Thames Tunnel. Rotherhithe Entrance. (Opened the 25th day of March 1843)
Summary
1200 feet long 76 feet below high water mark was 8 years building & cost 1 .446 000
Tags
historic place
historic view
ellis t h
thames
tunnel
thames tunnel
rotherhithe
entrance
rotherhithe entrance
prints
view
19th century
high resolution
österreichische nationalbibliothek
Date
1850
Location
City, City of London, London
,
51.50853, -0.12574
Source
Österreichische Nationalbibliothek - Austrian National Library
Link
Copyright info
Public Domain Mark 1.0