visibility Similar

code Related

Thames Tunnel. Rotherhithe Entrance. (Opened the 25th day of March 1843)

description

Summary

1200 feet long 76 feet below high water mark was 8 years building & cost 1 .446 000

label_outline

Tags

historic place historic view ellis t h thames tunnel thames tunnel rotherhithe entrance rotherhithe entrance prints view 19th century high resolution österreichische nationalbibliothek
date_range

Date

1850
place

Location

City, City of London, London ,  51.50853, -0.12574
create

Source

Österreichische Nationalbibliothek - Austrian National Library
link

Link

http://europeana.eu/
copyright

Copyright info

Public Domain Mark 1.0

label_outline Explore Thames Tunnel, Rotherhithe, Tunnel

Topics

historic place historic view ellis t h thames tunnel thames tunnel rotherhithe entrance rotherhithe entrance prints view 19th century high resolution österreichische nationalbibliothek