visibility Similar

code Related

KENNEDY SPACE CENTER, FLA. -- The STS-117 crew members arrive at the KSC Shuttle Landing Facility aboard T-38 jet aircraft to prepare for launch on Space Shuttle Atlantis on June 8. Commander Frederick Sturckow is greeted by Janet Petro, deputy director of Kennedy. Astronaut Jerry Ross, chief of the Vehicle Integration Test Office at Johnson Space Center, looks on. During the 11-day mission and three spacewalks, the crew will work with flight controllers at NASA's Johnson Space Center in Houston to install a 17-ton segment on the station's girder-like truss and deploy a set of solar arrays, S3/S4. The mission will increase the space station's power capability in preparation for the arrival of new science modules from the European and Japanese space agencies. Photo credit: NASA/Kim Shiflett KSC-07pd1346

KENNEDY SPACE CENTER, FLA. -- The STS-117 crew members arrive at the KSC Shuttle Landing Facility aboard T-38 jet aircraft to prepare for launch on Space Shuttle Atlantis on June 8. Mission Specialist Patrick Forrester is welcomed by astronaut Jerry Ross, chief of the Vehicle Integration Test Office at Johnson Space Center. During the 11-day mission and three spacewalks, the crew will work with flight controllers at NASA's Johnson Space Center in Houston to install a 17-ton segment on the station's girder-like truss and deploy a set of solar arrays, S3/S4. The mission will increase the space station's power capability in preparation for the arrival of new science modules from the European and Japanese space agencies. Photo credit: NASA/Kim Shiflett KSC-07pd1347

KENNEDY SPACE CENTER, FLA. -- The STS-117 crew members arrive at the KSC Shuttle Landing Facility aboard T-38 jet aircraft to prepare for launch on Space Shuttle Atlantis on June 8. Still in the plane, Pilot Lee Archambault is greeted by astronaut Jerry Ross, chief of the Vehicle Integration Test Office at Johnson Space Center. During the 11-day mission and three spacewalks, the crew will work with flight controllers at NASA's Johnson Space Center in Houston to install a 17-ton segment on the station's girder-like truss and deploy a set of solar arrays, S3/S4. The mission will increase the space station's power capability in preparation for the arrival of new science modules from the European and Japanese space agencies. Photo credit: NASA/Kim Shiflett KSC-07pd1349

KENNEDY SPACE CENTER, FLA. -- The STS-117 crew members arrive at the KSC Shuttle Landing Facility aboard T-38 jet aircraft to prepare for launch on Space Shuttle Atlantis on June 8. Mission John "Danny" Olivas prepares to exit the plane. During the 11-day mission and three spacewalks, the crew will work with flight controllers at NASA's Johnson Space Center in Houston to install a 17-ton segment on the station's girder-like truss and deploy a set of solar arrays, S3/S4. The mission will increase the space station's power capability in preparation for the arrival of new science modules from the European and Japanese space agencies. Photo credit: NASA/Kim Shiflett KSC-07pd1351

KENNEDY SPACE CENTER, FLA. -- The STS-117 crew members arrive at the KSC Shuttle Landing Facility aboard T-38 jet aircraft to prepare for launch on Space Shuttle Atlantis on June 8. Mission Specialist James Reilly prepares to exit the plane. During the 11-day mission and three spacewalks, the crew will work with flight controllers at NASA's Johnson Space Center in Houston to install a 17-ton segment on the station's girder-like truss and deploy a set of solar arrays, S3/S4. The mission will increase the space station's power capability in preparation for the arrival of new science modules from the European and Japanese space agencies. Photo credit: NASA/Kim Shiflett KSC-07pd1350

KENNEDY SPACE CENTER, FLA. -- After their arrival at KSC, STS-117 crew members take part in a payload bay walkdown on Launch Pad 39A to look at the cargo in Space Shuttle Atlantis. In the bucket are Mission Specialists Patrick Forrester (with camera) and Steven Swanson (far right). The payload includes the S3/S4 integrated truss structure for the International Space Station. STS-117 is scheduled to launch at 7:38 p.m. June 8. During the 11-day mission and three spacewalks, the crew will work with flight controllers at NASA's Johnson Space Center in Houston to install the 17-ton segment on the station's girder-like truss and deploy the set of solar arrays, S3/S4. The mission will increase the space station's power capability in preparation for the arrival of new science modules from the European and Japanese space agencies. Photo credit: NASA/Kim Shiflett KSC-07pd1362

KENNEDY SPACE CENTER, FLA. -- The STS-117 mission crew pose for a photo on the KSC Shuttle Landing Facility after their arrival. From left are astronaut Clayton Anderson, Mission Specialists James Reilly, John "Danny" Olivas, Steven Swanson and Patrick Forrester, Pilot Lee Archambault and Commander Frederick Sturckow. Anderson will be on the mission to join the Expedition 15 crew on the International Space Station. During the 11-day mission and three spacewalks, the crew will work with flight controllers at NASA's Johnson Space Center in Houston to install a 17-ton segment on the station's girder-like truss and deploy a set of solar arrays, S3/S4. The mission will increase the space station's power capability in preparation for the arrival of new science modules from the European and Japanese space agencies. Photo credit: NASA/Kim Shiflett KSC-07pd1354

KENNEDY SPACE CENTER, FLA. -- After their arrival at KSC, STS-117 crew members take part in a payload bay walkdown on Launch Pad 39A to look at the cargo in Space Shuttle Atlantis. Seen here are Mission Specialists Patrick Forrester (left) and James Reilly. The payload includes the S3/S4 integrated truss structure for the International Space Station. STS-117 is scheduled to launch at 7:38 p.m. June 8. During the 11-day mission and three spacewalks, the crew will work with flight controllers at NASA's Johnson Space Center in Houston to install the 17-ton segment on the station's girder-like truss and deploy the set of solar arrays, S3/S4. The mission will increase the space station's power capability in preparation for the arrival of new science modules from the European and Japanese space agencies. Photo credit: NASA/Kim Shiflett KSC-07pd1358

KENNEDY SPACE CENTER, FLA. -- After their arrival at KSC, STS-117 crew members take part in a payload bay walkdown on Launch Pad 39A to look at the cargo in Space Shuttle Atlantis. Seen here is Mission Specialist Patrick Forrester. The payload includes the S3/S4 integrated truss structure for the International Space Station. STS-117 is scheduled to launch at 7:38 p.m. June 8. During the 11-day mission and three spacewalks, the crew will work with flight controllers at NASA's Johnson Space Center in Houston to install the 17-ton segment on the station's girder-like truss and deploy the set of solar arrays, S3/S4. The mission will increase the space station's power capability in preparation for the arrival of new science modules from the European and Japanese space agencies. Photo credit: NASA/Kim Shiflett KSC-07pd1365

KENNEDY SPACE CENTER, FLA. -- The STS-117 crew members arrive at the KSC Shuttle Landing Facility aboard T-38 jet aircraft to prepare for launch on Space Shuttle Atlantis on June 8. Mission Specialist Steven Swanson is greeted by Shuttle Launch Director Mike Leinbach. Behind Swanson, at left, is Commander Frederick Sturckow; Mission Specialist Patrick Forrester is at center; Janet Petro, deputy director of Kennedy, is at right. During the 11-day mission and three spacewalks, the crew will work with flight controllers at NASA's Johnson Space Center in Houston to install a 17-ton segment on the station's girder-like truss and deploy a set of solar arrays, S3/S4. The mission will increase the space station's power capability in preparation for the arrival of new science modules from the European and Japanese space agencies. Photo credit: NASA/Kim Shiflett KSC-07pd1348

description

Summary

KENNEDY SPACE CENTER, FLA. -- The STS-117 crew members arrive at the KSC Shuttle Landing Facility aboard T-38 jet aircraft to prepare for launch on Space Shuttle Atlantis on June 8. Mission Specialist Steven Swanson is greeted by Shuttle Launch Director Mike Leinbach. Behind Swanson, at left, is Commander Frederick Sturckow; Mission Specialist Patrick Forrester is at center; Janet Petro, deputy director of Kennedy, is at right. During the 11-day mission and three spacewalks, the crew will work with flight controllers at NASA's Johnson Space Center in Houston to install a 17-ton segment on the station's girder-like truss and deploy a set of solar arrays, S3/S4. The mission will increase the space station's power capability in preparation for the arrival of new science modules from the European and Japanese space agencies. Photo credit: NASA/Kim Shiflett

The Space Shuttle program was the United States government's manned launch vehicle program from 1981 to 2011, administered by NASA and officially beginning in 1972. The Space Shuttle system—composed of an orbiter launched with two reusable solid rocket boosters and a disposable external fuel tank— carried up to eight astronauts and up to 50,000 lb (23,000 kg) of payload into low Earth orbit (LEO). When its mission was complete, the orbiter would re-enter the Earth's atmosphere and lands as a glider. Although the concept had been explored since the late 1960s, the program formally commenced in 1972 and was the focus of NASA's manned operations after the final Apollo and Skylab flights in the mid-1970s. It started with the launch of the first shuttle Columbia on April 12, 1981, on STS-1. and finished with its last mission, STS-135 flown by Atlantis, in July 2011.

Space Shuttle Atlantis was a space shuttle that was operated by NASA as part of the Space Shuttle program. It was the fourth operational shuttle built, and the last one to be built before the program was retired in 2011. Atlantis was named after the first research vessel operated by the Woods Hole Oceanographic Institution, and it made its first flight in October 1985. Over the course of its career, Atlantis completed 33 missions and spent a total of 307 days in space. Its last mission was STS-135, which was the final mission of the Space Shuttle program. Atlantis is now on display at the Kennedy Space Center Visitor Complex in Florida. Space Shuttle Atlantis (Orbiter Vehicle Designation: OV-104) was one of the four first operational orbiters in the Space Shuttle fleet of NASA, the space agency of the United States. (The other two are Discovery and Endeavour.) Atlantis was the fourth operational shuttle built. Atlantis is named after a two-masted sailing ship that operated from 1930 to 1966 for the Woods Hole Oceanographic Institute. Atlantis performed well in 25 years of service, flying 33 missions.

Nothing Found.

label_outline

Tags

kennedy space center sts crew members ksc shuttle jet aircraft jet aircraft atlantis space shuttle atlantis specialist steven swanson mission specialist steven swanson launch director mike leinbach shuttle launch director mike leinbach commander frederick sturckow commander frederick sturckow patrick forrester mission specialist patrick forrester janet petro janet petro deputy deputy director spacewalks three spacewalks controllers flight controllers johnson johnson space center houston segment station girder like truss girder like truss arrays increase space station power capability power capability preparation science modules science modules european japanese agencies japanese space agencies space shuttle high resolution nasa
date_range

Date

1960 - 1969
collections

in collections

Space Shuttle Program

Space Shuttle Atlantis

The Fourth Pperational Shuttle Built
place

Location

create

Source

NASA
link

Link

https://images.nasa.gov/
copyright

Copyright info

Public Domain Dedication (CC0)

label_outline Explore Janet Petro, Mission Specialist Steven Swanson, Commander Frederick Sturckow

La fille mendiante mélodrame en trois actes et à spectacle

CAPE CANAVERAL, Fla. - In Orbiter Processing Facility 1 at NASA's Kennedy Space Center in Florida, United Space Alliance technicians, lying on a work platform, remove window #8 from the top of the crew module of space shuttle Atlantis. Inspection and maintenance of the crew module windows is standard procedure between shuttle missions. Atlantis is next slated to deliver an Integrated Cargo Carrier and Russian-built Mini Research Module to the International Space Station on the STS-132 mission. The second in a series of new pressurized components for Russia, the module will be permanently attached to the Zarya module. Three spacewalks are planned to store spare components outside the station, including six spare batteries, a boom assembly for the Ku-band antenna and spares for the Canadian Dextre robotic arm extension. A radiator, airlock and European robotic arm for the Russian Multi-purpose Laboratory Module also are payloads on the flight. Launch is targeted for May 14. Photo credit: NASA/Glenn Benson KSC-2010-1082

STS105-346-006 - STS-105 - Forrester opens a MISSE PEC installed on the ISS Airlock

DATE: 1-12-14 LOCATION: Bldg. 30 - FCR-1 (30M/231) SUBJECT: Expedition 38 flight controllers during Orbital Sciences' Cygnus approaching ISS and being grappled. PHOTOGRAPHER: Lauren Harnett jsc2014e005996

KENNEDY SPACE CENTER, Fla. -- The landing lights on Runway 15 cast a glow as Space Shuttle Atlantis approaches touchdown on KSC’s Shuttle Landing Facility to complete the 9-day, 20-hour, 9-minute-long STS-101 mission. At the controls are Commander James D. Halsell Jr. and Pilot Scott “Doc” Horowitz. Also onboard the orbiter are Mission Specialists Mary Ellen Weber, James S. Voss, Jeffrey N. Williams, Susan J. Helms and Yury Usachev of Russia. The crew is returning from the third flight to the International Space Station. This was the 98th flight in the Space Shuttle program and the 21st for Atlantis, also marking the 51st landing at KSC, the 22nd consecutive landing at KSC, the 14th nighttime landing in Shuttle history and the 29th in the last 30 Shuttle flights. Main gear touchdown was at 2:20:17 a.m. EDT May 29 , landing on orbit 155 of the mission. Nose gear touchdown was at 2:20:30 a.m. EDT, and wheel stop at 2:21:19 a.m. EDT KSC00pp0675

STS-98 Mission Specialist Marsha Ivins (left) speaks to astronaut Pam Melroy, who piloted the T-38 jet that brought Ivins to KSC. Ivins and other crew members Commander Ken Cockrell, Pilot Mark Polansky and Mission Specialists Robert Curbeam and Thomas Jones have returned to KSC to prepare for their launch to the International Space Station. The seventh construction flight to the Space Station, STS-98 will carry the U.S. Laboratory Destiny, a key module for space experiments. The 11-day mission includes three spacewalks to complete outside assembly and connection of electrical and plumbing lines between the laboratory, Station and a relocated Shuttle docking port. STS-98 is Ivins’ fifth space flight. Launch is targeted for Feb. 7 at 6:11 p.m. EST KSC01pp0226

STS105-345-012 - STS-105 - Forrester working with S0 cables on the LAB during EVA2

KENNEDY SPACE CENTER, FLA. - A Shuttle Training Aircraft (STA) taxis into the parking area of KSC's Shuttle Landing Facility. In the specially configured aircraft, STS-115 Commander Brent Jett and Pilot Christopher Ferguson practiced landing the shuttle this morning. STA practice is part of launch preparations. The STA is a Grumman American Aviation-built Gulf Stream II jet that was modified to simulate an orbiter’s cockpit, motion and visual cues, and handling qualities. In flight, the STA duplicates the orbiter’s atmospheric descent trajectory from approximately 35,000 feet altitude to landing on a runway. Because the orbiter is unpowered during re-entry and landing, its high-speed glide must be perfectly executed the first time. Mission STS-115 is scheduled to lift off about 12:29 p.m. Sept. 6. Mission managers cancelled Atlantis' first launch campaign due to a lightning strike at the pad and the passage of Tropical Storm Ernesto along Florida's east coast. The mission will deliver and install the 17-and-a-half-ton P3/P4 truss segment to the port side of the integrated truss system on the orbital outpost. The truss includes a new set of photovoltaic solar arrays. When unfurled to their full length of 240 feet, the arrays will provide additional power for the station in preparation for the delivery of international science modules over the next two years. STS-115 is expected to last 11 days and includes three scheduled spacewalks. Photo credit: NASA/Kim Shiflett KSC-06pd2033

La fille mendiante mélodrame en trois actes et à spectacle

STS105-304-021 - STS-105 - Forrester in the orbiter middeck

KENNEDY SPACE CENTER, FLA. - STS-113 Commander James Wetherbee is happy to suit up before launch. Wetherbee will be making his sixth Shuttle flight. The primary mission is bringing the Expedition 6 crew to the Station and returning the Expedition 5 crew to Earth. The major objective of the mission is delivery of the Port 1 (P1) Integrated Truss Assembly, which will be attached to the port side of the S0 truss. Three spacewalks are planned to install and activate the truss and its associated equipment. Launch of Space Shuttle Endeavour on mission STS-113 is scheduled for Nov. 11 at 12:58 a.m. EST. KSC-02pd1704

STS105-726-066 - STS-105 - Dark view of Forrester and ISS U.S. Laboratory, SSRMS and Airlock during EVA

Topics

kennedy space center sts crew members ksc shuttle jet aircraft jet aircraft atlantis space shuttle atlantis specialist steven swanson mission specialist steven swanson launch director mike leinbach shuttle launch director mike leinbach commander frederick sturckow commander frederick sturckow patrick forrester mission specialist patrick forrester janet petro janet petro deputy deputy director spacewalks three spacewalks controllers flight controllers johnson johnson space center houston segment station girder like truss girder like truss arrays increase space station power capability power capability preparation science modules science modules european japanese agencies japanese space agencies space shuttle high resolution nasa