Jeff Linkinhoker (Right), project manager of the U.S.
Summary
Jeff Linkinhoker (Right), project manager of the U.S. Army Corps of Engineers Nashville District’s Center Hill Hydropower Rehabilitation Project, and Mike Murphy, mechanical engineer with the Hydropower Branch, tour Voith Hydro’s laboratory Oct. 8, 2014 in York, Pa. They visited to witness the testing of the model hydropower turbine to ensure it met required specifications before the manufacturing process and work to modernize the power house begins at Center Hill Dam in Lancaster, Tenn.
Tags
laboratory
pennsylvania
usace
energy
rehabilitation
turbine
power
york
corps of engineers
generators
corps
power generation
green energy
environment
electricity
modernization
nashville district
model
hydropower
center hill
center hill dam
caney fork river
hydroelectric design center
cumberland river basin
reliability
mike murphy
voith hydro
voith
hydropower program
voith hydro inc
witness test
hdc
s morgan smith memorial laboratory
jeff linkinhoker
leon roberts
hydropower model tests generate positive results for center hill rehab project
dvids
ultra high resolution
high resolution
manufacturing
us army corps of engineers
Date
08/10/2014
Source
Defense Visual Information Distribution Service
Link
Copyright info
Public Domain Dedication. Public Use Notice of Limitations: https://www.dvidshub.net/about/copyright