visibility Similar

code Related

STS-133 Discovery Preps for ET-137 Work in VAB STS-133

description

Summary

STS-133 Discovery Preps for ET-137 Work in VAB

Nothing Found.

label_outline

Tags

kennedy space center sts discovery preps discovery preps et vab vab sts vehicle assembly building high resolution nasa
date_range

Date

22/12/2010
place

Location

KSC - VAB
create

Source

NASA
link

Link

https://images.nasa.gov/
copyright

Copyright info

Public Domain Dedication (CC0)

label_outline Explore Vab Sts, Preps, Discovery

[Assignment: 48-DPA-09-24-08_SOI_K_NYC_NPF] National Park Foundation annual gala and fundraiser [at the Chelsea Piers,] New York City, New York, with Secretary Dirk Kempthorne [joining First Lady Laura Bush, National Park Foundation Board member Roland Betts, National Park Foundation Vice Chair Regan Gammon, and Discovery Communications President and Chief Executive Officer David Zazlav among the dignitaries delivering remarks] [48-DPA-09-24-08_SOI_K_NYC_NPF_DOI_9918.JPG]

CAPE CANAVERAL, Fla. -- A "towback" vehicle slowly pulls shuttle Endeavour from the Shuttle Landing Facility to Orbiter Processing Facility-1 at NASA's Kennedy Space Center in Florida. A purge unit that pumps conditioned air into a shuttle after landing is connected to Endeavour's aft end. In the background is the massive Vehicle Assembly Building. Once inside the processing facility, Endeavour will be prepared for future public display. Endeavour's final return from space completed the 16-day, 6.5-million-mile STS-134 mission. Main gear touchdown was at 2:34:51 a.m. EDT, followed by nose gear touchdown at 2:35:04 a.m., and wheelstop at 2:35:36 a.m. Endeavour and its crew delivered the Alpha Magnetic Spectrometer-2 (AMS) and the Express Logistics Carrier-3 (ELC-3) to the International Space Station. AMS will help researchers understand the origin of the universe and search for evidence of dark matter, strange matter and antimatter from the station. ELC-3 carried spare parts that will sustain station operations once the shuttles are retired from service. STS-134 was the 25th and final flight for Endeavour, which spent 299 days in space, orbited Earth 4,671 times and traveled 122,883,151 miles. Photo credit: NASA/Jack Pfaller KSC-2011-4273

[Assignment: 48-DPA-09-24-08_SOI_K_NYC_NPF] National Park Foundation annual gala and fundraiser [at the Chelsea Piers,] New York City, New York, with Secretary Dirk Kempthorne [joining First Lady Laura Bush, National Park Foundation Board member Roland Betts, National Park Foundation Vice Chair Regan Gammon, and Discovery Communications President and Chief Executive Officer David Zazlav among the dignitaries delivering remarks] [48-DPA-09-24-08_SOI_K_NYC_NPF_IOD_4343.JPG]

CAPE CANAVERAL, Fla. – Tracey Kickbusch, chief of computational sciences at NASA's Kennedy Space Center in Florida, discusses modeling and simulations with attendees at the Technology Transfer Forum of the Economic Development Commission of Florida's Space Coast. A goal of the session was to showcase ways commercial businesses can work with NASA to develop technology and apply existing technology to commercial uses. Photo credit: NASA/Glenn Benson KSC-2013-3570

STS060-56-016 - STS-060 - Earth observations taken during the STS-60 mission

AIRMAN Lance Murphy, USAF, Assistant Dedicated Crew CHIEF (ADCC), 510th Fighter Squadron, Aviano Air Base, Italy, preps his jet for launch

CAPE CANAVERAL, Fla. – As part of NASA's Ground Systems Development and Operations Program at the Kennedy Space Center in Florida, a large space shuttle-era work platform is being lowered and removed from high bay 3 of the Vehicle Assembly Building, or VAB. The work is part of a center-wide modernization and refurbishment initiative to accommodate NASA’s Space Launch System and a variety of other spacecraft instead of the whole building supporting one design. The Ground Systems Development and Operations Program is developing the necessary ground systems, infrastructure and operational approaches required to safely process, assemble, transport and launch the next generation of rockets and spacecraft in support of NASA’s exploration objectives. Future work also will replace the antiquated communications, power and vehicle access resources with modern efficient systems. Some of the utilities and systems slated for replacement have been used since the VAB opened in 1965. For more information, visit http://www.nasa.gov/exploration/systems/ground/index.html Photo credit: NASA/Jim Grossmann KSC-2012-5965

STS082-372-019 - STS-082 - Earth observations taken from shuttle orbiter Discovery during STS-82 mission

41D-37-093 - STS-41D - OAST-1 payload in the Discovery's payload bay

MERCURY MISSION CONTROL CENTER (MCC) DEMOLITION PROGRESS 2010-3488

STS063-52-021 - STS-063 - Mir hardware and modules as viewed from Discovery

STS085-755-041 - STS-085 - Earth observations taken from orbiter Discovery during STS-85 mission

Topics

kennedy space center sts discovery preps discovery preps et vab vab sts vehicle assembly building high resolution nasa