visibility Similar

STS-133 - EOM - Public domain NASA photogrpaph

Landing views of STS-92 at Edwards Air Force Base

KENNEDY SPACE CENTER, Fla. -- With its drag chute just beginning to open, orbiter Discovery and its crew land on KSC's Shuttle Landing Facility runway 15. Main gear touchdown was at 2:22:58 p.m. EDT; wheel stop, at 2:24:06 p.m. EDT. The 11-day, 21-hour, 12-minute STS-105 mission accomplished the goals set for the 11th flight to the International Space Station: swapout of the resident Station crew; delivery of equipment, supplies and scientific experiments; and installation of the Early Ammonia Servicer and heater cables for the S0 truss on the Station. Discovery traveled 4.3 million miles on its 30th flight into space, the 106th mission of the Space Shuttle program. Out of five missions in 2001, the landing was the first to occur in daylight at KSC KSC-01pp1483

STS-119 - EOM - Public domain NASA photogrpaph

STS-131 - EOM - Public domain NASA photogrpaph

KENNEDY SPACE CENTER, FLA. - The Space Shuttle orbiter Atlantis is turned into position outside the Orbiter Processing Facility (OPF) for its tow to the Vehicle Assembly Building (VAB). The move will allow work to be performed in the OPF that can only be accomplished while the bay is empty. Work scheduled in the processing facility includes annual validation of the bay's cranes, work platforms, lifting mechanisms, and jack stands. Atlantis will remain in the VAB for about 10 days, then return to the OPF as work resumes to prepare it for launch in September 2004 on the first return-to-flight mission, STS-114.

STS-127 - EOM - Public domain NASA photogrpaph

A left front view of the space shuttle Enterprise mounted on top of a specially-prepared NASA 747 aircraft

STS-133 - EOM - Public domain NASA photogrpaph

code Related

STS-131 - EOM - Public domain NASA photogrpaph

description

Summary

Description: TRACKING COVERAGE OF LANDING FROM ORB LANDING GEAR ACTIVATION THROUGH TOUCHDOWN AND WHEEL-STOP. CAMERA SHOULD BE STARTED NO LATER THAN APPROX. L-5 SECONDS. COMMITTED ONLY FOR RUNWAY 15 (NORTH TO SOUTH) LANDING

White Balance - set to full daylight

camera set to continuos low (CL)

Item: DL014-EOM

Date Taken: 4/20/2010

Image Type: DIGITAL STILLS

STS131 LAUNCH AND LANDING

Nothing Found.

label_outline

Tags

eom sts 131 discovery nasa launch and landing landing gear high resolution ultra high resolution landing orb landing gear activation daylight camera digital stills sts 131 camera l 5 seconds white balance space program
date_range

Date

25/07/2005 - 21/07/2011
create

Source

The U.S. National Archives
link

Link

https://catalog.archives.gov/
copyright

Copyright info

No known copyright restrictions

label_outline Explore Digital Stills Sts 131, White Balance, Orb Landing Gear Activation

Topics

eom sts 131 discovery nasa launch and landing landing gear high resolution ultra high resolution landing orb landing gear activation daylight camera digital stills sts 131 camera l 5 seconds white balance space program