U.S. Army Corps of Engineers Quality Assurance Specialists
Summary
U.S. Army Corps of Engineers Quality Assurance Specialists with the Temporary Emergency Power Planning and Response Teams inspect a generator that is installed at a fresh drinking water facility to ensure it continues to operate properly and provide the critical facilities the power it needs, Puerto Rico, September 03, 2018.
FEMA assigned USACE the Temporary Emergency Power Planning and Response mission to assist with assessments, maintenance, and generator installations at critical facilities, including, but not limited to: hospitals, wastewater treatment plants, water purification facilities, fire, and police stations. USACE has received $676 million to date for this mission.
Tags
puerto rico
recovery
usace
power
corps of engineers
fema
emergency
temporary
hurricane maria
andrew kornacki
buffalo district
san juan
water pump generator
dvids
ultra high resolution
high resolution
us army corps of engineers
workers
Date
03/09/2018
Source
Defense Visual Information Distribution Service
Link
Copyright info
Public Domain Dedication. Public Use Notice of Limitations: https://www.dvidshub.net/about/copyright