Bringing innovation to fruition: Marines 3D print 1st reinforced concrete bridge in western hemisphere
Summary
A Marine with 1st Marine Logistics Group walks across a concrete footbridge during a 3D concrete printing exercise Dec. 12, at Camp Pendleton, California. Working with Marine Corps Systems Command’s Advanced Manufacturing Operations Cell and the Army Corps of Engineers, the 1st MLG used the Automated Construction of Expeditionary Structures—or ACES—printer to conduct 3D concrete printing of the bridge and evaluate emerging technology for future application in Marine Corps engineering operations. (U.S. Navy photo by Ensign Elizabeth Flanary)
- A Concrete Example: How 3D Printing Can Create Housing and ...
- Marines Embrace 3D Printing for Versatility and Speed
- DOD Uses 3D Printers to Ease COVID-19 Ventilator Shortage
- Marines 3D print 1st reinforced concrete bridge in western hemisphere
- Marines 3D print 1st reinforced concrete bridge in western hemisphere
- 3-D-Printed Bridges Promise Smarter, Greener Transit Links - WSJ
- Marine Corps Tests Combat Engineering Applications Of 3D Printing
- Bringing innovation to fruition: Marines 3D print 1st reinforced ...
- Marines 3D-print concrete bridge in 14 hours | Fox News
- DOD Uses 3D Printers to Ease COVID-19 Ventilator Shortage
Tags
seabees
humanitarian relief
1st marine logistics group
sailor
construction
naval mobile construction battalion 5
marine corps systems command
3 d printing
additive manufacturing
amoc
advanced manufacturing operations cell
concrete print
concrete bridge
camp pendleton
bringing innovation to fruition marines 3 d print 1st reinforced concrete bridge in western hemisphere
dvids
california
manufacturing
us marine corps
Date
13/12/2018
Location
Source
Defense Visual Information Distribution Service
Link
Copyright info
Public Domain Dedication. Public Use Notice of Limitations: https://www.dvidshub.net/about/copyright