The Hurlburt Field pedestrian bridge was placed down
Summary
The Hurlburt Field pedestrian bridge was placed down as one of the cranes moved to get into its next position on U.S. Highway 98, Mary Esther, Fla., April 15, 2012. The bridge was moved using two cranes and load-bearing straps.
Tags
hurlburt field
bridge
civil engineer
air force
ce
bridge construction
christopher williams
soundside
airman 1st class christopher callaway
1st special operations wing public affairs
afsoc
dvids
high resolution
florida
Date
15/04/2012
Source
Defense Visual Information Distribution Service
Link
Copyright info
Public Domain Dedication. Public Use Notice of Limitations: https://www.dvidshub.net/about/copyright