA’s Hubble Space Telescope. Launch is targeted for Oct. 8. Photo credit: NASA/Kim Shiflett KSC-08pd2536

CAPE CANAVERAL, Fla. – Space shuttle Atlantis comes to a stop on the top of Launch Pad 39A at NASA's Kennedy Space Center after more than a 6-hour journey from the Vehicle Assembly Building. First motion occurred at 9:19 a.m. EDT and Atlantis was hard down on the pad at 3:52 p.m. The shuttle stack, with solid rocket boosters and external fuel tank attached to Atlantis, rest on the mobile launcher platform. Movement is provided by the crawler-transporter underneath. The Sept. 2 rollout date was postponed due to Tropical Storm Hanna’s shift to a northern track. Atlantis is scheduled to launch on the STS-125 mission to service NASA’s Hubble Space Telescope. Launch is targeted for Oct. 8. Photo credit: NASA/Kim Shiflett KSC-08pd2550

description

Summary

CAPE CANAVERAL, Fla. – Space shuttle Atlantis comes to a stop on the top of Launch Pad 39A at NASA's Kennedy Space Center after more than a 6-hour journey from the Vehicle Assembly Building. First motion occurred at 9:19 a.m. EDT and Atlantis was hard down on the pad at 3:52 p.m. The shuttle stack, with solid rocket boosters and external fuel tank attached to Atlantis, rest on the mobile launcher platform. Movement is provided by the crawler-transporter underneath. The Sept. 2 rollout date was postponed due to Tropical Storm Hanna’s shift to a northern track. Atlantis is scheduled to launch on the STS-125 mission to service NASA’s Hubble Space Telescope. Launch is targeted for Oct. 8. Photo credit: NASA/Kim Shiflett

The Space Shuttle program was the United States government's manned launch vehicle program from 1981 to 2011, administered by NASA and officially beginning in 1972. The Space Shuttle system—composed of an orbiter launched with two reusable solid rocket boosters and a disposable external fuel tank— carried up to eight astronauts and up to 50,000 lb (23,000 kg) of payload into low Earth orbit (LEO). When its mission was complete, the orbiter would re-enter the Earth's atmosphere and lands as a glider. Although the concept had been explored since the late 1960s, the program formally commenced in 1972 and was the focus of NASA's manned operations after the final Apollo and Skylab flights in the mid-1970s. It started with the launch of the first shuttle Columbia on April 12, 1981, on STS-1. and finished with its last mission, STS-135 flown by Atlantis, in July 2011.

Space Shuttle Atlantis was a space shuttle that was operated by NASA as part of the Space Shuttle program. It was the fourth operational shuttle built, and the last one to be built before the program was retired in 2011. Atlantis was named after the first research vessel operated by the Woods Hole Oceanographic Institution, and it made its first flight in October 1985. Over the course of its career, Atlantis completed 33 missions and spent a total of 307 days in space. Its last mission was STS-135, which was the final mission of the Space Shuttle program. Atlantis is now on display at the Kennedy Space Center Visitor Complex in Florida. Space Shuttle Atlantis (Orbiter Vehicle Designation: OV-104) was one of the four first operational orbiters in the Space Shuttle fleet of NASA, the space agency of the United States. (The other two are Discovery and Endeavour.) Atlantis was the fourth operational shuttle built. Atlantis is named after a two-masted sailing ship that operated from 1930 to 1966 for the Woods Hole Oceanographic Institute. Atlantis performed well in 25 years of service, flying 33 missions.

label_outline

Tags

ov 104 kennedy space center cape canaveral atlantis space shuttle atlantis stop launch pad shuttle stack rocket boosters rocket boosters fuel fuel tank launcher platform launcher platform movement crawler transporter rollout rollout date hanna tropical storm hanna shift track sts hubble telescope service nasa hubble space telescope space shuttle space shuttle on launch pad high resolution tropical storm spacecraft rocket launch space launch complex nasa
date_range

Date

04/09/2008
collections

in collections

Space Shuttle Program

Space Shuttle Atlantis

The Fourth Pperational Shuttle Built
place

Location

create

Source

NASA
link

Link

https://images.nasa.gov/
copyright

Copyright info

Public Domain Dedication (CC0)

label_outline Explore Rollout Date, Tropical Storm Hanna Shift, Shuttle Stack

CAPE CANAVERAL, Fla. - In Orbiter Processing Facility 1 at NASA's Kennedy Space Center in Florida, United Space Alliance technicians, lying on a work platform, remove window #8 from the top of the crew module of space shuttle Atlantis. Inspection and maintenance of the crew module windows is standard procedure between shuttle missions. Atlantis is next slated to deliver an Integrated Cargo Carrier and Russian-built Mini Research Module to the International Space Station on the STS-132 mission. The second in a series of new pressurized components for Russia, the module will be permanently attached to the Zarya module. Three spacewalks are planned to store spare components outside the station, including six spare batteries, a boom assembly for the Ku-band antenna and spares for the Canadian Dextre robotic arm extension. A radiator, airlock and European robotic arm for the Russian Multi-purpose Laboratory Module also are payloads on the flight. Launch is targeted for May 14. Photo credit: NASA/Glenn Benson KSC-2010-1082

CAPE CANAVERAL, Fla. -- Space shuttle Endeavour rolls to a stop on the Shuttle Landing Facility's Runway 15 at NASA's Kennedy Space Center in Florida for the final time. Main gear touchdown was at 2:34:51 a.m. EDT, followed by nose gear touchdown at 2:35:04 a.m., and wheelstop at 2:35:36 a.m. On board are STS-134 Commander Mark Kelly, Pilot Greg H. Johnson, and Mission Specialists Mike Fincke, Drew Feustel, Greg Chamitoff and the European Space Agency's Roberto Vittori. STS-134 delivered the Alpha Magnetic Spectrometer-2 (AMS) and the Express Logistics Carrier-3 (ELC-3) to the International Space Station. AMS will help researchers understand the origin of the universe and search for evidence of dark matter, strange matter and antimatter from the station. ELC-3 carried spare parts that will sustain station operations once the shuttles are retired from service. STS-134 was the 25th and final flight for Endeavour, which has spent 299 days in space, orbited Earth 4,671 times and traveled 122,883,151 miles. Photo credit: NASA/Kevin O'Connell KSC-2011-4192

CAPE CANAVERAL, Fla. - At Launch Pad 39A at NASA's Kennedy Space Center in Florida, the payload canister, at left, is lifted from its transporter toward the payload changeout room in the rotating service structure. The canister carries a cargo of four carriers holding various equipment for the STS-125 mission aboard space shuttle Atlantis to service NASA’s Hubble Space Telescope. Atlantis is seen at right, atop the mobile launcher platform. The two tail service masts flank the engines in front of the wings. At the pad, the cargo will be moved into the Payload Changeout Room. The changeout room is the enclosed, environmentally controlled portion of the rotating service structure that supports cargo delivery to the pad and subsequent vertical installation into the shuttle’s payload bay. Launch of Atlantis is targeted for Oct. 10. Photo credit: NASA/Troy Cryder KSC-08pd2786

Launch of Space Shuttle Atlantis

KENNEDY SPACE CENTER, Fla. -- Space Shuttle Atlantis, atop the Mobile Launcher Platform and Crawler-Transporter, arrives at Launch Pad 39B for preparations before launch. It started its 8-hour rollout from the Vehicle Assembly Building high bay 2 (Safe Haven) at 11:20 p.m., Aug. 13. This photo was taken about 7:15 a.m. At left is the Rotating Service Structure in its open position. Towering above the RSS (and attached to the Fixed Service Structure) is the 80-foot tall lightning mast. Atlantis is scheduled for launch Sept. 8 at 8:31 a.m. EDT on mission STS-106 KSC00pp1120

KENNEDY SPACE CENTER, FLA. -- Space Shuttle Atlantis passes the turn basin as it slowly wends its way toward Launch Pad 39A. First motion out of the Vehicle Assembly Building was at 8:19 a.m. The 3.4-mile trip to the pad along the crawlerway will take about 6 hours. The mission payload aboard Space Shuttle Atlantis is the S3/S4 integrated truss structure, along with a third set of solar arrays and batteries. The crew of six astronauts will install the truss to continue assembly of the International Space Station. Launch is targeted for March 15. Photo credit: NASA/Ken Thornsley KSC-07pd0390

KENNEDY SPACE CENTER, Fla. -- Atop the mobile launcher platform, Space Shuttle Atlantis arrives on Launch Pad 39B after rollout from the Vehicle Assembly Building. Seen on either side of the orbiter’s tail are the tail service masts. They support the fluid, gas and electrical requirements of the orbiter’s liquid oxygen and liquid hydrogen aft umbilicals. The Shuttle is targeted for launch no earlier than July 12 on mission STS-104, the 10th flight to the International Space Station. The payload on the 11-day mission is the Joint Airlock Module, which will allow astronauts and cosmonauts in residence on the Station to perform future spacewalks without the presence of a Space Shuttle. The module, which comprises a crew lock and an equipment lock, will be connected to the starboard (right) side of Node 1 Unity. Atlantis will also carry oxygen and nitrogen storage tanks, vital to operation of the Joint Airlock, on a Spacelab Logistics Double Pallet in the payload bay. The tanks, to be installed on the perimeter of the Joint Module during the mission’s spacewalks, will support future spacewalk operations and experiments plus augment the resupply system for the Station’s Service Module KSC-01pp1184

STS-38 Atlantis, OV-104, lifts off from KSC LC Pad during night launch

CAPE CANAVERAL, Fla. – In the transfer aisle of the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida, a United Space Alliance technician prepares to attach a lifting sling to space shuttle Endeavour. Next, Endeavour will be hoisted over a transom and lowered into High Bay 1, where it will be attached to its external fuel tank and solid rocket boosters. Rollout of the shuttle stack to Kennedy’s Launch Pad 39A, a significant milestone in launch processing activities, is planned for early January 2010. The Italian-built Tranquility module, the primary payload for Endeavour's STS-130 mission, will be installed in the payload bay after the shuttle arrives at the pad. Launch is targeted for early February. For information on the STS-130 mission and crew, visit http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts130/index.html. Photo credit: NASA/Dimitri Gerondidakis KSC-2009-6759

KENNEDY SPACE CENTER, FLA. - Space Shuttle Endeavour is on Launch Pad 39A and ready for prelaunch processing after a nearly 7-hour trip from the Vehicle Assembly Building. First motion out of the VAB was at 8:10 p.m. July 10, and the shuttle was hard down on the pad at 3:02 a.m. July 11. At far left is the rotating service structure, which can be rolled around to enclose the shuttle for access during processing. Behind the shuttle is the fixed service structure, topped by an 80-foot-tall lightning mast. Endeavour is scheduled to launch on mission STS-118 on Aug. 7. During the mission, Endeavour will carry into orbit the S5 truss, SPACEHAB module and external stowage platform 3. The mission is the 22nd flight to the International Space Station and will mark the first flight of Mission Specialist Barbara Morgan, the teacher-turned-astronaut whose association with NASA began more than 20 years ago. STS-118 will be the first flight since 2002 for Endeavour, which has undergone extensive modifications, including the addition of safety upgrades already added to orbiters Discovery and Atlantis. Photo credit: NASA/Ken Thornsley KSC-07pd1831

CAPE CANAVERAL, Fla. -- At the Kennedy Space Center in Florida, President Jimmy Carter, hand on waist, is briefed on preparations for the first space shuttle launch by center director Lee Scherer. To the left of Carter is NASA Administrator Robert Frosch. Photo Credit: NASA KSC-78PC-0475

KENNEDY SPACE CENTER, FLA. -- After a nearly 5.3 million mile round trip to the International Space Station, space shuttle Atlantis slows down with the aid of a drag chute after landing on Runway 15 of the Shuttle Landing Facility at NASA's Kennedy Space Center. The shuttle landed on orbit 202 to complete the 13-day STS-122 mission. Main gear touchdown was 9:07:10 a.m. Nose gear touchdown was 9:07:20 a.m. Wheel stop was at 9:08:08 a.m. Mission elapsed time was 12 days, 18 hours, 21 minutes and 44 seconds. During the mission, Atlantis' crew installed the new Columbus laboratory, leaving a larger space station and one with increased science capabilities. The Columbus Research Module adds nearly 1,000 cubic feet of habitable volume and affords room for 10 experiment racks, each an independent science lab. Photo credit: NASA/Kenny Allen, Robert Murray KSC-08pp0440

Topics

ov 104 kennedy space center cape canaveral atlantis space shuttle atlantis stop launch pad shuttle stack rocket boosters rocket boosters fuel fuel tank launcher platform launcher platform movement crawler transporter rollout rollout date hanna tropical storm hanna shift track sts hubble telescope service nasa hubble space telescope space shuttle space shuttle on launch pad high resolution tropical storm spacecraft rocket launch space launch complex nasa