visibility Similar

Icing Research Tunnel (IRT) "AB Corner" Rehabilitation

SECOND DROP TOWER FACILITY OPERATION

CAPE CANAVERAL, Fla. – Space shuttle Atlantis is suspended by crane over the transfer aisle in the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida. Next, Atlantis will be rotated to a vertical position, lifted over a transom and lowered onto a mobile launch platform in high bay 1. It then will be attached to an external fuel tank and pair of solid rocket boosters already secured to the platform. Rollout of the completed shuttle stack to Kennedy’s Launch Pad 39A, a significant milestone in launch processing activities, is planned for Oct. 13. Liftoff of Atlantis on its STS-129 mission to the International Space Station is targeted for 4:04 p.m. EST Nov. 12 during a 10-minute launch window. For information on the STS-129 mission and crew, visit http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts129/index.html. Photo credit: NASA/Troy Cryder KSC-2009-5337

New York City, [shortly before 10th anniversary of] September 11, 2001 terrorist attack: [site of the World Trade Center bombing; memorial to victims; surrounding environment; and urban vistas]

CAPE CANAVERAL, Fla. - On Launch Pad 39A at NASA's Kennedy Space Center in Florida, the Super Lightweight Interchangeable Carrier is installed behind the shuttle external airlock (top) in space shuttle Atlantis’ payload bay for the STS-125 mission. STS-125 is the fifth and final shuttle servicing mission for NASA’s Hubble Space Telescope. The payload comprises four carriers holding various equipment for the mission. Atlantis is targeted to launch Oct. 14 on the 11-day mission. Photo credit: NASA/Jack Pfaller KSC-08pd2953

Young Scientist Challenge. NASA public domain image colelction.

code Related

CAPE CANAVERAL, Fla. --- Inside the Vehicle Assembly Building at NASA's Kennedy Space Center, the external tank for space shuttle Discovery is lowered into a checkout cell for processing. The tank will be stacked with solid rocket boosters for Discovery's launch on the STS-124 mission. On the mission, the shuttle will transport the Kibo Japanese Experiment Module - Pressurized Module and the Japanese Remote Manipulator System. Launch is targeted for May 25. Photo credit: NASA/Jim Grossmann KSC-08pd0892

CAPE CANAVERAL, Fla. --- Inside the Vehicle Assembly Building at NASA's Kennedy Space Center, the external tank for space shuttle Discovery is lowered into a checkout cell for processing. The tank will be stacked with solid rocket boosters for Discovery's launch on the STS-124 mission. On the mission, the shuttle will transport the Kibo Japanese Experiment Module - Pressurized Module and the Japanese Remote Manipulator System. Launch is targeted for May 25. Photo credit: NASA/Jim Grossmann KSC-08pd0891

CAPE CANAVERAL, Fla. --- Inside the Vehicle Assembly Building at NASA's Kennedy Space Center, the external tank for space shuttle Discovery is lifted up into a checkout cell for processing. The tank will be stacked with solid rocket boosters for Discovery's launch on the STS-124 mission. On the mission, the shuttle will transport the Kibo Japanese Experiment Module - Pressurized Module and the Japanese Remote Manipulator System. Launch is targeted for May 25. Photo credit: NASA/Jim Grossmann KSC-08pd0890

CAPE CANAVERAL, Fla. --- Inside the Vehicle Assembly Building at NASA's Kennedy Space Center, the external tank for space shuttle Discovery has been lowered into a checkout cell for processing. It is surrounded by platforms for servicing. The tank will be stacked with solid rocket boosters for Discovery's launch on the STS-124 mission. On the mission, the shuttle will transport the Kibo Japanese Experiment Module - Pressurized Module and the Japanese Remote Manipulator System. Launch is targeted for May 25. Photo credit: NASA/Jim Grossmann KSC-08pd0894

CAPE CANAVERAL, Fla. --- Inside the Vehicle Assembly Building at NASA's Kennedy Space Center, the external tank for space shuttle Discovery is suspended over the transfer aisle as it is lifted up into a checkout cell for processing. The tank will be stacked with solid rocket boosters for Discovery's launch on the STS-124 mission. On the mission, the shuttle will transport the Kibo Japanese Experiment Module - Pressurized Module and the Japanese Remote Manipulator System. Launch is targeted for May 25. Photo credit: NASA/Jim Grossmann KSC-08pd0889

CAPE CANAVERAL, Fla. --- Inside the Vehicle Assembly Building at NASA's Kennedy Space Center, the external tank for space shuttle Discovery is suspended over the transfer aisle. The tank will be lifted up into a checkout cell for processing before being stacked with solid rocket boosters for Discovery's launch on the STS-124 mission. On the mission, the shuttle will transport the Kibo Japanese Experiment Module - Pressurized Module and the Japanese Remote Manipulator System. Launch is targeted for May 25. Photo credit: NASA/Jim Grossmann KSC-08pd0888

CAPE CANAVERAL, Fla. --- Inside the Vehicle Assembly Building at NASA's Kennedy Space Center, an overhead crane raises the external tank for space shuttle Discovery from its transporter. The tank will be lifted up into a checkout cell for processing before being stacked with solid rocket boosters for Discovery's launch on the STS-124 mission. On the mission, the shuttle will transport the Kibo Japanese Experiment Module - Pressurized Module and the Japanese Remote Manipulator System. Launch is targeted for May 25. Photo credit: NASA/Jim Grossmann KSC-08pd0886

CAPE CANAVERAL, Fla. --- Inside the Vehicle Assembly Building at NASA's Kennedy Space Center, an overhead crane raises the external tank for space shuttle Discovery to a vertical position. The tank will be lifted up into a checkout cell for processing before being stacked with solid rocket boosters for Discovery's launch on the STS-124 mission. On the mission, the shuttle will transport the Kibo Japanese Experiment Module - Pressurized Module and the Japanese Remote Manipulator System. Launch is targeted for May 25. Photo credit: NASA/Jim Grossmann KSC-08pd0887

CAPE CANAVERAL, Fla. – In high bay 3 of the Vehicle Assembly Building at NASA's Kennedy Space Center, space shuttle Discovery continues to be lowered onto the mobile launcher platform in front of the solid rocket boosters and external tank. The stacking is in preparation for the launch on the upcoming STS-124 mission to the International Space Station. On the mission, the STS-124 crew will transport the Japanese Experiment Module - Pressurized Module and the Japanese Remote Manipulator System to the space station. Launch of Discovery is targeted for May 31 Photo credit: NASA/Jim Grossmann KSC-08pd1050

CAPE CANAVERAL, Fla. --- Inside the Vehicle Assembly Building at NASA's Kennedy Space Center, the external tank for space shuttle Discovery is lowered into a checkout cell for processing. The tank will be stacked with solid rocket boosters for Discovery's launch on the STS-124 mission. On the mission, the shuttle will transport the Kibo Japanese Experiment Module - Pressurized Module and the Japanese Remote Manipulator System. Launch is targeted for May 25. Photo credit: NASA/Jim Grossmann KSC-08pd0893

description

Summary

CAPE CANAVERAL, Fla. --- Inside the Vehicle Assembly Building at NASA's Kennedy Space Center, the external tank for space shuttle Discovery is lowered into a checkout cell for processing. The tank will be stacked with solid rocket boosters for Discovery's launch on the STS-124 mission. On the mission, the shuttle will transport the Kibo Japanese Experiment Module - Pressurized Module and the Japanese Remote Manipulator System. Launch is targeted for May 25. Photo credit: NASA/Jim Grossmann

The Space Shuttle program was the United States government's manned launch vehicle program from 1981 to 2011, administered by NASA and officially beginning in 1972. The Space Shuttle system—composed of an orbiter launched with two reusable solid rocket boosters and a disposable external fuel tank— carried up to eight astronauts and up to 50,000 lb (23,000 kg) of payload into low Earth orbit (LEO). When its mission was complete, the orbiter would re-enter the Earth's atmosphere and lands as a glider. Although the concept had been explored since the late 1960s, the program formally commenced in 1972 and was the focus of NASA's manned operations after the final Apollo and Skylab flights in the mid-1970s. It started with the launch of the first shuttle Columbia on April 12, 1981, on STS-1. and finished with its last mission, STS-135 flown by Atlantis, in July 2011.

Nothing Found.

label_outline

Tags

kennedy space center cape canaveral tank discovery space shuttle discovery checkout cell checkout cell rocket boosters rocket boosters sts transport kibo experiment module experiment module japanese manipulator system manipulator system launch jim grossmann space shuttle high resolution nasa
date_range

Date

28/03/2008
collections

in collections

Space Shuttle Program

place

Location

create

Source

NASA
link

Link

https://images.nasa.gov/
copyright

Copyright info

Public Domain Dedication (CC0)

label_outline Explore Checkout Cell, Experiment Module, Manipulator

41C-36-1612 - STS-41C - Deployment of the LDEF

TEST CELL SAFETY DOCUMENTATION, NASA Technology Images

STS052-45-026 - STS-052 - Views of the remote manipulator system mounted witness plates.

KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facility at NASA's Kennedy Space Center, members of the STS-124 crew get a close look at equipment on the Japanese Experiment Module, called Kibo, including the Remote Manipulator System, or RMS, two robotic arms that support operations on the outside of the Kibo. Crew members are at Kennedy for a crew equipment interface test that includes familiarization with tools and equipment that will be used on the mission. The STS-124 mission is the second of three flights that will launch components to complete the Japanese pressurized module, the Kibo laboratory. The mission will include two spacewalks to install the new lab and its remote manipulator system. The lab's logistics module, which will have been installed in a temporary location during STS-123, will be attached to the new lab. Photo credit: NASA/Kim Shiflett KSC-08pd0058

TEST CELL SAFETY DOCUMENTATION, NASA Technology Images

KENNEDY SPACE CENTER, FLA. -- In Orbiter Processing Facility Bay 3, the new orbital boom sensor system is lowered into Discovery’s payload bay. The previous boom was removed for repairs on the manipulator positioning mechanism, the pedestals that hold the boom in place in the payload bay. Discovery is the designated orbiter for the second return-to-flight mission, STS-121. The mission is scheduled no earlier than mid-May. KSC-05pd2609

SOLAR CELL ARRAY SHOWING DELAMINATION

STS065-37-004 - STS-065 - CCK - Mukai performs cell fixation operation at Workbench

Welders work with sheet metal used as blast deflectors at a test cell, part of the modifications being made to prepare for the arrival of new F-16 Fighting Falcon aircraft during the Commando Falcon project

STS052-39-032 - STS-052 - Witness plate material sample trays on the Remote Manipulator System.

STS072-360-011 - STS-072 - OAST-Flyer deploy

Hobson's cell in Morro Castle, Santiago, 1898

Topics

kennedy space center cape canaveral tank discovery space shuttle discovery checkout cell checkout cell rocket boosters rocket boosters sts transport kibo experiment module experiment module japanese manipulator system manipulator system launch jim grossmann space shuttle high resolution nasa