visibility Similar

KENNEDY SPACE CENTER, FLA. -- Leaving a wavy contrail in its wake, the launch of space shuttle Atlantis is viewed through the windows of the Launch Control Center, where VIPS gathered to watch, including Center Director Bill Parsons, Associate Administrator for NASA Space Operations William H. Gerstenmaier and NASA Administrator Mike Griffin. Liftoff was on time at 2:45 p.m. EST from Launch Pad 39A. The launch is the third attempt for Atlantis since December 2007 to carry the European Space Agency's Columbus laboratory to the International Space Station. During the 11-day mission, the crew's prime objective is to attach the laboratory to the Harmony module, adding to the station's size and capabilities. Photo credit: NASA/Kim Shiflett KSC-08pd0207

STS-132 - LAUNCH - Public domain NASA photogrpaph

Northrop Grumman Antares CRS-10 Launch (NHQ201811170100)

Launch views of the Columbia for the STS-1 mission, April 12, 1981

CAPE CANAVERAL, Fla. --- Inside the Vehicle Assembly Building at NASA's Kennedy Space Center, the external tank for space shuttle Discovery is lowered into a checkout cell for processing. The tank will be stacked with solid rocket boosters for Discovery's launch on the STS-124 mission. On the mission, the shuttle will transport the Kibo Japanese Experiment Module - Pressurized Module and the Japanese Remote Manipulator System. Launch is targeted for May 25. Photo credit: NASA/Jim Grossmann KSC-08pd0891

STS-130 - EOM - Public domain NASA photogrpaph

CAPE CANAVERAL, Fla. – In high bay 4 of the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida, technicians begin the modal survey testing on the top part of the Ares I-X (upper left) after sensors were placed on the stack. The top consists of the launch abort tower, crew module, service module and spacecraft adaptor. Other segments are stacked nearby. Shakers will impose random loads/vibrations to determine the flight test vehicle’s first several bending modes and the strategically located sensors throughout the stacks will measure the amount, acceleration and direction of movement. The purpose of the testing is to confirm that Ares I-X will behave as predicted as it lifts off the pad and powers through the initial stage of flight in a demonstration flight later this year. Photo credit: NASA/Jack Pfaller KSC-2009-3350

Orion Spacecraft is Completed and Ready for Launch

Expedition 31 Soyuz Assembly (201205120003HQ)

code Related

USS Shark (SS-174) - 19-N-16690

description

Summary

Nearly ready for launching, at the Electric Boat Company shipyard, Groton, Connecticut, 20 May 1935. She was launched on the following day. Photograph from the Bureau of Ships Collection in the U.S. National Archives.

label_outline

Tags

united states naval history naval history and heritage command black and white photographs of ships uss shark ss 174 high resolution ultra high resolution
date_range

Date

20/05/1935
place

Location

create

Source

Naval History and Heritage Command
link

Link

https://www.history.navy.mil/
copyright

Copyright info

Public Domain

label_outline Explore Black And White Photographs Of Ships, Naval History, Naval History And Heritage Command

Topics

united states naval history naval history and heritage command black and white photographs of ships uss shark ss 174 high resolution ultra high resolution