visibility Similar

CAPE CANAVERAL, Fla. – In the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida, preparations are under way to move space shuttle Endeavour, secured to its mobile launcher platform, from High Bay 1 to Launch Pad 39A. First motion was at 4:13 a.m. EST Jan. 6. The 3.4-mile trip, known as rollout, takes about six hours. Rollout is a significant milestone in launch processing activities. The primary payload for the STS-130 mission is the International Space Station's Node 3, Tranquility, a pressurized module that will provide room for many of the station's life support systems. Attached to one end of Tranquility is a cupola, a unique work area with six windows on its sides and one on top. The cupola resembles a circular bay window and will provide a vastly improved view of the station's exterior. The multi-directional view will allow the crew to monitor spacewalks and docking operations, as well as provide a spectacular view of Earth and other celestial objects. The module was built in Turin, Italy, by Thales Alenia Space for the European Space Agency. Space shuttle Endeavour's STS-130 mission is targeted for launch at 4:39 a.m. EST Feb. 7. For information on the STS-130 mission and crew, visit http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts130/index.html. Photo credit: NASA/Amanda Diller KSC-2010-1024

Space Shuttle Columbia, STS-78 Launch

S132E007584 - STS-132 - STS-132 Space Shuttle Atlantis Payload Bay

S126E014430 - STS-126 - Flyaround view of SM following STS-126 Undocking

STS056-28-036 - STS-056 - Views of the payload bay, Earth limb with day/night terminator, and moon.

S131E009633 - STS-131 - Earth Observations

S131E009627 - STS-131 - Earth Observations

S114E6376 - STS-114 - Tile survey taken during EVA 3

STS-131 Discovery after Undocking

code Related

VAB Arrival. NASA public domain image colelction.

description

Summary

Space shuttle Atlantis rolls into the transfer aisle of the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida. From the transfer aisle, Atlantis will be lifted into High Bay 3 and joined to the solid rocket boosters and external fuel tank already installed on the mobile launcher platform. Photo credit: NASA/Jack Pfaller March 23, 2009

NASA Identifier: 322012main_invab_full

label_outline

Tags

nasa nasa sts multimedia gallery vab arrival dvids high resolution space shuttle
date_range

Date

20/08/2009
place

Location

create

Source

Defense Visual Information Distribution Service
link

Link

https://www.dvidshub.net/
copyright

Copyright info

Public Domain Dedication. Public Use Notice of Limitations: https://www.dvidshub.net/about/copyright

label_outline Explore Nasa Sts Multimedia Gallery

Topics

nasa nasa sts multimedia gallery vab arrival dvids high resolution space shuttle