visibility Similar

Vega-cantiere2, Italy - A crane is lifting a large piece of metal

A man standing in a construction site with a lot of steel bars. Construction site hydroelectric power plant canal, science technology.

ROCKET ENGINE TEST FACILITY RETF SOUTH 40 AREA TEST CELL WATER DELUGE IN OPERATION

West view of the exterior of the high bay at the missile assembly building during construction

Des Moines, Iowa, July 24, 2004 -- This tornado shelter for 400 campers at the Iowa State Fairgrounds outside Des Moines was completed in 2003. The 5,200 square-foot shelter is 100 feet long by 71 feet wide. When not in use as an emergency shelter, the large multi-purpose building is used by both the fairground staff and campers for restrooms, showers, a laundry area, offices, and meeting space. The shelter, funded through a $600,000 grant from FEMA's Hazard Mitigation Grant Program with the Iowa State Fair funding the remaining $150,000. In June 1998, a storm with winds in excess of 100 miles per hour (mph) caused over $465,000 in damage to the State Fair complex, severely impacting the cam

MAF 039313-003 (33099302940)

CAPE CANAVERAL, Fla. - In Launch Complex 39 at NASA's Kennedy Space Center in Florida, the walls for the Propellants North Administrative and Maintenance Facility get a layer of high-density foam insulation. A tilt-up construction method is being used to erect a THERMOMASS concrete wall insulation system for the facility's walls. In this approach, the exterior layer of concrete for the wall panels is poured and leveled on the building's footprint. Then, prefabricated, predrilled insulation sheets are arranged on top of the unhardened concrete, and connectors, designed to hold the sandwiched layers of concrete and insulation secure, are inserted through the predrilled holes. Next, the structural wythe is poured. Once cured, these panels are lifted upright to form the building's envelope. The facility will have a two-story administrative building to house managers, mechanics and technicians who fuel spacecraft at Kennedy adjacent to an 1,800-square-foot single-story shop to store cryogenic fuel transfer equipment. The new facility will feature high-efficiency roofs and walls, “Cool Dry Quiet” air conditioning with energy recovery technology, efficient lighting, and other sustainable features. The facility is striving to qualify for the U.S. Green Building Council’s Leadership in Energy and Environmental Design, or LEED, Platinum certification. If successful, Propellants North will be the first Kennedy facility to achieve this highest of LEED ratings after it is completed in the summer of 2010. The facility was designed for NASA by Jones Edmunds and Associates. Photo credit: NASA/Jim Grossmann KSC-2009-6801

Platform A North Installation. NASA public domain image. Kennedy space center.

code Related

Sydöstra Sveriges Skogsägares Förbund, Mörrums Bruk

description

Summary

Sydöstra Sveriges Skogsägares Förbund, Mörrums Bruk

label_outline

Tags

sverige blekinge karlshamn mörrum morrum massaindustri byggnad kran seved walther sj reklamavdelning karlshamn sölvesborg karlshamn solvesborg blekinge kustbanor bkb 1067 ursprungsbolag järnvägsmuseet building railway museum man port crane pulp industry darkroom sj advertising department sweden high resolution factory industry railroad industry industrial facilities ultra high resolution construction sites building construction
date_range

Date

01/01/1961
create

Source

Digital museum
link

Link

https://digitaltmuseum.org/
copyright

Copyright info

No known restrictions on publication.

label_outline Explore Morrum, Morrum, Darkroom

Topics

sverige blekinge karlshamn mörrum morrum massaindustri byggnad kran seved walther sj reklamavdelning karlshamn sölvesborg karlshamn solvesborg blekinge kustbanor bkb 1067 ursprungsbolag järnvägsmuseet building railway museum man port crane pulp industry darkroom sj advertising department sweden high resolution factory industry railroad industry industrial facilities ultra high resolution construction sites building construction