visibility Similar

181109-N-ZL062-0107 EAST CHINA SEA (Nov. 9, 2018) Gas

CAPE CANAVERAL, Fla. – Researchers fill a water bag with ionized water for the Veggie plant growth system inside a control chamber at the Space Station Processing Facility at NASA's Kennedy Space Center in Florida. In front is Jim Smodell, a technician with SGT. Standing behind him is Chuck Spern, lead project engineer with QinetiQ North America. The growth chamber will be used as a control unit and procedures will be followed identical to those being performed on Veggie and the Veg-01 experiment on the International Space Station by Expedition 39 flight engineer and NASA astronaut Steve Swanson. Veggie and Veg-01 were delivered to the space station aboard the SpaceX-3 mission. Veggie is the first fresh food production system delivered to the station. Six plant pillows, each containing outredgeous red romaine lettuce seeds and a root mat were inserted into Veggie. The plant chamber's red, blue and green LED lights were activated. The plant growth will be monitored for 28 days. At the end of the cycle, the plants will be carefully harvested, frozen and stored for return to Earth. Photo credit: NASA/Dimitri Gerondidakis KSC-2014-2473

Kepler project; technicians from Ball Aerospace work on and in the test chamber assembled at Nasa Ames Research center testing components ARC-2008-ACD07-0203-191

VIP TOUR OF GODDARD SPACE FLIGHT CENTER - BARBARA MORGAN +BOISE STATE UNIVERSITY OFFICIALS

Crane Army Ammunition Activity employees produce MJU

NASA's Lunar Reconnaissance Orbiter (LRO) spacecraft GIMBALL ROTATION

New York Army National Guard Staff Sgt. Saul Rodriguez,

Environment protection, free images 412_DSP_TestEvaluationFacility_018

Kepler project; technicians from Ball Aerospace work on and in the test chamber assembled at Nasa Ames Research center testing components ARC-2008-ACD07-0203-195

code Related

Kepler project; technicians from Ball Aerospace work on and in the test chamber assembled at Nasa Ames Research center testing components ARC-2008-ACD07-0203-187

description

Summary

Kepler project; technicians from Ball Aerospace work on and in the test chamber assembled at Nasa Ames Research center testing components

label_outline

Tags

kepler arc dominic hart ames research center project kepler project technicians ball aerospace ball aerospace work test chamber test chamber ames research center nasa ames research center components components arc high resolution nasa
date_range

Date

21/09/2007
place

Location

create

Source

NASA
link

Link

https://images.nasa.gov/
copyright

Copyright info

Public Domain Dedication (CC0)

label_outline Explore Components Arc, Ball Aerospace Work, Kepler Project

Daniel King prepares alignment of various optical components using eye-safe visible lasers.

CAPE CANAVERAL, Fla. - In Orbiter Processing Facility 1 at NASA's Kennedy Space Center in Florida, United Space Alliance technicians, lying on a work platform, remove window #8 from the top of the crew module of space shuttle Atlantis. Inspection and maintenance of the crew module windows is standard procedure between shuttle missions. Atlantis is next slated to deliver an Integrated Cargo Carrier and Russian-built Mini Research Module to the International Space Station on the STS-132 mission. The second in a series of new pressurized components for Russia, the module will be permanently attached to the Zarya module. Three spacewalks are planned to store spare components outside the station, including six spare batteries, a boom assembly for the Ku-band antenna and spares for the Canadian Dextre robotic arm extension. A radiator, airlock and European robotic arm for the Russian Multi-purpose Laboratory Module also are payloads on the flight. Launch is targeted for May 14. Photo credit: NASA/Glenn Benson KSC-2010-1082

TEST CHAMBER AND CLEAN ROOM AT THE K FACILITY AT NASA PLUM BROOK STATION

STS078-305-002 - STS-078 - BDPU, Henricks places new test chamber into experiment module in LMS-1 Spacelab

PROPULSION SYSTEMS LABORATORY PSL TANK 4 TEST CHAMBER

Slotting Machine (1914 – 18), England

COMPONENTS CLEANING FACILITY FIELD OPERATION

U. S. Air Force School of Aerospace Medicine Public

A technician works in the Aerospace Laboratory, Air Force Systems Command

KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facility, astronauts are getting first-hand experience with the fluid experiment rack of the Japanese Experiment Module, or JEM, part of the mission payload to the International Space Station. The JEM comprises six components: two research facilities -- the Pressurized Module and Exposed Facility; a Logistics Module attached to each of them; a Remote Manipulator System; and an Inter-Orbit Communication System unit. The various components of JEM will be assembled in space over the course of three Space Shuttle missions. The first of those three missions, STS-123, will carry the Experiment Logistics Module Pressurized Section aboard the Space Shuttle Endeavour, targeted for launch in February 2008. Photo credit: NASA/Jim Grossmann KSC-07pd1175

Lunar CRater Observation and Sensing Satellite (LCROSS) and P.I. at NASA Ames Research Center - Total Luminance Photometer lens and electronics units on shake table in N-2444 EEL Laboratory with Lynn Hofland (techician/operator EEL) oversees test run ARC-2007-ACD07-0073-070

A close up of a computer mother board. Processor cpu heat sink, science technology.

Topics

kepler arc dominic hart ames research center project kepler project technicians ball aerospace ball aerospace work test chamber test chamber ames research center nasa ames research center components components arc high resolution nasa