visibility Similar

code Related

Workers with the Defense Non-Tactical Generator and

description

Summary

Workers with the Defense Non-Tactical Generator and Rail Equipment Center of Anniston Army Depot, Ala., and the Fort McCoy Logistics Readiness Center’s Installation Material Maintenance Activity work on the installation’s locomotive Nov. 5, 2019, at Fort McCoy, Wis. The team of maintenance personnel completed repairs on the locomotive in time for a rail offload of Army vehicles and equipment belonging to the 389th Engineer Battalion returning from a deployment to Operation Resolute Castle overseas. The repair to the locomotive took two days to complete. Whether it was moving troops and equipment during World War II or other contingencies, or bringing in or sending out equipment and supplies for a present-day exercise, rail will always be a primary mode of transportation at the installation. (U.S. Army Photo by Scott T. Sturkol, Public Affairs Office, Fort McCoy, Wis.)

Nothing Found.

label_outline

Tags

wisconsin fort mccoy railway railroad rail locomotive defense non tactical generator and rail equipment center scott sturkol fort mccoy public affairs office maintenance personnel repair fort mccoy locomotive return it to service in time for rail offload dvids ultra high resolution high resolution fort mccoy wisconsin alabama workers
date_range

Date

05/11/2019
place

Location

create

Source

Defense Visual Information Distribution Service
link

Link

https://www.dvidshub.net/
copyright

Copyright info

Public Domain Dedication. Public Use Notice of Limitations: https://www.dvidshub.net/about/copyright

label_outline Explore Defense Non Tactical Generator And Rail Equipment Center, Maintenance Personnel Repair Fort Mccoy Locomotive Return It To Service In Time For Rail Offload, Alabama

Topics

wisconsin fort mccoy railway railroad rail locomotive defense non tactical generator and rail equipment center scott sturkol fort mccoy public affairs office maintenance personnel repair fort mccoy locomotive return it to service in time for rail offload dvids ultra high resolution high resolution fort mccoy wisconsin alabama workers