visibility Similar

KENNEDY SPACE CENTER, FLA. -- On its transporter, external tank No. 125 moves toward the Vehicle Assembly Building, at right. The tank arrived at the Launch Complex 39 Area turn basin on the Pegasus barge from the Michoud Assembly Facility near New Orleans. The external tank will be used on space shuttle Atlantis for mission STS-122 targeted for launch on Dec. 6. Photo credit: NASA/Troy Cryder KSC-07pd2468

X-34 rollout ceremony April 30, 1999

KENNEDY SPACE CENTER, FLA. -- Aboard a transporter, external tank No. 120 moves past the NASA News Center parking lot in the Launch Complex 39 Area to the Vehicle Assembly Building, at right. There it will be lifted into a checkout cell. The tank arrived from the Michoud Assembly Facility near New Orleans, making the journey around the Florida peninsula in tow by the JA Bisso II tugboat. ET-120 will be used for launching Space Shuttle Discovery on mission STS-120 in October. NASA/Amanda Diller KSC-07pd2138

STS-134 ET-138 OFFLOAD FROM PEGASUS BARGE - XFER TO VAB 2010-4069

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, space shuttle Atlantis' engines and solid rocket boosters ignite on Launch Pad 39A as it begins to lift off on its STS-135 mission to the International Space Station. Atlantis with its crew of four; Commander Chris Ferguson, Pilot Doug Hurley, Mission Specialists Sandy Magnus and Rex Walheim, lifted off at 11:29 a.m. EDT on July 8, 2011 to deliver the Raffaello multi-purpose logistics module packed with supplies and spare parts for the station. Atlantis also will fly the Robotic Refueling Mission experiment that will investigate the potential for robotically refueling existing satellites in orbit. In addition, Atlantis will return with a failed ammonia pump module to help NASA better understand the failure mechanism and improve pump designs for future systems. STS-135 is the 33rd flight of Atlantis, the 37th shuttle mission to the space station, and the 135th and final mission of NASA's Space Shuttle Program. For more information, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Tony Gray and Tom Farrar KSC-2011-5405

code Related

KENNEDY SPACE CENTER, FLA. - External tank No. 123 makes the turn toward the Vehicle Assembly Building after being offloaded from the Pegasus barge in the turn basin at the Launch Complex 39 Area. Once inside the VAB, the tank will be lifted into a checkout cell for further work. Shipped from NASA's Michoud Assembly Facility in New Orleans, the tank has undergone major safety changes, including removal of the protuberance air load ramps. It is designated to launch Space Shuttle Discovery on mission STS-116 in December. Mission STS-116 will deliver the P5 truss segment, a SPACEHAB module and other key components to the International Space Station. Launch is currently scheduled no earlier than Dec. 14. Photo credit: NASA/Jack Pfaller KSC-06pd2179

KENNEDY SPACE CENTER, FLA. - External tank No. 123 heads into the open doorway of the Vehicle Assembly Building. Once inside the VAB, the tank will be lifted into a checkout cell for further work. Shipped from NASA's Michoud Assembly Facility in New Orleans aboard the Pegasus barge, the tank has undergone major safety changes, including removal of the protuberance air load ramps. It is designated to launch Space Shuttle Discovery on mission STS-116 in December. Mission STS-116 will deliver the P5 truss segment, a SPACEHAB module and other key components to the International Space Station. Launch is currently scheduled no earlier than Dec. 14. Photo credit: NASA/Jack Pfaller KSC-06pd2182

KENNEDY SPACE CENTER, FLA. - External tank No. 123 is offloaded from the Pegasus barge in the turn basin at the Launch Complex 39 Area. Designated to launch Space Shuttle Discovery on mission STS-116 in December, the tank is being moved to the Vehicle Assembly Building where it will be lifted into a checkout cell for further work. The tank, which was shipped from NASA's Michoud Assembly Facility in New Orleans, has undergone major safety changes, including removal of the protuberance air load ramps. Mission STS-116 will deliver the P5 truss segment, a SPACEHAB module and other key components to the International Space Station. Launch is currently scheduled no earlier than Dec. 14. Photo credit: NASA/Jack Pfaller KSC-06pd2177

KENNEDY SPACE CENTER, FLA. - External tank No. 123 heads toward the open doorway of the Vehicle Assembly Building. Once inside the VAB, the tank will be lifted into a checkout cell for further work. Shipped from NASA's Michoud Assembly Facility in New Orleans aboard the Pegasus barge, the tank has undergone major safety changes, including removal of the protuberance air load ramps. It is designated to launch Space Shuttle Discovery on mission STS-116 in December. Mission STS-116 will deliver the P5 truss segment, a SPACEHAB module and other key components to the International Space Station. Launch is currently scheduled no earlier than Dec. 14. Photo credit: NASA/Jack Pfaller KSC-06pd2181

KENNEDY SPACE CENTER, FLA. - External tank No. 123 is being transported from the Pegasus barge in the turn basin at the Launch Complex 39 Area to the Vehicle Assembly Building where it will be lifted into a checkout cell for further work. The tank, shipped from NASA's Michoud Assembly Facility in New Orleans, has undergone major safety changes, including removal of the protuberance air load ramps. It is designated to launch Space Shuttle Discovery on mission STS-116 in December. Mission STS-116 will deliver the P5 truss segment, a SPACEHAB module and other key components to the International Space Station. Launch is currently scheduled no earlier than Dec. 14. Photo credit: NASA/Jack Pfaller KSC-06pd2178

KENNEDY SPACE CENTER, FLA. - External tank No. 123 moves into the Vehicle Assembly Building where it will be lifted into a checkout cell for further work. Shipped from NASA's Michoud Assembly Facility in New Orleans aboard the Pegasus barge, the tank has undergone major safety changes, including removal of the protuberance air load ramps. It is designated to launch Space Shuttle Discovery on mission STS-116 in December. Mission STS-116 will deliver the P5 truss segment, a SPACEHAB module and other key components to the International Space Station. Launch is currently scheduled no earlier than Dec. 14. Photo credit: NASA/Jack Pfaller KSC-06pd2183

KENNEDY SPACE CENTER, FLA. - Inside the Pegasus barge can be seen external tank No. 123, designated to launch Space Shuttle Discovery on mission STS-116 in December. Now docked at the turn basin dock in the Launch Complex 39 Area at NASA's Kennedy Space Center, the barge was towed from NASA's Michoud Assembly Facility in New Orleans. The tank has undergone major safety changes, including removal of the protuberance air load ramps. The tank will be offloaded and transported to the Vehicle Assembly Building. Mission STS-116 will deliver the P5 truss segment, a SPACEHAB module and other key components to the International Space Station. Launch is currently scheduled no earlier than Dec. 14. Photo credit: NASA/George Shelton KSC-06pd2176

KENNEDY SPACE CENTER, FLA. - The Pegasus barge approaches the turn basin dock in the Launch Complex 39 Area at NASA's Kennedy Space Center. Onboard the barge is the external tank No. 123, designated to launch Space Shuttle Discovery on mission STS-116 in December. At left is the 525-foot-high Vehicle Assembly Building where the external tank will go after offloading from the barge. The tank, which was shipped from NASA's Michoud Assembly Facility in New Orleans, has undergone major safety changes, including removal of the protuberance air load ramps. Mission STS-116 will deliver the P5 truss segment, a SPACEHAB module and other key components to the International Space Station. Launch is currently scheduled no earlier than Dec. 14. Photo credit: NASA/George Shelton KSC-06pd2174

KENNEDY SPACE CENTER, FLA. - Tow boats secure the Pegasus barge at the turn basin dock in the Launch Complex 39 Area at NASA's Kennedy Space Center. Onboard the barge is the external tank No. 123, designated to launch Space Shuttle Discovery on mission STS-116 in December. At left is the 525-foot-high Vehicle Assembly Building where the external tank will go after offloading from the barge. The tank, which was shipped from NASA's Michoud Assembly Facility in New Orleans, has undergone major safety changes, including removal of the protuberance air load ramps. Mission STS-116 will deliver the P5 truss segment, a SPACEHAB module and other key components to the International Space Station. Launch is currently scheduled no earlier than Dec. 14. Photo credit: NASA/George Shelton KSC-06pd2175

KENNEDY SPACE CENTER, FLA. - External tank No. 123 makes the turn toward the Vehicle Assembly Building after being offloaded from the Pegasus barge in the turn basin at the Launch Complex 39 Area. Once inside the VAB, the tank will be lifted into a checkout cell for further work. Shipped from NASA's Michoud Assembly Facility in New Orleans, the tank has undergone major safety changes, including removal of the protuberance air load ramps. It is designated to launch Space Shuttle Discovery on mission STS-116 in December. Mission STS-116 will deliver the P5 truss segment, a SPACEHAB module and other key components to the International Space Station. Launch is currently scheduled no earlier than Dec. 14. Photo credit: NASA/Jack Pfaller KSC-06pd2180

description

Summary

KENNEDY SPACE CENTER, FLA. - External tank No. 123 makes the turn toward the Vehicle Assembly Building after being offloaded from the Pegasus barge in the turn basin at the Launch Complex 39 Area. Once inside the VAB, the tank will be lifted into a checkout cell for further work. Shipped from NASA's Michoud Assembly Facility in New Orleans, the tank has undergone major safety changes, including removal of the protuberance air load ramps. It is designated to launch Space Shuttle Discovery on mission STS-116 in December. Mission STS-116 will deliver the P5 truss segment, a SPACEHAB module and other key components to the International Space Station. Launch is currently scheduled no earlier than Dec. 14. Photo credit: NASA/Jack Pfaller

The Space Shuttle program was the United States government's manned launch vehicle program from 1981 to 2011, administered by NASA and officially beginning in 1972. The Space Shuttle system—composed of an orbiter launched with two reusable solid rocket boosters and a disposable external fuel tank— carried up to eight astronauts and up to 50,000 lb (23,000 kg) of payload into low Earth orbit (LEO). When its mission was complete, the orbiter would re-enter the Earth's atmosphere and lands as a glider. Although the concept had been explored since the late 1960s, the program formally commenced in 1972 and was the focus of NASA's manned operations after the final Apollo and Skylab flights in the mid-1970s. It started with the launch of the first shuttle Columbia on April 12, 1981, on STS-1. and finished with its last mission, STS-135 flown by Atlantis, in July 2011.

Nothing Found.

label_outline

Tags

ov 103 sts 116 et kennedy space center external tank external tank turn pegasus barge pegasus barge basin turn basin launch complex launch complex vab checkout cell checkout cell michoud new orleans safety changes safety changes protuberance air load ramps protuberance air load ramps discovery space shuttle discovery sts mission sts truss segment truss segment spacehab module spacehab module components international space station jack pfaller space shuttle vehicle assembly building high resolution nasa
date_range

Date

1960 - 1969
collections

in collections

Space Shuttle Program

place

Location

create

Source

NASA
link

Link

https://images.nasa.gov/
copyright

Copyright info

Public Domain Dedication (CC0)

label_outline Explore Ov 103 Sts 116 Et, Safety Changes, Protuberance Air Load Ramps

The fuselage of a C-5A Galaxy aircraft is moved to a permanent location after being given to the 94th Tactical Airlift Wing for refurbishing. The aircraft will be repainted and will have workable nose and tail ramps. The upper section will be made into classrooms and office space. Lockheed used the fuselage for fatigue testing

CAPE CANAVERAL, Fla. – The high-fidelity space shuttle model which was on display at the NASA Kennedy Space Center Visitor Complex in Florida seems out of place when viewed across the water of Kennedy's Launch Complex 39 turn basin. The Vehicle Assembly Building across the street towers 525 feet above it. The shuttle was part of a display at the visitor complex that also included an external tank and two solid rocket boosters that were used to show visitors the size of actual space shuttle components. The full-scale shuttle model is being transferred from Kennedy to Space Center Houston, NASA Johnson Space Center's visitor center. The model will stay at the turn basin for a few months until it is ready to be transported to Texas via barge. The move also helps clear the way for the Kennedy Space Center Visitor Complex to begin construction of a new facility next year to display space shuttle Atlantis in 2013. For more information about Space Center Houston, visit http://www.spacecenter.org. Photo credit: NASA/Dimitri Gerondidakis KSC-2011-8264

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, this overhead image shows the Space Shuttle Program's last external fuel tank, ET-122, after it was delivered to the transfer aisle of the Vehicle Assembly Building (VAB). The tank traveled 900 miles by sea, carried in the Pegasus Barge, from NASA's Michoud Assembly Facility in New Orleans. Once inside the VAB, it eventually will be attached to space shuttle Endeavour for the STS-134 mission to the International Space Station targeted to launch Feb. 2011. STS-134 currently is scheduled to be the last mission in the shuttle program. The tank, which is the largest element of the space shuttle stack, was damaged during Hurricane Katrina in August 2005 and restored to flight configuration by Lockheed Martin Space Systems Company employees. Photo credit: NASA/Kevin O'Connell KSC-2010-4912

A rainbow colored kite flying in the sky. Wind sock windspiel wind.

Saturn V S-1C Stages in Michoud Assembly Facility

This aerial photo shows the areas recently opened as part of KSC’s Safe Haven project. The curved road in the center is the newly restored crawlerway leading around the Vehicle Assembly Building (VAB) and Orbiter Processing Facility 3 (OPF-3) into the VAB high bay 2 (open on the lower right), where a mobile launcher platform/crawler-transporter currently sits. The Safe Haven project will enable the storage of orbiters during severe weather. OPF1 and OPF-2 are at the lower right. The crawlerway also extends from the east side of the VAB out to the two launch pads. Launch Pad 39A is visible to the left of the crawlerway. In the distance is the Atlantic Ocean. To the right of the VAB is the turn basin, into which ships tow the barge for offloading new external tanks from Louisiana KSC00pp0728

KENNEDY SPACE CENTER, FLA. -- Space Shuttle Atlantis passes the turn basin as it slowly wends its way toward Launch Pad 39A. First motion out of the Vehicle Assembly Building was at 8:19 a.m. The 3.4-mile trip to the pad along the crawlerway will take about 6 hours. The mission payload aboard Space Shuttle Atlantis is the S3/S4 integrated truss structure, along with a third set of solar arrays and batteries. The crew of six astronauts will install the truss to continue assembly of the International Space Station. Launch is targeted for March 15. Photo credit: NASA/Ken Thornsley KSC-07pd0390

U.S. Naval Base, Pearl Harbor, Ford Island Polaris Missile Lab & U.S. Fleet Ballistic Missile Submarine Training Center, Between Lexington Boulvevard and the sea plane ramps on the southwest side of Ford Island, Pearl City, Honolulu County, HI

CAPE CANAVERAL, Fla. – In the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida, the external fuel tank for space shuttle Atlantis' STS-125 mission is moved out of the checkout cell. The tank will be lowered into high bay 3 onto the mobile launcher platform and attached to the solid rocket boosters already installed. Atlantis' STS-125 mission is the fifth and final shuttle servicing mission to NASA’s Hubble Space Telescope. Launch is targeted for May 12. Photo credit: NASA/Jack Pfaller KSC-2009-1166

The Breitling Jet Team fly in synchronized formation

Trucks are driven aboard one of two tank landing ships with their bow ramps lowered to receive cargo during Exercise Solid Shield '85

A close up of a drill on a table. Drill milling milling machine, work.

Topics

ov 103 sts 116 et kennedy space center external tank external tank turn pegasus barge pegasus barge basin turn basin launch complex launch complex vab checkout cell checkout cell michoud new orleans safety changes safety changes protuberance air load ramps protuberance air load ramps discovery space shuttle discovery sts mission sts truss segment truss segment spacehab module spacehab module components international space station jack pfaller space shuttle vehicle assembly building high resolution nasa