visibility Similar

Dawn Spacecraft Processing. NASA public domain image. Kennedy space center.

NASA's Lunar Reconnaissance Orbiter (LRO) spacecraft ACOUSTIC CHAMBER

CAPE CANAVERAL, Fla. – Inside the Astrotech payload processing facility near NASA’s Kennedy Space Center in Florida, technicians monitor the progress as the Radiation Belt Storm Probes, or RBSP, spacecraft B is lowered to a horizontal position. The RBSP had been in a vertical position for testing. NASA’s RBSP mission will help us understand the sun’s influence on Earth and near-Earth space by studying the Earth’s radiation belts on various scales of space and time. RBSP will begin its mission of exploration of Earth’s Van Allen radiation belts and the extremes of space weather after its launch aboard a United Launch Alliance Atlas V rocket. Launch is targeted for Aug. 23. For more information, visit http://www.nasa.gov/rbsp. Photo credit: NASA/Kim Shiflett KSC-2012-3371

CAPE CANAVERAL, Fla. – Inside the Space Station Processing Facility at NASA's Kennedy Space Center in Florida, technicians remove the cover from around the EXPRESS Logistics Carrier for the STS-129 mission. The carrier is part of the payload on space shuttle Atlantis, which will deliver to the International Space Station components including two spare gyroscopes, two nitrogen tank assemblies, two pump modules, an ammonia tank assembly and a spare latching end effector for the station's robotic arm. STS-129 is targeted to launch Nov. 12. Photo credit: NASA/Tim Jacobs KSC-2009-2244

STS082-355-005 - STS-082 - Closeup details of MSS old covers on HST

STEREO (Solar TErrestrial RElations Observatory) SPACECRAFT SHIPPING

CAPE CANAVERAL, Fla. -- At the Kennedy Space Center Visitor Complex in Florida, construction crews are removing 16,000 square feet of plastic shrink-wrap from the space shuttle Atlantis. The spacecraft was enclosed in the plastic shrink-wrap since November of last year to protect the artifact from dust and debris during construction of the 90,000-square-foot facility. Last November, the space shuttle Atlantis made its historic final journey to its new home, traveling 10 miles from the Kennedy Space Center's Vehicle Assembly Building to the spaceport's visitor complex. The new $100 million "Space Shuttle Atlantis" facility will include interactive exhibits that tell the story of the 30-year Space Shuttle Program and highlights the future of space exploration. The "Space Shuttle Atlantis" exhibit scheduled to open June 29, 2013.Photo credit: NASA/Cory Huston KSC-2013-2197

CAPE CANAVERAL, Fla. – In the airlock of the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, workers prepare to move the ground support equipment for the STS-125 Hubble Servicing Mission delivered July 16. The GSE are carriers, or pallets, that will hold equipment in space shuttle Atlantis’ payload bay. This carrier will be moved to a work stand. The carriers will be prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the servicing mission. The three payload carriers or pallets are the Flight Support System, the Super Lightweight Interchangeable Carrier and the Orbital Replacement Unit Carrier. At the end of July, a fourth and final carrier, the Multi-Use Lightweight Equipment carrier will join the others in the Payload Hazardous Servicing Facility where the Hubble payload is being prepared for launch. Photo credit: NASA/Cory Huston KSC-08pd2003

CAPE CANAVERAL, Fla. – In the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center in Florida, the Multi-Use Lightweight Equipment, or MULE, carrier is moved toward the payload canister where it will be installed. The MULE contains hardware for the STS-125 mission to service NASA's Hubble Space Telescope. The carrier will deliver the MULE and other carriers to Launch Pad 39A for installation into Atlantis' payload bay. Atlantis' 11-day flight is targeted for launch May 12. The mission will include five spacewalks in which astronauts will refurbish and upgrade the telescope with state-of-the-art science instruments. As a result, Hubble's capabilities will be expanded and its operational lifespan extended through at least 2014. Photo credit: NASA/Tim Jacobs KSC-2009-2706

code Related

The Ares I-X hardware segment, Pathfinder 2 (PF2) being moved from Building 50 to Building 333.

description

Summary

The Ares I-X hardware segment, Pathfinder 2 (PF2) being moved from Building 50 to Building 333.

NASA Identifier: C-2007-1716

label_outline

Tags

nasa the ares i x hardware segment pathfinder 2 pf 2 being moved from building 50 to building 333 dvids high resolution glenn research center aviation research organization ultra high resolution
date_range

Date

12/09/2009
place

Location

create

Source

Defense Visual Information Distribution Service
link

Link

https://www.dvidshub.net/
copyright

Copyright info

Public Domain Dedication. Public Use Notice of Limitations: https://www.dvidshub.net/about/copyright

label_outline Explore The Ares I X Hardware Segment Pathfinder 2 Pf 2 Being Moved From Building 50 To Building 333, Aviation Research Organization, Glenn Research Center

Topics

nasa the ares i x hardware segment pathfinder 2 pf 2 being moved from building 50 to building 333 dvids high resolution glenn research center aviation research organization ultra high resolution