visibility Similar

STS-132 - LAUNCH - Public domain NASA photogrpaph

CAPE CANAVERAL, Fla. - On Launch Pad 39A at NASA's Kennedy Space Center, the payload canister is lifted toward the payload changeout room above. The canister contains four carriers holding various equipment for the STS-125 mission aboard space shuttle Atlantis to service NASA’s Hubble Space Telescope. The changeout room is the enclosed, environmentally controlled portion of the rotating service structure that supports cargo delivery to the pad and subsequent vertical installation into the shuttle’s payload bay. Launch of Atlantis is targeted for Oct. 10. Photo credit: NASA/Jack Pfaller KSC-08pd2797

View of Discovery approaching the ISS for docking during the STS-105 mission

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, space shuttle Discovery is ready for its nighttime trek, known as "rollout," from the Vehicle Assembly Building to Launch Pad 39A. It will take the shuttle, attached to its external fuel tank, twin solid rocket boosters and mobile launcher platform, about six hours to complete the move atop a crawler-transporter. Rollout sets the stage for Discovery's STS-133 crew to practice countdown and launch procedures during the Terminal Countdown Demonstration Test in mid-October. Targeted to liftoff Nov. 1, Discovery will take the Permanent Multipurpose Module (PMM) packed with supplies and critical spare parts, as well as Robonaut 2 (R2) to the International Space Station. Photo credit: NASA/Mic Miracle KSC-2010-4719

CAPE CANAVERAL, Fla. -- Xenon lights illuminate space shuttle Discovery as it makes its nighttime trek, known as "rollout," from the Vehicle Assembly Building to Launch Pad 39A at NASA's Kennedy Space Center in Florida. It will take the shuttle, attached to its external fuel tank, twin solid rocket boosters and mobile launcher platform, about seven hours to complete the move. This is the second time Discovery has rolled out to the pad for the STS-133 mission, and comes after a thorough check and modifications to the shuttle's external tank. Targeted to liftoff Feb. 24, Discovery will take the Permanent Multipurpose Module (PMM) packed with supplies and critical spare parts, as well as Robonaut 2 (R2) to the International Space Station. For more information on STS-133, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts133/. Photo credit: NASA/Frank Michaux KSC-2011-1337

CAPE CANAVERAL, Fla. – Space shuttle Endeavour arrives at the Shuttle Landing Facility after the shuttle was towed from the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida. Endeavour was towed to the Mate-Demate Device, or MDD, where the shuttle will be lifted and connected to the top of NASA's Shuttle Carrier Aircraft SCA, a modified 747 jetliner. The shuttle has been fitted with an aerodynamic tailcone for its flight aboard the SCA to Los Angeles where it will be placed on public display. Photo credit: NASA/Kim Shiflett KSC-2012-5095

STS-132 - LAUNCH - Public domain NASA photogrpaph

CAPE CANAVERAL, Fla. – A close-up of Atlantis as the space shuttle moves from Orbiter Processing Facility-2 to the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida. Atlantis will be moved to the Kennedy Space Center Visitor Complex in November where it will be placed on public display. Photo credit: NASA/Jim Grossmann KSC-2012-5864

CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, a large yellow, metal sling lifts shuttle Discovery from the transfer aisle into High Bay 3 of the Vehicle Assembly Building. In the bay, the shuttle will be attached to its external fuel tank and solid rocket boosters. The operation began Sept. 9 and wrapped up early Sept. 10. Discovery is scheduled to roll out to Launch Pad 39A later this month in preparation for its launch to the International Space Station on the STS-133 mission. Targeted to lift off Nov. 1, Discovery will take the Permanent Multipurpose Module (PMM) packed with supplies and critical spare parts, as well as Robonaut 2 (R2) to the station. Photo credit: NASA/Jack Pfaller KSC-2010-4622

code Related

STS-132 - LAUNCH - Public domain NASA photogrpaph

description

Summary

Description: SEQUENTIAL STILL COVERAGE OF LIFTOFF. FRAME VEHICLE AND LAUNCHER PLUS ONE VEHICLE LENGTH.

* FOCUS ON VEHICLE USING CAMERA FINDER. ** AS SELECTED BY PHOTOGRAPHER.

Item: DD071-39A

Date Taken: 5/14/2010

Image Type: DIGITAL STILLS

STS132 LAUNCH AND LANDING

label_outline

Tags

sts 132 atlantis nasa launch and landing high resolution ultra high resolution one vehicle length frame vehicle vehicle digital stills sts 132 camera finder space program
date_range

Date

25/07/2005 - 21/07/2011
create

Source

The U.S. National Archives
link

Link

https://catalog.archives.gov/
copyright

Copyright info

No known copyright restrictions

label_outline Explore Digital Stills Sts 132, Camera Finder, One Vehicle Length

Topics

sts 132 atlantis nasa launch and landing high resolution ultra high resolution one vehicle length frame vehicle vehicle digital stills sts 132 camera finder space program