KENNEDY SPACE CENTER, FLA. - A fish-eye view shows Space Shuttle Discovery moments after liftoff from Launch Pad 39B on the historic Return to Flight mission STS-114. At left is the Fixed Service Structure with the White Room appearing to be suspended in mid-air. The White Room provides the astronauts access into the orbiter. The liftoff occurred at 10:39 a.m. EDT. On this mission to the International Space Station the crew will perform inspections on-orbit for the first time of all of the Reinforced Carbon-Carbon (RCC) panels on the leading edge of the wings and the Thermal Protection System tiles using the new Canadian-built Orbiter Boom Sensor System and the data from 176 impact and temperature sensors. Mission Specialists will also practice repair techniques on RCC and tile samples during a spacewalk in the payload bay. During two additional spacewalks, the crew will install the External Stowage Platform-2, equipped with spare part assemblies, and a replacement Control Moment Gyroscope contained in the Lightweight Multi-Purpose Experiment Support Structure. The 12-day mission is expected to end with touchdown at the Shuttle Landing Facility on Aug. 7. KSC-05pp1772
Summary
KENNEDY SPACE CENTER, FLA. - A fish-eye view shows Space Shuttle Discovery moments after liftoff from Launch Pad 39B on the historic Return to Flight mission STS-114. At left is the Fixed Service Structure with the White Room appearing to be suspended in mid-air. The White Room provides the astronauts access into the orbiter. The liftoff occurred at 10:39 a.m. EDT. On this mission to the International Space Station the crew will perform inspections on-orbit for the first time of all of the Reinforced Carbon-Carbon (RCC) panels on the leading edge of the wings and the Thermal Protection System tiles using the new Canadian-built Orbiter Boom Sensor System and the data from 176 impact and temperature sensors. Mission Specialists will also practice repair techniques on RCC and tile samples during a spacewalk in the payload bay. During two additional spacewalks, the crew will install the External Stowage Platform-2, equipped with spare part assemblies, and a replacement Control Moment Gyroscope contained in the Lightweight Multi-Purpose Experiment Support Structure. The 12-day mission is expected to end with touchdown at the Shuttle Landing Facility on Aug. 7.
The Space Shuttle program was the United States government's manned launch vehicle program from 1981 to 2011, administered by NASA and officially beginning in 1972. The Space Shuttle system—composed of an orbiter launched with two reusable solid rocket boosters and a disposable external fuel tank— carried up to eight astronauts and up to 50,000 lb (23,000 kg) of payload into low Earth orbit (LEO). When its mission was complete, the orbiter would re-enter the Earth's atmosphere and lands as a glider. Although the concept had been explored since the late 1960s, the program formally commenced in 1972 and was the focus of NASA's manned operations after the final Apollo and Skylab flights in the mid-1970s. It started with the launch of the first shuttle Columbia on April 12, 1981, on STS-1. and finished with its last mission, STS-135 flown by Atlantis, in July 2011.
- File:STS-114 Shuttle Launch Wikipedia, 45% OFF
- File:STS-114 Shuttle launch closeup.jpg - Wikipedia
- Space Shuttle Readied As Rescue Ship, 42% OFF - Lanka.Tax
- Space Shuttle Readied As Rescue Ship
- File:STS-114 Shuttle Launch Wikipedia, 48% OFF - Formasup
- Space Shuttle Readied As Rescue Ship, 51% OFF
- File:STS-114 Shuttle Launch Wikipedia, 59% OFF
- Launch Of The Space Shuttle Discovery On Sts-91 By, 45% OFF
- Space Shuttle Readied As Rescue Ship | grupobsg.com.br
- Soichi Noguchi - Wikipedia