visibility Similar

code Related

The Weather Flight sets up at Base X during Phase I of the Operations Readiness Inspection

description

Summary

The original finding aid described this photograph as:

Base: Moody Air Force Base

State: Georgia (GA)

Country: United States Of America (USA)

Scene Camera Operator: 347cs/Scsv

Release Status: Released to Public

Combined Military Service Digital Photographic Files

Nothing Found.

label_outline

Tags

weather flight sets weather flight sets base x phase phase i operations readiness inspection georgia high resolution moody air force base operations readiness inspection us air force air force base us national archives
date_range

Date

22/07/1996
place

Location

create

Source

The U.S. National Archives
link

Link

https://catalog.archives.gov/
copyright

Copyright info

No known copyright restrictions

label_outline Explore Operations Readiness Inspection, Base X, Phase

Chapel services are held on the deck of the battleship USS IOWA (BB 61). During good weather services are held on deck rather than in the ship's chapel

The largest and smallest radio sets on exhibition at the Radio Show in Wash.

Airman Michael Mendenhall, delivers prescriptions to

[Assignment: 48-DPA-11-14-08_SOI_K_Universal] Secretary Dirk Kempthorne [and aides] on visit to Los Angeles, California, touring Universal Studios [offices, sets, lots in Hollywood] [48-DPA-11-14-08_SOI_K_Universal_DOI_3645.JPG]

CAPE CANAVERAL, Fla. - In Orbiter Processing Facility 1 at NASA's Kennedy Space Center in Florida, United Space Alliance technicians, lying on a work platform, remove window #8 from the top of the crew module of space shuttle Atlantis. Inspection and maintenance of the crew module windows is standard procedure between shuttle missions. Atlantis is next slated to deliver an Integrated Cargo Carrier and Russian-built Mini Research Module to the International Space Station on the STS-132 mission. The second in a series of new pressurized components for Russia, the module will be permanently attached to the Zarya module. Three spacewalks are planned to store spare components outside the station, including six spare batteries, a boom assembly for the Ku-band antenna and spares for the Canadian Dextre robotic arm extension. A radiator, airlock and European robotic arm for the Russian Multi-purpose Laboratory Module also are payloads on the flight. Launch is targeted for May 14. Photo credit: NASA/Glenn Benson KSC-2010-1082

STS093-318-033 - STS-093 - STS-93 Commander Collins sets up the SAREX II equipment on the flight deck

U.S. Soldiers of Allied Forces North Batallion (AFNORTH)

Airmen assigned to the 23d Maintenance Squadron Aerospace

US Air Force (USAF) members of the Survival Response Center (SRC) receive inputs concerning their particular squadron or group during phase one and phase two of an Operational Readiness Exercise (ORE) at Dyess Air Force Base (AFB), Texas (TX)

Investigator Joseph Sapikowski, from the 23d Security

S47-01-018 - STS-047 - Echocardiography: STS-47 MS Davis sets up LBNP experiment

STS072-740-077 - STS-072 - Endeavour's payload bay with berthed SFU and OAST-Flyer as the sun sets

Topics

weather flight sets weather flight sets base x phase phase i operations readiness inspection georgia high resolution moody air force base operations readiness inspection us air force air force base us national archives