visibility Similar

CAPE CANAVERAL, Fla. -- Streams of smoke trail from the main landing gear tires as space shuttle Endeavour touches down on the Shuttle Landing Facility's Runway 15 at NASA's Kennedy Space Center in Florida for the final time. Main gear touchdown was at 2:34:51 a.m. EDT, followed by nose gear touchdown at 2:35:04 a.m., and wheelstop at 2:35:36 a.m. On board are STS-134 Commander Mark Kelly, Pilot Greg H. Johnson, and Mission Specialists Mike Fincke, Drew Feustel, Greg Chamitoff and the European Space Agency's Roberto Vittori. STS-134 delivered the Alpha Magnetic Spectrometer-2 (AMS) and the Express Logistics Carrier-3 (ELC-3) to the International Space Station. AMS will help researchers understand the origin of the universe and search for evidence of dark matter, strange matter and antimatter from the station. ELC-3 carried spare parts that will sustain station operations once the shuttles are retired from service. STS-134 was the 25th and final flight for Endeavour, which has spent 299 days in space, orbited Earth 4,671 times and traveled 122,883,151 miles. Photo credit: NASA/Tony Gray KSC-2011-4174

KENNEDY SPACE CENTER, FLA. - A booster rocket is prepared for lifting up the launch tower at Cape Canaveral Air Force Station. It is one of nine solid rocket boosters being erected and mated to the Delta II rocket for launch of NASA's Space Infrared Telescope Facility. The second stage will later be hoisted atop the first stage. SIRTF will obtain images and spectra by detecting the infrared energy, or heat, radiated by objects in space. Most of this infrared radiation is blocked by the Earth's atmosphere and cannot be observed from the ground. Consisting of an 0.85-meter telescope and three cryogenically cooled science instruments, SIRTF is one of NASA's largest infrared telescopes to be launched. KSC-03pd0674

The U.S. Air Force Thunderbirds perform their stunning

Expedition 64 Launch (NHQ202010140007)

STS-131 ET-135 MOVE TO TEST CELL 2010-1065

CAPE CANAVERAL, Fla. – In the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida, the external fuel tank for space shuttle Discovery's STS-131 mission, ET-135, is lifted above the transfer aisle for transfer into a test cell. The tank was delivered to Kennedy aboard the Pegasus barge from NASA's Michoud Assembly Facility on Dec. 26. The tank will remain in the test cell until it is transferred into a high bay for mating with the twin solid rocket boosters that will be used on the mission. Launch of the STS-131 mission to the International Space Station is targeted for March 18. For information on the STS-131 mission and crew, visit http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts131/index.html. Photo credit: NASA/Glenn Benson KSC-2010-1065

The Final Landing of STS-135 Atlantis

Ariane V Horizontal Separation System 3 (HSS3) Payload Fairing Separation Pre and Post Test Photo Documentation Inside Space Power Facility (SPF)

CAPE CANAVERAL, Fla. -- Xenon lights guide space shuttle Atlantis down on the Shuttle Landing Facility's Runway 15 at NASA's Kennedy Space Center in Florida for the final time. Securing the space shuttle fleet's place in history, Atlantis marked the 26th nighttime landing of NASA's Space Shuttle Program and the 78th landing at Kennedy. Main gear touchdown was at 5:57:00 a.m. EDT, followed by nose gear touchdown at 5:57:20 a.m., and wheelstop at 5:57:54 a.m. On board are STS-135 Commander Chris Ferguson, Pilot Doug Hurley, and Mission Specialists Sandra Magnus and Rex Walheim. On the 37th shuttle mission to the International Space Station, STS-135 delivered more than 9,400 pounds of spare parts, equipment and supplies in the Raffaello multi-purpose logistics module that will sustain station operations for the next year. STS-135 was the 33rd and final flight for Atlantis, which has spent 307 days in space, orbited Earth 4,848 times and traveled 125,935,769 miles. For more information visit, www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Frank Michaux KSC-2011-5632

code Related

CAPE CANAVERAL, Fla. --- Inside the Vehicle Assembly Building at NASA's Kennedy Space Center, the external tank for space shuttle Discovery is suspended over the transfer aisle. The tank will be lifted up into a checkout cell for processing before being stacked with solid rocket boosters for Discovery's launch on the STS-124 mission. On the mission, the shuttle will transport the Kibo Japanese Experiment Module - Pressurized Module and the Japanese Remote Manipulator System. Launch is targeted for May 25. Photo credit: NASA/Jim Grossmann KSC-08pd0888

CAPE CANAVERAL, Fla. --- Inside the Vehicle Assembly Building at NASA's Kennedy Space Center, the external tank for space shuttle Discovery has been lowered into a checkout cell for processing. It is surrounded by platforms for servicing. The tank will be stacked with solid rocket boosters for Discovery's launch on the STS-124 mission. On the mission, the shuttle will transport the Kibo Japanese Experiment Module - Pressurized Module and the Japanese Remote Manipulator System. Launch is targeted for May 25. Photo credit: NASA/Jim Grossmann KSC-08pd0894

CAPE CANAVERAL, Fla. --- Inside the Vehicle Assembly Building at NASA's Kennedy Space Center, the external tank for space shuttle Discovery is lowered into a checkout cell for processing. The tank will be stacked with solid rocket boosters for Discovery's launch on the STS-124 mission. On the mission, the shuttle will transport the Kibo Japanese Experiment Module - Pressurized Module and the Japanese Remote Manipulator System. Launch is targeted for May 25. Photo credit: NASA/Jim Grossmann KSC-08pd0891

CAPE CANAVERAL, Fla. --- Inside the Vehicle Assembly Building at NASA's Kennedy Space Center, an overhead crane raises the external tank for space shuttle Discovery from its transporter. The tank will be lifted up into a checkout cell for processing before being stacked with solid rocket boosters for Discovery's launch on the STS-124 mission. On the mission, the shuttle will transport the Kibo Japanese Experiment Module - Pressurized Module and the Japanese Remote Manipulator System. Launch is targeted for May 25. Photo credit: NASA/Jim Grossmann KSC-08pd0886

CAPE CANAVERAL, Fla. --- Inside the Vehicle Assembly Building at NASA's Kennedy Space Center, the external tank for space shuttle Discovery is lowered into a checkout cell for processing. The tank will be stacked with solid rocket boosters for Discovery's launch on the STS-124 mission. On the mission, the shuttle will transport the Kibo Japanese Experiment Module - Pressurized Module and the Japanese Remote Manipulator System. Launch is targeted for May 25. Photo credit: NASA/Jim Grossmann KSC-08pd0893

CAPE CANAVERAL, Fla. --- Inside the Vehicle Assembly Building at NASA's Kennedy Space Center, the external tank for space shuttle Discovery is lowered into a checkout cell for processing. The tank will be stacked with solid rocket boosters for Discovery's launch on the STS-124 mission. On the mission, the shuttle will transport the Kibo Japanese Experiment Module - Pressurized Module and the Japanese Remote Manipulator System. Launch is targeted for May 25. Photo credit: NASA/Jim Grossmann KSC-08pd0892

CAPE CANAVERAL, Fla. --- Inside the Vehicle Assembly Building at NASA's Kennedy Space Center, an overhead crane raises the external tank for space shuttle Discovery to a vertical position. The tank will be lifted up into a checkout cell for processing before being stacked with solid rocket boosters for Discovery's launch on the STS-124 mission. On the mission, the shuttle will transport the Kibo Japanese Experiment Module - Pressurized Module and the Japanese Remote Manipulator System. Launch is targeted for May 25. Photo credit: NASA/Jim Grossmann KSC-08pd0887

CAPE CANAVERAL, Fla. --- Inside the Vehicle Assembly Building at NASA's Kennedy Space Center, the external tank for space shuttle Discovery is lifted up into a checkout cell for processing. The tank will be stacked with solid rocket boosters for Discovery's launch on the STS-124 mission. On the mission, the shuttle will transport the Kibo Japanese Experiment Module - Pressurized Module and the Japanese Remote Manipulator System. Launch is targeted for May 25. Photo credit: NASA/Jim Grossmann KSC-08pd0890

CAPE CANAVERAL, Fla. -- In high bay 3 of the Vehicle Assembly Building at NASA's Kennedy Space Center, a crane lowers space shuttle Discovery toward the external tank and solid rocket boosters already stacked on the mobile launcher platform. The stacking and mating are in preparation for the launch on the upcoming STS-124 mission to the International Space Station. On the mission, the STS-124 crew will transport the Japanese Experiment Module - Pressurized Module and the Japanese Remote Manipulator System to the space station. Launch of Discovery is targeted for May 31 Photo credit: NASA/Jim Grossmann KSC-08pd1046

CAPE CANAVERAL, Fla. --- Inside the Vehicle Assembly Building at NASA's Kennedy Space Center, the external tank for space shuttle Discovery is suspended over the transfer aisle as it is lifted up into a checkout cell for processing. The tank will be stacked with solid rocket boosters for Discovery's launch on the STS-124 mission. On the mission, the shuttle will transport the Kibo Japanese Experiment Module - Pressurized Module and the Japanese Remote Manipulator System. Launch is targeted for May 25. Photo credit: NASA/Jim Grossmann KSC-08pd0889

description

Summary

CAPE CANAVERAL, Fla. --- Inside the Vehicle Assembly Building at NASA's Kennedy Space Center, the external tank for space shuttle Discovery is suspended over the transfer aisle as it is lifted up into a checkout cell for processing. The tank will be stacked with solid rocket boosters for Discovery's launch on the STS-124 mission. On the mission, the shuttle will transport the Kibo Japanese Experiment Module - Pressurized Module and the Japanese Remote Manipulator System. Launch is targeted for May 25. Photo credit: NASA/Jim Grossmann

The Space Shuttle program was the United States government's manned launch vehicle program from 1981 to 2011, administered by NASA and officially beginning in 1972. The Space Shuttle system—composed of an orbiter launched with two reusable solid rocket boosters and a disposable external fuel tank— carried up to eight astronauts and up to 50,000 lb (23,000 kg) of payload into low Earth orbit (LEO). When its mission was complete, the orbiter would re-enter the Earth's atmosphere and lands as a glider. Although the concept had been explored since the late 1960s, the program formally commenced in 1972 and was the focus of NASA's manned operations after the final Apollo and Skylab flights in the mid-1970s. It started with the launch of the first shuttle Columbia on April 12, 1981, on STS-1. and finished with its last mission, STS-135 flown by Atlantis, in July 2011.

label_outline

Tags

kennedy space center cape canaveral tank discovery space shuttle discovery transfer aisle transfer aisle checkout cell checkout cell rocket boosters rocket boosters sts transport kibo experiment module experiment module japanese manipulator system manipulator system launch jim grossmann space shuttle high resolution nasa
date_range

Date

1970 - 1979
collections

in collections

Space Shuttle Program

place

Location

create

Source

NASA
link

Link

https://images.nasa.gov/
copyright

Copyright info

Public Domain Dedication (CC0)

label_outline Explore Checkout Cell, Experiment Module, Transfer Aisle

Space Shuttle Atlantis, STS-45 Launch

KENNEDY SPACE CENTER, FLA. -- In Orbiter Processing Facility Bay 3, the new orbital boom sensor system is lowered into Discovery’s payload bay. The previous boom was removed for repairs on the manipulator positioning mechanism, the pedestals that hold the boom in place in the payload bay. Discovery is the designated orbiter for the second return-to-flight mission, STS-121. The mission is scheduled no earlier than mid-May. KSC-05pd2609

CAPE CANAVERAL, Fla. – Space shuttle Discovery is towed from the Shuttle Landing Facility at NASA's Kennedy Space Center. Discovery's landing ended the 14-day, STS-124 mission to the International Space Station. The STS-124 mission delivered the Japan Aerospace Exploration Agency's large Japanese Pressurized Module and its remote manipulator system to the space station. The landing was on time at 11:15 a.m. EDT. Photo credit: NASA/Jim Grossmann KSC-08pd1738

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, space shuttle Atlantis' main engines and solid rocket boosters ignite on Launch Pad 39A leaving behind a billow of steam as it lifts off on its STS-135 mission to the International Space Station. Atlantis with its crew of four; Commander Chris Ferguson, Pilot Doug Hurley, Mission Specialists Sandy Magnus and Rex Walheim, lifted off at 11:29 a.m. EDT on July 8, 2011 to deliver the Raffaello multi-purpose logistics module packed with supplies and spare parts for the International Space Station. Atlantis also will fly the Robotic Refueling Mission experiment that will investigate the potential for robotically refueling existing satellites in orbit. In addition, Atlantis will return with a failed ammonia pump module to help NASA better understand the failure mechanism and improve pump designs for future systems. STS-135 is the 33rd flight of Atlantis, the 37th shuttle mission to the space station, and the 135th and final mission of NASA's Space Shuttle Program. For more information, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Tony Gray and Kevin O'Connell KSC-2011-5422

S124E007722 - STS-124 - Rack installation in JPM

STS078-305-002 - STS-078 - BDPU, Henricks places new test chamber into experiment module in LMS-1 Spacelab

KENNEDY SPACE CENTER, FLA. -- Flames from the solid rocket boosters on space shuttle Endeavour light up Launch Pad 39A as the vehicle races into the night sky on mission STS-123. The liftoff was on time at 2:28 a.m. EDT. Endeavour's crew will make a record-breaking 16-day mission to the International Space Station and deliver the first section of the Japan Aerospace Exploration Agency's Kibo laboratory and the Canadian Space Agency's two-armed robotic system, Dextre. Photo credit: NASA/Sandra Joseph, Tony Gray, Robert Murray KSC-08pp0753

STS077-319-002 - STS-077 - CGBA - Commercial Generic Bioprocessing Apparatus

CAPE CANAVERAL, Fla. - In the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida, external fuel tank, ET-138, for space shuttle Atlantis' STS-135 mission, is lowered into high bay-1 for joining with the twin solid rocket boosters on the mobile launcher platform. Shuttle Atlantis' move, or "rollover," from Orbiter Processing Facility-1 to the VAB is targeted for May 10. Once there it will be mated with the external tank and boosters. Atlantis and its crew of four will deliver the Raffaello multipurpose logistics module packed with supplies and spare parts to the International Space Station. STS-135 is targeted to launch June 28, and will be the last spaceflight for the Space Shuttle Program. Photo credit: NASA/Jack Pfaller KSC-2011-3043

CAPE CANAVERAL, Fla. – In the Vehicle Assembly Building transfer aisle at NASA's Kennedy Space Center, the overhead crane lifts space shuttle Atlantis from its transporter. Atlantis will be raised to vertical for transfer to high bay 3. There it will be stacked with its external fuel tank and twin solid rocket boosters. After additional preparations are made, the shuttle will be rolled out to Launch Pad 39A to prepare for launch on the STS-125 mission targeted for 1:34 a.m. EDT Oct. 8. Photo credit: NASA/Dimitri Gerondidakis KSC-08pd2487

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, this overhead image shows the Space Shuttle Program's last external fuel tank, ET-122, after it was delivered to the transfer aisle of the Vehicle Assembly Building (VAB). The tank traveled 900 miles by sea, carried in the Pegasus Barge, from NASA's Michoud Assembly Facility in New Orleans. Once inside the VAB, it eventually will be attached to space shuttle Endeavour for the STS-134 mission to the International Space Station targeted to launch Feb. 2011. STS-134 currently is scheduled to be the last mission in the shuttle program. The tank, which is the largest element of the space shuttle stack, was damaged during Hurricane Katrina in August 2005 and restored to flight configuration by Lockheed Martin Space Systems Company employees. Photo credit: NASA/Kevin O'Connell KSC-2010-4912

S124E007721 - STS-124 - Rack installation in JPM

Topics

kennedy space center cape canaveral tank discovery space shuttle discovery transfer aisle transfer aisle checkout cell checkout cell rocket boosters rocket boosters sts transport kibo experiment module experiment module japanese manipulator system manipulator system launch jim grossmann space shuttle high resolution nasa