Contractors work on paving a road in the cantonment
Summary
Contractors work on paving a road in the cantonment area May 7, 2020, at Fort McCoy, Wis. The road paving was part of work being done on several roadways over the three-week period at the installation in April and May 2020. The construction is being coordinated by the Fort McCoy Directorate of Public Works. (U.S. Army Photo by Scott T. Sturkol, Public Affairs Office, Fort McCoy, Wis.)
Tags
wisconsin
road paving
construction
fort mccoy
fort mccoy directorate of public works
scott sturkol
fort mccoy public affairs office
road paving work at fort mccoy
dvids
ultra high resolution
high resolution
fort mccoy wisconsin
Date
07/05/2020
Location
Source
Defense Visual Information Distribution Service
Link
Copyright info
Public Domain Dedication. Public Use Notice of Limitations: https://www.dvidshub.net/about/copyright