visibility Similar

code Related

Wachusett Dam, looking northwesterly, Clinton, Mass., Nov. 25, 1902

description

Summary

Picryl description: Public domain image of a damaged, burned, or destroyed building, natural disaster, war destruction, ruins, 19th-century architecture, free to use, no copyright restrictions.

label_outline

Tags

massachusetts executive office of energy and environmental affairs massachusetts archives waterworks dams construction sites massachusetts worcester county clinton dry plate negatives wachusett dam digitalcommonwealth ultra high resolution high resolution metropolitan district commission water division metropolitan water works photograph collection 1876 1930 united states history construction
date_range

Date

1902
create

Source

Massachusetts Archives
link

Link

https://ark.digitalcommonwealth.org/
copyright

Copyright info

Public Domain

label_outline Explore Wachusett Dam, Dams, Clinton

Dams under construction. Watts Bar Dam, shown here under construction, has a semi-outdoors type powerhouse with an enormous gantry crane (to the right of the picture) for installation and removal of units. The project is further distinguished by a control building which is entirely removed from the hydro plant, being located some 120 feet higher on top of a steep cliff and with direct connection to the switchyard behind. The windowless left wing of the control building houses the control room; the tower-like structure in the back accomodates air conditioning, restrooms, etc. The glass wall, upper level, contains the reception room with a broad semi-circular overlook terrace, the story below the terrace devoted to offices

Looking through gateway, from Houghtoe [Houghton] Seminary grounds, Clinton, N.Y.

[Severe Storms, Tornadoes, and Flooding] Oakville, Iowa, July 6th, 2008--The Army Corps of Engineers works to repair a road to improve access into Oakville. This will also contain the flow of the Iowa River which breached it's levee in mid June. After the road is repaired the Corps can begin repairing the levee which will bring relief to the town of Oakville. Susie Shapira/FEMA

Wachusett Reservoir, North Dike, easterly portion, embankment, station 20; from the west, Clinton, Mass., Oct. 27, 1899

Distribution Department, Weston Aqueduct Supply Mains, Section 5, 60-inch pipe trench in Commonwealth Avenue at Washington Street, Newton, Mass., Jan. 7, 1916

Essex County, V. 3, Double Page Plate No. 6 [Map bounded by Union Ave., Clinton Ave., Fabyan Pl.]

Wachusett Dam, Lower Gatehouse, Clinton, Mass., Apr. 16, 1909

Wachusett Aqueduct, Italian laborers village, Berlin, Mass., 1897

Wachusett Reservoir, removal of soil, Section 4, grubbing and stripping, Clinton, Mass., Dec. 1899

Hartwell Dam and Reservoir near Hartwell, Ga. and Anderson, S. C., on Savannah River (Ga.-S. C. state line)

Sanborn Fire Insurance Map from Clinton, Rock County, Wisconsin

St. Lucie Canal, St. Lucie Lock No. 1, St. Lucie, Cross State Canal, Okeechobee Intracoastal Waterway, Stuart, Martin County, FL

Topics

massachusetts executive office of energy and environmental affairs massachusetts archives waterworks dams construction sites massachusetts worcester county clinton dry plate negatives wachusett dam digitalcommonwealth ultra high resolution high resolution metropolitan district commission water division metropolitan water works photograph collection 1876 1930 united states history construction