visibility Similar

STS-133 PMP RACK INSTALLL PREPS 2010-3950

Mission Specialist Nancy Currie and Commander Bob Cabana participate in the Crew Equipment Interface Test (CEIT) for STS-88 in KSC's Space Station Processing Facility. The CEIT gives astronauts an opportunity to get a hands-on look at the payloads with which they will be working on-orbit. Here, Currie and Cabana inspect one of the six hatches on Node 1 of the International Space Station (ISS). STS-88, the first ISS assembly flight, is targeted for launch in July 1998 aboard Space Shuttle Endeavour KSC-97PC1789

NASA's Lunar Reconnaissance Orbiter (LRO) spacecraft

STS-133 RESUPPLY STOWAGE PLATFORM INSTALLATION TO PMM 2010-4165

NASA's Lunar Reconnaissance Orbiter (LRO) spacecraft / SOLAR PANEL INSTALL

NASA's Lunar Reconnaissance Orbiter (LRO) spacecraft

KENNEDY SPACE CENTER, FLA. -- Walking through the Space Station Processing Facility are astronauts Frank DeWinne, Michael Fincke and Tim Kopra. They are familiarizing themselves with the various elements to be installed on the International Space Station on future spaceflights. With construction of the Space Station the primary focus of future shuttle missions, astronaut crews will be working with one or more of the elements and hardware already being processed in the SSPF. Photo credit: NASA/Kim Shiflett KSC-07pd0262

CAPE CANAVERAL, Fla. – In the Payload Hazardous Servicing Facility at NASA’s Kennedy Space Center, crew members with the STS-125 mission get a close look at some of the equipment associated with their mission to service NASA’s Hubble Space Telescope. At right, Mission Specialist Michael Good practices installing a Rate Sensor Unit. Observing, from left, are Mission Specialists Andrew Feustel, Mike Massimino and John Grunsfeld, as well as Johnson Space Center EVA Trainer Thomas Gonzales-Torres. The STS-125 crew is taking part in a crew equipment interface test, which provides experience handling tools, equipment and hardware they will use on their mission. Space shuttle Atlantis is targeted to launch on the STS-125 mission Oct. 10. Photo credit: NASA/Kim Shiflett KSC-08pd2571

KODIAK ISLAND, Alaska -- Technicians prepare the PICSat payload for its launch aboard the Athena 1 launch vehicle at Kodiak Island, Alaska, as preparations to launch Kodiak Star proceed. The first orbital launch to take place from Alaska's Kodiak Launch Complex, Kodiak Star is scheduled to lift off on a Lockheed Martin Athena I launch vehicle on Sept. 17 during a two-hour window that extends from 5 p.m. to 7 p.m. p.m. ADT. The payloads aboard include the Starshine 3, sponsored by NASA, and the PICOSat, PCSat and Sapphire, sponsored by the Department of Defense (DoD) Space Test Program. KSC01kodi064

code Related

THEMIS SPACECRAFT - Public domain NASA photogrpaph

description

Summary

The original finding aid described this as:

Description: NASA's Time History of Events and Macroscale Interactions during Substorms (THEMIS) SPACECRAFT LOCATED IN THE SWALES AEROSPACE CLEANROOM..

Photographer: CHRIS GUNN

Date: 1/30/2006

Job Number: 2006-00591-0

Preservation Copy: .tif

2006

Nothing Found.

label_outline

Tags

themis spacecraft nasa high resolution themis spacecraft swales aerospace cleanroom macroscale interactions chris gunn job number preservation copy space program
date_range

Date

2006 - 2011
create

Source

The U.S. National Archives
link

Link

https://catalog.archives.gov/
copyright

Copyright info

No known copyright restrictions

label_outline Explore Swales Aerospace Cleanroom, Themis Spacecraft, Macroscale Interactions

Topics

themis spacecraft nasa high resolution themis spacecraft swales aerospace cleanroom macroscale interactions chris gunn job number preservation copy space program