visibility Similar

code Related

STS106-390-010 - STS-106 - View of the ARCU and TVIS installation area in Zvezda during STS-106

description

Summary

The original finding aid described this as:

Description: View of American-to-Russian Converter Units (ARCU) - voltage and current stabilizers - and the Treadmill Vibration Isolation System (TVIS) installation area in the Service Module (SM) / Zvezda during the STS-106 mission.

Subject Terms: STS-106, SERVICE MODULE, INTERNATIONAL SPACE STATION, TREADMILLS, PHYSICAL EXERCISE, VIBRATION DAMPING, VOLTAGE REGULATORS, CURRENT REGULATORS

Date Taken: 9/15/2000

Categories: Station Configuration

Interior_Exterior: Interior

Ground_Orbit: On-orbit

Original: Film - 35MM CN

Preservation File Format: TIFF

STS-106

Nothing Found.

label_outline

Tags

view arcu tvis installation tvis installation area zvezda sts 106 atlantis nasa international space station zvezda service module sts 106 service module sts 106 mission tiff sts 106 treadmill vibration isolation system installation area voltage regulators american to russian converter units station configuration current regulators voltage treadmills vibration physical exercise space program
date_range

Date

2000
create

Source

The U.S. National Archives
link

Link

https://catalog.archives.gov/
copyright

Copyright info

No known copyright restrictions

label_outline Explore Voltage Regulators, American To Russian Converter Units, Tvis Installation Area

STS106-375-013 - STS-106 - Flyaround views of the ISS taken from Atlantis during STS-106 mission

STS068-30-018 - STS-068 - Jones exercises on a treadmill

sts106-702-084 - STS-106 - Public domain NASA photogrpaph

STS106-372-019 - STS-106 - Views of the Node 1 hatch to PMA2 taken during STS-106 mission

STS106-311-013 - STS-106 - Flyaround views of the ISS taken from Atlantis during STS-106

STS106-304-035 - STS-106 - View of a pair of wire connections on Zvezda during STS-106

KENNEDY SPACE CENTER, FLA. -- During Crew Equipment Interface Test (CEIT) activities at SPACEHAB, members of the STS-106 crew check out a Russian foot restraint, equipment that will be part of the payload on their mission to the International Space Station. Around the table are Mission Specialist Yuri I. Malenchenko (back to camera), a SPACEHAB worker, and Mission Specialists Daniel C. Burbank (at end of table) and Edward T. Lu (right). Others at KSC for the CEIT are Commander Terrence W. Wilcutt, Pilot Scott D. Altman, and Mission Specialists Boris V. Morukov and Richard A. Mastracchio. Malenchenko and Morukov represent the Russian Aviation and Space Agency. On the 11-day mission, the seven-member crew will perform support tasks on orbit, transfer supplies and prepare the living quarters in the newly arrived Zvezda Service Module for the first long-duration crew, dubbed “Expedition One,” which is due to arrive at the Station in late fall. STS-106 is scheduled to launch Sept. 8, 2000, at 8:31 a.m. EDT from Launch Pad 39B KSC00pp0961

S74E5202 - STS-106 - Public domain NASA photogrpaph

S106E5022 - STS-106 - Commander Wilcutt at work aboard Atlantis during STS-106

STS110-341-002 - STS-110 - View of the S0 Truss being moved into installation position by the SSRMS during STS-110

KENNEDY SPACE CENTER, FLA. -- As part of Crew Equipment Interface Test (CEIT) activities at SPACEHAB, members of the STS-106 crew check out a Maximum Envelope Support Structure (MESS) rack they will be using during their mission to the International Space Station. Seen here (with backs to camera, in uniform) are Mission Specialist Richard A. Mastracchio, Pilot Scott D. Altman, Boris V. Morukov, and Edward T. Lu (at right). Also taking part in the CEIT are Commander Terrence W. Wilcutt and Mission Specialists Yuri I. Malenchenko and Daniel C. Burbank. Malenchenko and Morukov represent the Russian Aviation and Space Agency. STS-106 is scheduled to launch Sept. 8, 2000, at 8:31 a.m. EDT from Launch Pad 39B on an 11-day mission. The seven-member crew will prepare the Space Station for its first resident crew and begin outfitting the newly arrived Zvezda Service Module. They will perform support tasks on orbit, transfer supplies and prepare the Zvezda living quarters for the first long-duration crew, dubbed “Expedition One,” which is due to arrive at the Station in late fall KSC00pp0952

s133E012090 - STS-133 - Boe exercises with aRED

Topics

view arcu tvis installation tvis installation area zvezda sts 106 atlantis nasa international space station zvezda service module sts 106 service module sts 106 mission tiff sts 106 treadmill vibration isolation system installation area voltage regulators american to russian converter units station configuration current regulators voltage treadmills vibration physical exercise space program