visibility Similar

code Related

A KSC solid rocket booster worker inspects the reusable cables and connectors located inside the external tank attachment ring on the STS-98 left-hand solid rocket booster. Inspection and X-ray analysis of the ordnance-related cable connectors is required as part of an evaluation of their flight readiness before Space Shuttle Atlantis can rollout to Launch Pad 39A KSC00pp1913

The first solid rocket booster solid motor segemnts to arrive at KSC, the left and right hand aft segments are off-loaded into High Bay 4 in the Vehicle Assembly Building and mated to their respective SRB aft skirts. The two aft assemblies will support the entire 150 foot tall solid boosters, in turn supporting the external tank and Orbiter Columbia on the Mobile Launcher Platform, for the first orbital flight test of the Space Shuttle. ARC-1980-AC80-0107-3

Inside orbiter Endeavour's payload bay, a crane lifts the Shuttle Radar Topography Mission (SRTM) for its transfer out of the orbiter to a payload canister. The payload on mission STS-99, SRTM is being removed to allow technicians access to the orbiter's midbody for planned wiring inspections. Endeavour is in the Orbiter Processing Facility. The entire fleet of orbiters is being inspected for wiring abrasions after the problem was first discovered in Columbia. Shuttle managers are reviewing several manifest options and could establish new target launch dates for the balance of 1999 next week. Shuttle Endeavour currently remains slated for launch in early October KSC-99pp1055

STS-88 crew members inspect the orbital docking mechanism in the payload bay of Orbiter Endeavor during the Crew Equipment Interface Test (CEIT), held in the Orbiter Processing Facility Bay 1 at KSC. The tunnel and airlock are below it. The CEIT gives astronauts an opportunity for a hands-on look at the payloads on which they will be working on orbit. STS-88 will be the first Space Shuttle launch for the International Space Station. Scheduled to lift off from KSC on Dec. 3, 1998, the seven-day mission will be highlighted by the mating of the U.S.-built Unity connecting module to the Zarya control module, which will already be in orbit, and two space walks to connect power and data transmission cables between the two modules KSC-98pc829

KENNEDY SPACE CENTER, FLA. -- KSC workers stand inside the payload bay of the orbiter Columbia following completion of electrical wiring inspections. At right, behind and below them is the cable tray with the wiring. During launch of Columbia on mission STS-93, a damaged wire caused a short circuit in two separate main engine controllers. As a result of the findings, Shuttle program managers decided to conduct inspections of the wiring in Endeavour's payload bay before its next mission, STS-99. The inspection and possible repair work will lead to a delayed launch date no earlier than Oct.7. The primary payload of the mission is the Shuttle Radar Topography Mission, a specially modified radar system that will gather data for the most accurate and complete topographic map of the Earth's surface that has ever been assembled KSC-99pd-812-01

KENNEDY SPACE CENTER, FLA. -- KSC workers stand inside the payload bay of the orbiter Columbia following completion of electrical wiring inspections. In the background is the open cable tray with the wiring. During launch of Columbia on mission STS-93, a damaged wire caused a short circuit in two separate main engine controllers. As a result of the findings, Shuttle program managers decided to conduct inspections of the wiring in Endeavour's payload bay before its next mission, STS-99. The inspection and possible repair work will lead to a delayed launch date no earlier than Oct.7. The primary payload of the mission is the Shuttle Radar Topography Mission, a specially modified radar system that will gather data for the most accurate and complete topographic map of the Earth's surface that has ever been assembled KSC-99pd-812-03

In the Orbiter Processing Facility, workers observe as an overhead crane lowers the Shuttle Radar Topography Mission (SRTM) into a payload canister. The payload on mission STS-99, SRTM was removed from orbiter Endeavour's payload bay to allow technicians access to the orbiter's midbody for planned wiring inspections. The entire fleet of orbiters is being inspected for wiring abrasions after the problem was first discovered in Columbia. Shuttle managers are reviewing several manifest options and could establish new target launch dates for the balance of 1999 next week. Shuttle Endeavour currently remains slated for launch in early October KSC-99pp1057

STS-91 Commander Charles Precourt inspects the windows of the cockpit from inside of the orbiter Discovery during the Crew Equipment Interface Test, or CEIT, in KSC's Orbiter Processing Facility Bay 2. During CEIT, the crew have an opportunity to get a hands-on look at the payloads with which they'll be working on-orbit. The STS-91 crew are scheduled to launch aboard the Shuttle Discovery for the ninth and final docking with the Russian Space Station Mir from KSC's Launch Pad 39A on May 28 at 8:05 EDT KSC-98pc463

STS-88 crew members inspect the orbital docking mechanism in the payload bay of Orbiter Endeavour during the Crew Equipment Interface Test (CEIT), held in the Orbiter Processing Facility Bay 1 at KSC. The CEIT gives astronauts an opportunity for a hands-on look at the payloads on which they will be working on orbit. STS-88 will be the first Space Shuttle launch for the International Space Station. Scheduled to lift off on Dec. 3, 1998, the seven-day mission will be highlighted by the mating of the U.S.-built Unity connecting module to the Zarya control module, which will already be in orbit, and two space walks to connect power and data transmission cables between the two modules KSC-98pc830

A KSC solid rocket booster worker inspects the reusable cables and connectors located inside the external tank attachment ring on the STS-98 left-hand solid rocket booster. Inspection and X-ray analysis of the ordnance-related cable connectors is required as part of an evaluation of their flight readiness before Space Shuttle Atlantis can rollout to Launch Pad 39A KSC-00pp1913

description

Summary

A KSC solid rocket booster worker inspects the reusable cables and connectors located inside the external tank attachment ring on the STS-98 left-hand solid rocket booster. Inspection and X-ray analysis of the ordnance-related cable connectors is required as part of an evaluation of their flight readiness before Space Shuttle Atlantis can rollout to Launch Pad 39A

The Space Shuttle program was the United States government's manned launch vehicle program from 1981 to 2011, administered by NASA and officially beginning in 1972. The Space Shuttle system—composed of an orbiter launched with two reusable solid rocket boosters and a disposable external fuel tank— carried up to eight astronauts and up to 50,000 lb (23,000 kg) of payload into low Earth orbit (LEO). When its mission was complete, the orbiter would re-enter the Earth's atmosphere and lands as a glider. Although the concept had been explored since the late 1960s, the program formally commenced in 1972 and was the focus of NASA's manned operations after the final Apollo and Skylab flights in the mid-1970s. It started with the launch of the first shuttle Columbia on April 12, 1981, on STS-1. and finished with its last mission, STS-135 flown by Atlantis, in July 2011.

Space Shuttle Atlantis was a space shuttle that was operated by NASA as part of the Space Shuttle program. It was the fourth operational shuttle built, and the last one to be built before the program was retired in 2011. Atlantis was named after the first research vessel operated by the Woods Hole Oceanographic Institution, and it made its first flight in October 1985. Over the course of its career, Atlantis completed 33 missions and spent a total of 307 days in space. Its last mission was STS-135, which was the final mission of the Space Shuttle program. Atlantis is now on display at the Kennedy Space Center Visitor Complex in Florida. Space Shuttle Atlantis (Orbiter Vehicle Designation: OV-104) was one of the four first operational orbiters in the Space Shuttle fleet of NASA, the space agency of the United States. (The other two are Discovery and Endeavour.) Atlantis was the fourth operational shuttle built. Atlantis is named after a two-masted sailing ship that operated from 1930 to 1966 for the Woods Hole Oceanographic Institute. Atlantis performed well in 25 years of service, flying 33 missions.

Nothing Found.

label_outline

Tags

kennedy space center rocket booster worker inspects rocket booster worker inspects cables connectors tank attachment tank attachment sts rocket booster inspection x ray analysis x ray analysis cable connectors readiness flight readiness atlantis space shuttle atlantis rollout launch pad space shuttle high resolution nasa
date_range

Date

14/12/2000
collections

in collections

Space Shuttle Program

Space Shuttle Atlantis

The Fourth Pperational Shuttle Built
place

Location

Kennedy Space Center, FL
create

Source

NASA
link

Link

https://images.nasa.gov/
copyright

Copyright info

Public Domain Dedication (CC0)

label_outline Explore Flight Readiness, X Ray Analysis, Inspects

S124E007818 - STS-124 - JPM Cables and connectors

S116E06414 - STS-116 - NOD1P1 on Node 1 taken during Joint Operations

Aviation Support Equipment Technician Airman Evan Simpson greases arresting cables on the flight deck.

S124E006258 - STS-124 - Cables and Connectors

S124E006199 - STS-124 - Cables and connectors

Canadian MASTER Corporal Guy Loiselle collects communications cables from the high frequency radio tent, in Lager Aulenbach, Germany, during Exercise COMBINED ENDEAVOR 2001. Combined Endeavor, the largest communications and information systems exercise in the world, is drawing to a close. The exercise, sponsored by US European Command and hosted by Germany in the spirit of "Partnership for Peace," is held annually to test and document the interoperability of dozens of nations and NATO

U.S. Navy Command MASTER CHIEF Ashley Smith (right), from the Aircraft Carrier USS KITTY HAWK (CV 63), uses an M14 rifle with a Mk. 87 line throwing attachment to fire a message line to the Henry J. Kaiser Class Oiler USNS TIPPECANOE (T-AO 199) during a replenishment at sea operation between the two ships in the Pacific Ocean on Aug. 24, 2006. RAS is a method of transferring fuel, munitions and stores from ship to another while underway. (U.S. Navy photo by Mass Communication SPECIALIST SEAMAN Joshua Wayne LeGrand) (Released)

Lieutenant Junior Grade (LTJG) Mary Kessler (right), watches as Storekeepers work connecter cables for an SH-60B LAMPS MK III Seahawk helicopter lift, during a Vertical Replenishment (VERTREP) aboard USS KITTY HAWK (CV 63) in the South China Sea

S124E006536 - STS-124 - JPM - cables and connectors

S134E008257 - STS-134 - View of Cables and Connectors

SGT. Lee E. DuBry of the 28th Munitions Maintenance Squadron checks connectors with a probe before a practice bomb is loaded into a B-1B aircraft. The bomber is participating in Phase II of exercise Proud Shield '88, in which KC-135 Stratotanker aircraft and B-1B crews conduct navigation, bombing and refueling competitions

[Assignment: BEA_2006_6574_4] Bureau of Economic Analysis - Bureau of Economic Analysis (BEA) Merchandise Rollout Event [40_CFD_BEA_2006_6574_4__DSC3909.JPG]

Topics

kennedy space center rocket booster worker inspects rocket booster worker inspects cables connectors tank attachment tank attachment sts rocket booster inspection x ray analysis x ray analysis cable connectors readiness flight readiness atlantis space shuttle atlantis rollout launch pad space shuttle high resolution nasa