visibility Similar

code Related

U.S. Army Reserve Spc. Collin Hoyt, front, and Pfc.

description

Summary

U.S. Army Reserve Spc. Collin Hoyt, front, and Pfc. Jared Clarke, transmission and distribution specialists with the 249th Engineering Battalion, D-Company, attach grounding cables to power lines in Rio Grande, Puerto Rico, Oct. 19, 2017. The Federal Emergency Management Agency and its federal partners continue 24-hour operations to conduct missions in support of those affected by Hurricane Maria. (U.S. Air Force photo by Master Sgt. Joshua L. DeMotts)

label_outline

Tags

puerto rico usace power d company electricity rio grande prime power hurricane maria vipr 249th engineering battalion master sgt joshua demotts 1st combat camera squadron hurricane maria 249th engineering battalion d company dvids high resolution us army corps of engineers power lines electric power
date_range

Date

18/10/2017
create

Source

Defense Visual Information Distribution Service
link

Link

https://www.dvidshub.net/
copyright

Copyright info

Public Domain Dedication. Public Use Notice of Limitations: https://www.dvidshub.net/about/copyright

label_outline Explore 249th Engineering Battalion, Hurricane Maria 249th Engineering Battalion D Company, Prime Power

Power and conservation. Chickamauga Dam, Tennessee Valley Authority (TVA). Switchyard of the TVA's Chickamauga Dam, located near Chattanooga, 471 miles above the mouth of the Tennessee River. The dam has an authorized power installation of 81,000 kilowatts, which can be increased to a possible ultimate of 108,000 kilowatts. The reservoir at the dam adds 377,000 acre feet of water to controlled storage on the Tennessee River system. The power that passes through this switchyard serves many useful domestic, agricultural and industrial uses

Power and conservation. Chickamauga Dam, Tennessee Valley Authority. Insulators and transmission wires in the switchyard of the TVA's Chickamauga Dam, located near Chattanooga, 471 miles above the mouth of the Tennessee River. The dam has an authorized power installation of 81,000 kilowatts. The reservoir at the dam adds 377,000 acre feet of water to controlled storage on the Tennessee River system. The power that passes through this switchyard serves many useful domestic, agricultural and industrial uses

A student from the DeGlopper Air Assault School, VXIII

Public domain image of Ziplinning (Unsplash)

In this image released by the Texas Military Forces,

Hasslarps Stationshus., Skåne, Sverige

The Colorado National Guard is supporting the Black

Severe Storm ^ Winter Storm - Simsbury, Conn. , Nov. 5, 2011 -- Utility crews work to restore power in the aftermath of Winter Storm Alfred. Some areas of Connecticut were without electricity for more than a week. FEMA is assisting government and residents recover from the storm and is providing food and water, as well as generators for some public buildings and nursing homes. Photo by Norman Lenburg/FEMA

MOC Hilversum. Matrozen in touwen

Kyle Gagnier, left, FEMA, geographic information system

U.S. Army Soldiers assigned to the 249th Engineering

Dåvarande Södertälje Södra Station.

Topics

puerto rico usace power d company electricity rio grande prime power hurricane maria vipr 249th engineering battalion master sgt joshua demotts 1st combat camera squadron hurricane maria 249th engineering battalion d company dvids high resolution us army corps of engineers power lines electric power