visibility Similar

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility-3 at NASA's Kennedy Space Center in Florida, members of the STS-130 crew inspect space shuttle Endeavour's payload bay. In the right corner, from left are Commander George Zamka, Pilot Terry Virts Jr. and Mission Specialist Robert Behnken. The crew is at Kennedy for a crew equipment interface test, or CEIT, which provides hands-on training and observation of shuttle and flight hardware. The STS-130 flight will carry the Tranquility pressurized module with a built-in cupola to the International Space Station aboard Endeavour. Launch is targeted for Feb. 4, 2010. Photo credit: NASA/Kim Shiflett KSC-2009-6143

KENNEDY SPACE CENTER, FLA. - In the Orbiter Processing Facility bay 1 at NASA Kennedy Space Center, engineers stand by as the remote manipulator system, or boom, is lowered toward Atlantis’ payload bay for installation. Atlantis is the designated orbiter for mission STS-115, the 19th assembly flight to the International Space Station. The payload includes the P3/P4 solar arrays. The launch planning window has not been determined yet for STS-115. KSC-06pd0012

THEMIS SPACECRAFT - Public domain NASA photogrpaph

In the Orbiter Processing Facility bay 1, the STS-96 crew (foreground) looks into the payload bay of the orbiter Discovery. Standing in the bucket in the foreground are (left to right) Mission Specialists Daniel Barry (M.D., Ph.D.), Valery Ivanovich Tokarev, and Tamara E. Jernigan (Ph.D.), with a KSC worker at the controls of the bucket. In the background (center) pointing is Mission Specialist Julie Payette. Tokarev represents the Russian Space Agency and Payette the Canadian Space Agency. They are at KSC for a Crew Equipment Interface Test. The other crew members participating in the test are Commander Kent V. Rominger, Pilot Rick Douglas Husband and Mission Specialist Ellen Ochoa (Ph.D.). The primary payload of STS-96 is the SPACEHAB Double Module. In addition, the Space Shuttle will carry unpressurized cargo such as the external Russian cargo crane known as STRELA; the Spacehab Oceaneering Space System Box (SHOSS), which is a logistics items carrier; and an ORU Transfer Device (OTD), a U.S.-built crane that will be stowed on the station for use during future ISS assembly missions. These cargo items will be stowed on the International Cargo Carrier, fitted inside the payload bay behind the SPACEHAB module. STS-96 is targeted for launch on May 24 from Launch Pad 39B KSC-99pp0322

NASA's Lunar Reconnaissance Orbiter (LRO) spacecraft at Goddard Space Flight Center

KENNEDY SPACE CENTER, FLA. - STS-118 Mission Specialist Scott Parazynski (left) practices using a tool that is part of equipment for the mission to the International Space Station. Below is Mission Specialist Dafydd Williams (Canadian Space Agency). At right is STS-116 Mission Specialist Christer Fuglesang (European Space Agency), also taking part in the equipment familiarization. The STS-118 mission will be delivering and installing the third starboard truss segment, the ITS S5, to the International Space Station, and carry a SPACEHAB Single Cargo Module with supplies and equipment. The STS-116 mission will deliver the third port truss segment, the P5 Truss, to attach to the second port truss segment, the P3/P4 Truss. Launch dates for both missions are under review. KSC-04pd0878

GODDARD 40TH ANNIVERSARY - U.S. National Archives Public Domain photograph

CAPE CANAVERAL, Fla. – In the Space Station Processing Facility at NASA's Kennedy Space Center in Florida, technicians check the nitrogen tank assembly closely as an overhead crane lifts and moves it to the Express Logistics Carrier 1, or ELC-1. The carrier is part of the STS-129 payload on space shuttle Atlantis, which will deliver to the International Space Station two spare gyroscopes, two nitrogen tank assemblies, two pump modules, an ammonia tank assembly and a spare latching end effector for the station's robotic arm. STS-129 is targeted to launch Nov. 12. Photo credit: NASA/Jim Grossmann KSC-2009-4712

KENNEDY SPACE CENTER, FLA. - In the Space Station Processing Facility, the Node 2 is powered up for the Traveled Work Systems Test (TWST) being conducted. The TWST executes open work that traveled with the Node 2 from Italy and simulates the on-orbit activation sequence. Node 2 was powered up Aug. 19 for the testing. The second of three Space Station connecting modules, the Node 2 attaches to the end of the U.S. Lab and provides attach locations for several other elements. Node 2 is scheduled to launch on mission STS-120, assembly flight 10A to the International Space Station. KSC-04pd1677

code Related

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility 2 at NASA's Kennedy Space Center, STS-126 Commander Chris Ferguson (left) and Mission Specialist Steve Bowen get a close look at hardware inside space shuttle Endeavour's payload bay. Members of space shuttle Endeavour's STS-126 crew are at Kennedy to participate in a crew equipment interface test, or CEIT. The CEIT provides experience handling tools, equipment and hardware they will use on the mission. Endeavour will deliver a multi-purpose logistics module to the International Space Station on the STS-126 mission. Launch is targeted for Nov. 10. Photo credit: NASA/Kim Shiflett KSC-08pd2252

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility 2 at NASA's Kennedy Space Center, STS-126 Mission Specialist Shane Kimbrough gets a closer look at hardware inside space shuttle Endeavour's payload bay. Members of space shuttle Endeavour's STS-126 crew are at Kennedy to participate in a crew equipment interface test, or CEIT. The CEIT provides experience handling tools, equipment and hardware they will use on the mission. Endeavour will deliver a multi-purpose logistics module to the International Space Station on the STS-126 mission. Launch is targeted for Nov. 10. Photo credit: NASA/Kim Shiflett KSC-08pd2257

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility 2 at NASA's Kennedy Space Center, STS-126 Mission Specialist Steve Bowen (left) checks hardware in the space shuttle Endeavour's payload bay. Members of space shuttle Endeavour's STS-126 crew are at Kennedy to participate in a crew equipment interface test, or CEIT. The CEIT provides experience handling tools, equipment and hardware they will use on the mission. Endeavour will deliver a multi-purpose logistics module to the International Space Station on the STS-126 mission. Launch is targeted for Nov. 10. Photo credit: NASA/Kim Shiflett KSC-08pd2251

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility 2 at NASA's Kennedy Space Center, STS-126 Mission Specialists Heidemarie Stefanyshyn-Piper and Steve Bowen look over tools required for the mission. Members of space shuttle Endeavour's STS-126 crew are at Kennedy to participate in a crew equipment interface test, or CEIT. The CEIT provides experience handling tools, equipment and hardware they will use on the mission. Endeavour will deliver a multi-purpose logistics module to the International Space Station on the STS-126 mission. Launch is targeted for Nov. 10. Photo credit: NASA/Kim Shiflett KSC-08pd2243

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility 2 at NASA's Kennedy Space Center, STS-126 Mission Specialists Shane Kimbrough (left), Steve Bowen (center) and Heidemarie Stefanyshyn-Piper (right) look over tools required for the mission. Members of space shuttle Endeavour's STS-126 crew are at Kennedy to participate in a crew equipment interface test, or CEIT. The CEIT provides experience handling tools, equipment and hardware they will use on the mission. Endeavour will deliver a multi-purpose logistics module to the International Space Station on the STS-126 mission. Launch is targeted for Nov. 10. Photo credit: NASA/Kim Shiflett KSC-08pd2244

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility 2 at NASA's Kennedy Space Center, STS-126 crew members are lowered inside space shuttle Endeavour's payload bay to inspect hardware like the shuttle's robotic arm and orbiter boom sensor system. Members of space shuttle Endeavour's STS-126 crew are at Kennedy to participate in a crew equipment interface test, or CEIT. The CEIT provides experience handling tools, equipment and hardware they will use on the mission. Endeavour will deliver a multi-purpose logistics module to the International Space Station on the STS-126 mission. Launch is targeted for Nov. 10. Photo credit: NASA/Kim Shiflett KSC-08pd2256

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility 2 at NASA's Kennedy Space Center, STS-126 Commander Chris Ferguson is seen in the mid-deck of space shuttle Endeavour during inspection of hardware. Members of space shuttle Endeavour's STS-126 crew are at Kennedy to participate in a crew equipment interface test, or CEIT. The CEIT provides experience handling tools, equipment and hardware they will use on the mission. Endeavour will deliver a multi-purpose logistics module to the International Space Station on the STS-126 mission. Launch is targeted for Nov. 10. Photo credit: NASA/Kim Shiflett KSC-08pd2254

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility 2 at NASA's Kennedy Space Center, STS-126 Pilot Eric Boe inspects the cockpit window of space shuttle Endeavour. Behind him is Commander Chris Ferguson. Members of space shuttle Endeavour's STS-126 crew are at Kennedy to participate in a crew equipment interface test, or CEIT. The CEIT provides experience handling tools, equipment and hardware they will use on the mission. Endeavour will deliver a multi-purpose logistics module to the International Space Station on the STS-126 mission. Launch is targeted for Nov. 10. Photo credit: NASA/Kim Shiflett KSC-08pd2249

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility 2 at NASA's Kennedy Space Center, STS-126 Mission Specialists (from left) Steve Bowen, Shane Kimbrough and Heidemarie Stefanyshyn-Piper handle tools required for the mission. Members of space shuttle Endeavour's STS-126 crew are at Kennedy to participate in a crew equipment interface test, or CEIT. The CEIT provides experience handling tools, equipment and hardware they will use on the mission. Endeavour will deliver a multi-purpose logistics module to the International Space Station on the STS-126 mission. Launch is targeted for Nov. 10. Photo credit: NASA/Kim Shiflett KSC-08pd2246

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility 2 at NASA's Kennedy Space Center, STS-126 Commander Chris Ferguson (left) and Mission Specialists Shane Kimbrough and Steve Bowen get a close look at hardware inside space shuttle Endeavour's payload bay. Members of space shuttle Endeavour's STS-126 crew are at Kennedy to participate in a crew equipment interface test, or CEIT. The CEIT provides experience handling tools, equipment and hardware they will use on the mission. Endeavour will deliver a multi-purpose logistics module to the International Space Station on the STS-126 mission. Launch is targeted for Nov. 10. Photo credit: NASA/Kim Shiflett KSC-08pd2253

description

Summary

CAPE CANAVERAL, Fla. – In Orbiter Processing Facility 2 at NASA's Kennedy Space Center, STS-126 Commander Chris Ferguson (left) and Mission Specialists Shane Kimbrough and Steve Bowen get a close look at hardware inside space shuttle Endeavour's payload bay. Members of space shuttle Endeavour's STS-126 crew are at Kennedy to participate in a crew equipment interface test, or CEIT. The CEIT provides experience handling tools, equipment and hardware they will use on the mission. Endeavour will deliver a multi-purpose logistics module to the International Space Station on the STS-126 mission. Launch is targeted for Nov. 10. Photo credit: NASA/Kim Shiflett

The Space Shuttle program was the United States government's manned launch vehicle program from 1981 to 2011, administered by NASA and officially beginning in 1972. The Space Shuttle system—composed of an orbiter launched with two reusable solid rocket boosters and a disposable external fuel tank— carried up to eight astronauts and up to 50,000 lb (23,000 kg) of payload into low Earth orbit (LEO). When its mission was complete, the orbiter would re-enter the Earth's atmosphere and lands as a glider. Although the concept had been explored since the late 1960s, the program formally commenced in 1972 and was the focus of NASA's manned operations after the final Apollo and Skylab flights in the mid-1970s. It started with the launch of the first shuttle Columbia on April 12, 1981, on STS-1. and finished with its last mission, STS-135 flown by Atlantis, in July 2011.

Nothing Found.

label_outline

Tags

kennedy space center cape canaveral orbiter sts commander chris ferguson commander chris ferguson specialists shane kimbrough mission specialists shane kimbrough steve bowen steve bowen close hardware endeavour space shuttle endeavour payload bay payload bay equipment interface test crew equipment interface test ceit experience tools logistics module logistics module international space station launch crew members space shuttle high resolution nasa
date_range

Date

01/08/2008
collections

in collections

Space Shuttle Program

place

Location

create

Source

NASA
link

Link

https://images.nasa.gov/
copyright

Copyright info

Public Domain Dedication (CC0)

label_outline Explore Mission Specialists Shane Kimbrough, Shane, Kimbrough

KENNEDY SPACE CENTER, FLA. -- As part of Crew Equipment Interface Test (CEIT) activities at SPACEHAB, members of the STS-106 crew check out a Maximum Envelope Support Structure (MESS) rack they will be using during their mission to the International Space Station. Seen here (with backs to camera, in uniform) are Mission Specialist Richard A. Mastracchio, Pilot Scott D. Altman, Boris V. Morukov, and Edward T. Lu (at right). Also taking part in the CEIT are Commander Terrence W. Wilcutt and Mission Specialists Yuri I. Malenchenko and Daniel C. Burbank. Malenchenko and Morukov represent the Russian Aviation and Space Agency. STS-106 is scheduled to launch Sept. 8, 2000, at 8:31 a.m. EDT from Launch Pad 39B on an 11-day mission. The seven-member crew will prepare the Space Station for its first resident crew and begin outfitting the newly arrived Zvezda Service Module. They will perform support tasks on orbit, transfer supplies and prepare the Zvezda living quarters for the first long-duration crew, dubbed “Expedition One,” which is due to arrive at the Station in late fall KSC00pp0952

S126E007685 - STS-126 - Kimbrough on FD during Rendezvous and Docking OPS

KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facility at NASA's Kennedy Space Center, members of the STS-124 crew get a close look at equipment on the Japanese Experiment Module, called Kibo, including the Remote Manipulator System, or RMS, two robotic arms that support operations on the outside of the Kibo. Crew members are at Kennedy for a crew equipment interface test that includes familiarization with tools and equipment that will be used on the mission. The STS-124 mission is the second of three flights that will launch components to complete the Japanese pressurized module, the Kibo laboratory. The mission will include two spacewalks to install the new lab and its remote manipulator system. The lab's logistics module, which will have been installed in a temporary location during STS-123, will be attached to the new lab. Photo credit: NASA/Kim Shiflett KSC-08pd0058

S126E015021 - STS-126 - Bowen, Ferguson and Stefanyshyn-Piper on FD

KENNEDY SPACE CENTER, FLA. - In the Space Station Processing Facility at NASA's Kennedy Space Center, STS-115 Mission Specialist Daniel Burbank is practicing folding a sequential shunt unit launch to activation multilayer installation blanket. Burbank and other crew members are at the center for Crew Equipment Interface Test activities. Equipment familiarization is a routine part of astronaut training and launch preparations. The mission will deliver the second port truss segment, the P3/P4 Truss, to attach to the first port truss segment, the P1 Truss, as well as deploy solar array set 2A and 4A. Launch on Space Shuttle Atlantis is scheduled for late August. Photo credit: NASA/Kim Shiflett KSC-06pd1181

S132E013171 - STS-132 - Expedition 23 and STS-132 Crewmembers in the Node 2 during Joint Operations

S132E008106 - STS-132 - Bowen works with the Battery ORUs during EVA 1

s133E008642 - STS-133 - STS-133 / Expedition 26 on-orbit crew portrait

S135E012076 - STS-135 - Ferguson at his Station on the Flight Deck

S126E011536 - STS-126 - Fincke and Kimbrough in Node 2

S126E008344 - STS-126 - Stefanyshyn-Piper and Kimbrough during EVA 2

S135E006282 - STS-135 - Ferguson on Middeck

Topics

kennedy space center cape canaveral orbiter sts commander chris ferguson commander chris ferguson specialists shane kimbrough mission specialists shane kimbrough steve bowen steve bowen close hardware endeavour space shuttle endeavour payload bay payload bay equipment interface test crew equipment interface test ceit experience tools logistics module logistics module international space station launch crew members space shuttle high resolution nasa