visibility Similar

CAPE CANAVERAL, Fla. - A waning full moon bears witness to space shuttle Endeavour’s rollout from the Vehicle Assembly Building at NASA’s Kennedy Space Center, traveling at less than 1 mph atop a massive crawler-transporter. Endeavour sits on the mobile launcher platform with the crawler-transporter underneath. First motion was at 11:15 p.m. Sept. 18. Endeavour completed the 4.2-mile journey to Launch Pad 39B on Sept. 19 at 6:59 a.m. EDT. For the first time since July 2001, two shuttles are on the launch pads at the same time at the center. Endeavour will stand by at pad B in the unlikely event that a rescue mission is necessary during space shuttle Atlantis' upcoming mission to repair NASA's Hubble Space Telescope, targeted to launch Oct. 10. After Endeavour is cleared from its duty as a rescue spacecraft, it will be moved to Launch Pad 39A for the STS-126 mission to the International Space Station. That flight is targeted for launch Nov. 12. Photo credit: NASA/Dimitri Gerondidakis KSC-08pd2664

STS-132 Space Shuttle Atlantis. NASA public domain image colelction.

STS-130 - EOM - Public domain NASA photogrpaph

KENNEDY SPACE CENTER, FLA. -- The Space Shuttle Columbia continues its morning rollout from the Vehicle Assembly Building to Launch Pad 39B in preparation for the STS-90 mission. The Neurolab experiments are the primary payload on this nearly 17-day space flight. Investigations during the Neurolab mission will focus on the effects of microgravity on the nervous system. Specifically, experiments will study the adaptation of the vestibular system, the central nervous system, and the pathways that control the ability to sense location in the absence of gravity, as well as the effect of microgravity on a developing nervous system. The crew of STS-90, slated for launch April 16 at 2:19 p.m. EDT, includes Commander Richard Searfoss, Pilot Scott Altman, Mission Specialists Richard Linnehan, Dafydd (Dave) Williams, M.D., and Kathryn (Kay) Hire, and Payload Specialists Jay Buckey, M.D., and James Pawelczyk, Ph.D KSC-98pc402

STS-133 - EOM - Public domain NASA photogrpaph

After sunup, which is obscured by a cloud-filled sky, Space Shuttle Discovery waits atop the mobile launcher platform for launch of mission STS-103. At the top is seen the external tank gaseous oxygen vent arm system with the vent hood (commonly called the "beanie cap") poised above the external tank. The retractable arm and the beanie cap are designed to vent gaseous oxygen vapors away from the Space Shuttle. The arm truss section is 65 feet long and the diameter of the vent hood is 13 feet. Extending toward the cabin of the orbiter below is the orbiter access arm, with the environmental chamber (called the White Room) at the end. Through this chamber the crew enters the orbiter. The STS-103 mission, to service the Hubble Space Telescope, is scheduled for launch Dec. 17 at 8:47 p.m. EST. Mission objectives include replacing gyroscopes and an old computer, installing another solid state recorder, and replacing damaged insulation in the telescope. The mission is expected to last about 8 days and 21 hours. Discovery is expected to land at KSC Sunday, Dec. 26, at about 6:25 p.m. EST KSC-99padig047

STS-131 - LAUNCH - Public domain NASA photogrpaph

KENNEDY SPACE CENTER, FLA. -- Space Shuttle Discovery sits atop a mobile launcher platform at Launch Complex 39A after its move this morning from Vehicle Assembly Building high bay 1, where it was mated to the first Space Shuttle super lightweight external tank/solid rocket booster stack. The Orbiter Access Arm, with the white room located at its outer end, is being positioned into place on the orbiter. This white room provides personnel entry into the orbiter while it is on the pad. Discovery will be launched on mission STS-91, concluding Phase I of the joint U.S.-Russian International Space Station Program, on June 2 with a launch window opening around 6:10 p.m. EDT. This will be the ninth Shuttle docking with the Russian Space Station Mir, but the first Mir docking for Discovery. The STS-91 flight crew includes Commander Charles Precourt; Pilot Dominic Gorie; and Mission Specialists Wendy B. Lawrence; Franklin Chang-Diaz, Ph.D.; Janet Kavandi, Ph.D.; and Valery Ryumin, with the Russian Space Agency. Andrew Thomas, Ph.D., will be returning to Earth with the crew after living more than four months aboard Mir KSC-98pc569

Landing of the STS-114 orbiter Discovery

code Related

CAPE CANAVERAL, Fla. -- Against a clear blue Florida sky and the blue Atlantic Ocean, space shuttle Discovery hurtles toward space on its STS-124 mission to the International Space Station. Launch was on time at 5:02 p.m. EDT. Discovery is making its 35th flight. The STS-124 mission is the 26th in the assembly of the space station. It is the second of three flights launching components to complete the Japan Aerospace Exploration Agency's Kibo laboratory. The shuttle crew will install Kibo's large Japanese Pressurized Module and its remote manipulator system, or RMS. The 14-day flight includes three spacewalks. Photo credit: courtesy of Scott Andrews KSC-08pd1529

CAPE CANAVERAL, Fla. -- Space shuttle Discovery leaps from the billows of smoke below into a clear blue sky over Central Florida on its STS-124 mission to the International Space Station. Launch was on time at 5:02 p.m. EDT. Discovery is making its 35th flight. The STS-124 mission is the 26th in the assembly of the space station. It is the second of three flights launching components to complete the Japan Aerospace Exploration Agency's Kibo laboratory. The shuttle crew will install Kibo's large Japanese Pressurized Module and its remote manipulator system, or RMS. The 14-day flight includes three spacewalks. Photo credit: NASA/Fletch Hildreth KSC-08pd1523

CAPE CANAVERAL, Fla. -- Space shuttle Discovery erupts from the billowing steam below and leaps into a clear blue sky over Central Florida on its STS-124 mission to the International Space Station. Launch was on time at 5:02 p.m. EDT. Discovery is making its 35th flight. The STS-124 mission is the 26th in the assembly of the space station. It is the second of three flights launching components to complete the Japan Aerospace Exploration Agency's Kibo laboratory. The shuttle crew will install Kibo's large Japanese Pressurized Module and its remote manipulator system, or RMS. The 14-day flight includes three spacewalks. Photo credit: NASA/Jim Grossmann KSC-08pd1527

CAPE CANAVERAL, Fla. -- Atop a column of fire, space shuttle Discovery hurtles into a clear blue sky over Central Florida on its STS-124 mission to the International Space Station. Launch was on time at 5:02 p.m. EDT. Discovery is making its 35th flight. The STS-124 mission is the 26th in the assembly of the space station. It is the second of three flights launching components to complete the Japan Aerospace Exploration Agency's Kibo laboratory. The shuttle crew will install Kibo's large Japanese Pressurized Module and its remote manipulator system, or RMS. The 14-day flight includes three spacewalks. Photo credit: courtesy of Scott Andrews KSC-08pd1528

CAPE CANAVERAL, Fla. -- Space shuttle Discovery soars above the branches as it hurtles into the sky on a column of flame and smoke on its STS-124 mission to the International Space Station. Launch was on time at 5:02 p.m. EDT. Discovery is making its 35th flight. The STS-124 mission is the 26th in the assembly of the space station. It is the second of three flights launching components to complete the Japan Aerospace Exploration Agency's Kibo laboratory. The shuttle crew will install Kibo's large Japanese Pressurized Module and its remote manipulator system, or RMS. The 14-day flight includes three spacewalks. Photo credit: NASA/Sandra Joseph, Tony Gray, Robert Murray, Mike Kerley KSC-08pd1544

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center, sparks fly beneath space shuttle Discovery as engines ignite for the liftoff on mission STS-124. Launch was on time at 5:02 p.m. EDT. Discovery is making its 35th flight. The STS-124 mission is the 26th in the assembly of the space station. It is the second of three flights launching components to complete the Japan Aerospace Exploration Agency's Kibo laboratory. The shuttle crew will install Kibo's large Japanese Pressurized Module and its remote manipulator system, or RMS. The 14-day flight includes three spacewalks. Photo courtesy of Scott Andrews KSC-08pd1577

CAPE CANAVERAL, Fla. -- Space shuttle Discovery is silhouetted against the clear blue Florida sky as it hurtles toward space on its STS-124 mission to the International Space Station. Beneath the main engine nozzles can be seen the blue cones of light, the shock or mach diamonds that are a formation of shock waves in the exhaust plume of an aerospace propulsion system. Liftoff was on time at 5:02 p.m. EDT. Discovery is making its 35th flight. The STS-124 mission is the 26th in the assembly of the space station. It is the second of three flights launching components to complete the Japan Aerospace Exploration Agency's Kibo laboratory. The shuttle crew will install Kibo's large Japanese Pressurized Module and its remote manipulator system, or RMS. The 14-day flight includes three spacewalks. Photo credit: NASA/Jerry Cannon, George Roberts KSC-08pd1556

CAPE CANAVERAL, Fla. -- At this angle, the columns of fire below space shuttle Discovery's solid rocket boosters appear to jettison pink smoke as the shuttle hurtles into space on its STS-124 mission. Liftoff from Launch Pad 39A at NASA's Kennedy Space Center was on time at 5:02 p.m. EDT. Discovery is making its 35th flight. The STS-124 mission is the 26th in the assembly of the space station. It is the second of three flights launching components to complete the Japan Aerospace Exploration Agency's Kibo laboratory. The shuttle crew will install Kibo's large Japanese Pressurized Module and its remote manipulator system, or RMS. The 14-day flight includes three spacewalks. Photo credit: NASA/Jerry Cannon, George Roberts KSC-08pd1558

CAPE CANAVERAL, Fla. -- The launch of space shuttle Discovery on its STS-124 mission is seen through the windows of the firing room at NASA's Kennedy Space Center. Launch was on time at 5:02 p.m. EDT. Discovery is making its 35th flight. The STS-124 mission is the 26th in the assembly of the space station. It is the second of three flights launching components to complete the Japan Aerospace Exploration Agency's Kibo laboratory. The shuttle crew will install Kibo's large Japanese Pressurized Module and its remote manipulator system, or RMS. The 14-day flight includes three spacewalks. Photo credit: NASA/Kim Shiflett KSC-08pd1535

CAPE CANAVERAL, Fla. -- Space shuttle Discovery is silhouetted against the clear blue Florida sky as it hurtles toward space on its STS-124 mission to the International Space Station. Liftoff was on time at 5:02 p.m. EDT. Discovery is making its 35th flight. The STS-124 mission is the 26th in the assembly of the space station. It is the second of three flights launching components to complete the Japan Aerospace Exploration Agency's Kibo laboratory. The shuttle crew will install Kibo's large Japanese Pressurized Module and its remote manipulator system, or RMS. The 14-day flight includes three spacewalks. Photo credit: NASA/Jerry Cannon, George Roberts KSC-08pd1555

description

Summary

CAPE CANAVERAL, Fla. -- Space shuttle Discovery is silhouetted against the clear blue Florida sky as it hurtles toward space on its STS-124 mission to the International Space Station. Liftoff was on time at 5:02 p.m. EDT. Discovery is making its 35th flight. The STS-124 mission is the 26th in the assembly of the space station. It is the second of three flights launching components to complete the Japan Aerospace Exploration Agency's Kibo laboratory. The shuttle crew will install Kibo's large Japanese Pressurized Module and its remote manipulator system, or RMS. The 14-day flight includes three spacewalks. Photo credit: NASA/Jerry Cannon, George Roberts

The Space Shuttle program was the United States government's manned launch vehicle program from 1981 to 2011, administered by NASA and officially beginning in 1972. The Space Shuttle system—composed of an orbiter launched with two reusable solid rocket boosters and a disposable external fuel tank— carried up to eight astronauts and up to 50,000 lb (23,000 kg) of payload into low Earth orbit (LEO). When its mission was complete, the orbiter would re-enter the Earth's atmosphere and lands as a glider. Although the concept had been explored since the late 1960s, the program formally commenced in 1972 and was the focus of NASA's manned operations after the final Apollo and Skylab flights in the mid-1970s. It started with the launch of the first shuttle Columbia on April 12, 1981, on STS-1. and finished with its last mission, STS-135 flown by Atlantis, in July 2011.

Nothing Found.

label_outline

Tags

kennedy space center cape canaveral discovery sky florida sky hurtles sts international space station liftoff three flights components japan aerospace exploration japan aerospace exploration agency kibo laboratory kibo laboratory crew shuttle crew japanese module manipulator system manipulator system rms spacewalks three spacewalks jerry cannon george roberts george roberts ksc space shuttle high resolution nasa
date_range

Date

31/05/2008
collections

in collections

Space Shuttle Program

place

Location

Cape Canaveral, FL
create

Source

NASA
link

Link

https://images.nasa.gov/
copyright

Copyright info

Public Domain Dedication (CC0)

label_outline Explore George Roberts Ksc, Florida Sky, Hurtles

KENNEDY SPACE CENTER, FLA. -- In Orbiter Processing Facility Bay 3, the new orbital boom sensor system is lowered into Discovery’s payload bay. The previous boom was removed for repairs on the manipulator positioning mechanism, the pedestals that hold the boom in place in the payload bay. Discovery is the designated orbiter for the second return-to-flight mission, STS-121. The mission is scheduled no earlier than mid-May. KSC-05pd2609

CAPE CANAVERAL, Fla. – Space shuttle Discovery is towed from the Shuttle Landing Facility at NASA's Kennedy Space Center. Discovery's landing ended the 14-day, STS-124 mission to the International Space Station. The STS-124 mission delivered the Japan Aerospace Exploration Agency's large Japanese Pressurized Module and its remote manipulator system to the space station. The landing was on time at 11:15 a.m. EDT. Photo credit: NASA/Jim Grossmann KSC-08pd1738

KENNEDY SPACE CENTER, FLA. -- Flames from the solid rocket boosters on space shuttle Endeavour light up Launch Pad 39A as the vehicle races into the night sky on mission STS-123. The liftoff was on time at 2:28 a.m. EDT. Endeavour's crew will make a record-breaking 16-day mission to the International Space Station and deliver the first section of the Japan Aerospace Exploration Agency's Kibo laboratory and the Canadian Space Agency's two-armed robotic system, Dextre. Photo credit: NASA/Sandra Joseph, Tony Gray, Robert Murray KSC-08pp0753

S130E010351 - STS-130 - Noguchi Takes Photos in the Cupola

CAPE CANAVERAL, Fla. – Space shuttle Atlantis' external fuel tank-solid rocket booster stack, atop a mobile launcher platform, presents an unusual sight – without the shuttle – as it is transferred from high bay 1 to high bay 3 in the Vehicle Assembly Building at NASA's Kennedy Space Center. It is being moved to high bay 3 to make room for the ET-SRB stack for space shuttle Endeavour. Atlantis is targeted for launch on the STS-125 mission on May 12 to service NASA's Hubble Space Telescope. Endeavour will fly on the STS-127 mission to the International Space Station and bring the final segments for Japan's Kibo laboratory. Photo credit: NASA/Tim Jacobs KSC-2009-1522

KENNEDY SPACE CENTER, Fla. -- Billows of smoke and steam roll away from Launch Pad 39B as Space Shuttle Endeavour hurtles into space on mission STS-108. The second attempt in two days, liftoff occurred at 5:19:28 p.m. EST (22:19.28 GMT). Endeavour will dock with the International Space Station on Dec. 7. STS-108 is the final Shuttle mission of 2001and the 107th Shuttle flight overall. It is the 12th flight to the Space Station. Landing of the orbiter at KSC's Shuttle Landing Facility is targeted for 1:05 p.m. EST (18:05 p.m. GMT) Dec. 16 KSC-01pp1789

KENNEDY SPACE CENTER, FLA. -- A mirror image of space shuttle Endeavour's liftoff on the STS-123 mission is captured in the water near Launch Pad 39A. Liftoff was on time at 2:28 a.m. EDT. The crew will make a record-breaking 16-day mission to the International Space Station and deliver the first section of the Japan Aerospace Exploration Agency's Kibo laboratory and the Canadian Space Agency's two-armed robotic system, Dextre. Photo credit: NASA/Sandra Joseph, Tony Gray, Robert Murray KSC-08pd0710

STS064-114-026 - STS-064 - SAFER,DTO 661,PC Lee and MS Meade on the Remote Manipulator System

STS064-22-014 - STS-064 - Remote Manipulator System controls

STS127-S-040 (15 July 2009) --- Space Shuttle Endeavour and its seven-member STS-127 crew head toward Earth orbit and rendezvous with the International Space Station. Liftoff was on time at 6:03 p.m. (EDT) on July 15, 2009 from launch pad 39A at NASA?s Kennedy Space Center. Onboard are astronauts Mark Polansky, commander; Doug Hurley, pilot; Christopher Cassidy, Tom Marshburn, Dave Wolf, Tim Kopra and Canadian Space Agency?s Julie Payette, all mission specialists. Kopra will join Expedition 20 in progress to serve as a flight engineer aboard the ISS. Endeavour will deliver the Japanese Experiment Module's Exposed Facility and the Experiment Logistics Module-Exposed Section in the final of three flights dedicated to the assembly of the Japan Aerospace Exploration Agency's Kibo laboratory complex on the space station. sts127-s-040

KENNEDY SPACE CENTER, FLA. -- The STS-117 crew members arrive at the KSC Shuttle Landing Facility aboard T-38 jet aircraft to prepare for launch on Space Shuttle Atlantis on June 8. Mission Specialist Steven Swanson is greeted by Shuttle Launch Director Mike Leinbach. Behind Swanson, at left, is Commander Frederick Sturckow; Mission Specialist Patrick Forrester is at center; Janet Petro, deputy director of Kennedy, is at right. During the 11-day mission and three spacewalks, the crew will work with flight controllers at NASA's Johnson Space Center in Houston to install a 17-ton segment on the station's girder-like truss and deploy a set of solar arrays, S3/S4. The mission will increase the space station's power capability in preparation for the arrival of new science modules from the European and Japanese space agencies. Photo credit: NASA/Kim Shiflett KSC-07pd1348

KENNEDY SPACE CENTER, FLA. -- Following the arrival of the STS-117 crew members at the KSC Shuttle Landing Facility, each briefly described their role on the mission. Here, astronaut Clayton Anderson takes his turn. Anderson will be on the mission to join the Expedition 15 crew on the International Space Station. During the 11-day mission and three spacewalks, the crew will work with flight controllers at NASA's Johnson Space Center in Houston to install a 17-ton segment on the station's girder-like truss and deploy a set of solar arrays, S3/S4. The mission will increase the space station's power capability in preparation for the arrival of new science modules from the European and Japanese space agencies. Photo credit: NASA/Kim Shiflett KSC-07pd1353

Topics

kennedy space center cape canaveral discovery sky florida sky hurtles sts international space station liftoff three flights components japan aerospace exploration japan aerospace exploration agency kibo laboratory kibo laboratory crew shuttle crew japanese module manipulator system manipulator system rms spacewalks three spacewalks jerry cannon george roberts george roberts ksc space shuttle high resolution nasa