visibility Similar

code Related

Astronaut Carl Walz test portable foot restraint in aft cargo bay

description

Summary

STS051-98-021 (16 Sept. 1993) --- In the Space Shuttle Discovery's aft cargo bay, astronaut Carl E. Walz gets his turn on the Portable Foot Restraint (PFR). Astronauts Walz, waving to his crew mates inside Discovery's cabin, and James H. Newman each put in some time evaluating the PFR, one of the pieces of gear to be used on the Hubble Space Telescope (HST) STS-61 servicing mission (scheduled later this year) and other Shuttle missions.

label_outline

Tags

astronauts discovery orbiter onboard activities payload bay portable foot restraints sts 51 johnson space center astronaut carl walz test astronaut carl walz test foot restraint foot restraint cargo bay high resolution cargo bay astronauts walz astronaut carl portable foot restraint pfr hubble space telescope shuttle missions crew mates mission space spaceflight astronomy universe nasa
date_range

Date

16/09/1993
place

Location

Johnson Space Center ,  29.56198, -95.09268
create

Source

NASA
link

Link

https://images.nasa.gov/
copyright

Copyright info

Public Domain Dedication (CC0)

label_outline Explore Crew Mates, Astronauts Walz, Astronaut Carl

S109E5387 - STS-109 - STS-109 MS Massimino during second EVA

KENNEDY SPACE CENTER, FLA. -- During Crew Equipment Interface Test (CEIT) activities at SPACEHAB, members of the STS-106 crew check out a Russian foot restraint, equipment that will be part of the payload on their mission to the International Space Station. Around the table are Mission Specialist Yuri I. Malenchenko (back to camera), a SPACEHAB worker, and Mission Specialists Daniel C. Burbank (at end of table) and Edward T. Lu (right). Others at KSC for the CEIT are Commander Terrence W. Wilcutt, Pilot Scott D. Altman, and Mission Specialists Boris V. Morukov and Richard A. Mastracchio. Malenchenko and Morukov represent the Russian Aviation and Space Agency. On the 11-day mission, the seven-member crew will perform support tasks on orbit, transfer supplies and prepare the living quarters in the newly arrived Zvezda Service Module for the first long-duration crew, dubbed “Expedition One,” which is due to arrive at the Station in late fall. STS-106 is scheduled to launch Sept. 8, 2000, at 8:31 a.m. EDT from Launch Pad 39B KSC00pp0961

CAPE CANAVERAL, Fla. - In Orbiter Processing Facility 1 at NASA's Kennedy Space Center in Florida, United Space Alliance technicians, lying on a work platform, remove window #8 from the top of the crew module of space shuttle Atlantis. Inspection and maintenance of the crew module windows is standard procedure between shuttle missions. Atlantis is next slated to deliver an Integrated Cargo Carrier and Russian-built Mini Research Module to the International Space Station on the STS-132 mission. The second in a series of new pressurized components for Russia, the module will be permanently attached to the Zarya module. Three spacewalks are planned to store spare components outside the station, including six spare batteries, a boom assembly for the Ku-band antenna and spares for the Canadian Dextre robotic arm extension. A radiator, airlock and European robotic arm for the Russian Multi-purpose Laboratory Module also are payloads on the flight. Launch is targeted for May 14. Photo credit: NASA/Glenn Benson KSC-2010-1082

STS051-04-037 - STS-051 - Carl Walz and James Newman in airlock with EMUs

S81E5926 - STS-081 - RME 1327 - Crew Medical Restraint System (CMRS)

STS051-98-029 - STS-051 - Walz and Newman in the payload bay during EVA

S43-08-025 - STS-043 - STS-43 Commander Blaha gets into his sleep restraint on OV-104's middeck

STS072-389-021 - STS-072 - Crewmember activity in payload bay during second EVA of STS-72 mission

CAPE CANAVERAL, Fla. – The first stage ignited on NASA’s Ares I-X test rocket at Launch Pad 39B at NASA's Kennedy Space Center in Florida at 11:30 a.m. EDT on Oct. 28. The rocket produces 2.96 million pounds of thrust at liftoff and reaches a speed of 100 mph in eight seconds. This was the first launch from Kennedy's pads of a vehicle other than the space shuttle since the Apollo Program's Saturn rockets were retired. The parts used to make the Ares I-X booster flew on 30 different shuttle missions ranging from STS-29 in 1989 to STS-106 in 2000. The data returned from more than 700 sensors throughout the rocket will be used to refine the design of future launch vehicles and bring NASA one step closer to reaching its exploration goals. For information on the Ares I-X vehicle and flight test, visit http://www.nasa.gov/aresIX. Photo credit: NASA/Sandra Joseph and Kevin O'Connell KSC-2009-5987

STS100-391-024 - STS-100 - Panel PMA2/02-05 with launch restraint fitting F11 taken during STS-100

S121E06337 - STS-121 - Sellers on RMS/OBSS for Position 1 Evaluation on EVA1 during STS-121 / Expedition 13 joint operations

STS103-346-024 - STS-103 - 3rd EVA - Grunsfeld on the HST

Topics

astronauts discovery orbiter onboard activities payload bay portable foot restraints sts 51 johnson space center astronaut carl walz test astronaut carl walz test foot restraint foot restraint cargo bay high resolution cargo bay astronauts walz astronaut carl portable foot restraint pfr hubble space telescope shuttle missions crew mates mission space spaceflight astronomy universe nasa